[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1100037":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1100037,779,1,"单选题","建设工程设计合同，除专用合同条款另有约定外，因发包人原因造成合同签订之日起（）天内未能发出开始设计通知的，设计人有权提出价格调整要求，或者解除合同。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","14",false,{"key":16,"text":17,"correct":14},"B","30",{"key":19,"text":20,"correct":14},"C","60",{"key":22,"text":23,"correct":24},"D","90",true,"2020版教材P85-88 除专用合同条款另有约定外，因发包人原因造成合同签订之日起90 天内未能发出开始设计通知的，设计人有权提出价格调整要求，或者解除合同。发包人应当承担由此增加的费用和(或)周期延误。",{"id":6,"name":27,"category":28,"favorite":29},"合同管理","建筑工程",0]