[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1100004":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1100004,779,1,"单选题","除专用合同条款另有约定外，发包人应在开始勘察前（）日内，向勘察人提供测量基准点、水准点和书面资料等",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","3",false,{"key":16,"text":17,"correct":18},"B","7",true,{"key":20,"text":21,"correct":14},"C","14",{"key":23,"text":24,"correct":14},"D","28","2020版教材P78-83 除专用合同条款另有约定外，发包人应在开始勘察前7 日内，向勘察人提供测量基准点、水准点和书面资料等。",{"id":6,"name":27,"category":28,"favorite":29},"合同管理","建筑工程",0]