[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-141850":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},141850,77,1,"单选题","景区通过委托方式确定规划编制单位，其方法不包括( )。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","公开招标",false,{"key":16,"text":17,"correct":14},"B","邀请招标",{"key":19,"text":20,"correct":14},"C","直接委托",{"key":22,"text":23,"correct":24},"D","业务外包",true,"景区通过委托方式确定编制单位，其方法通常有：①公开招标，是景区以招标公告的方式邀请不特定的旅游规划设计单位投标；②邀请招标，是委托方以投标邀请书的方式邀请特定的旅游规划设计单位投标；③直接委托，是委托方直接委托某一特定规划设计单位进行旅游规划的编制工作。",{"id":6,"name":27,"category":28,"favorite":29},"(高级) 旅游经济","经济金融",0]