[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-755-31":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":587},{"id":5,"name":6,"category":7,"favorite":8},755,"电气工程师供配电专业","建筑工程",0,31,50,2321,[13,34,48,60,73,86,97,110,122,135,148,158,170,182,194,206,218,229,239,251,263,271,282,294,306,314,323,334,346,357,368,379,388,396,407,418,428,439,450,462,472,484,491,503,515,527,539,551,563,575],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":32,"analysis":33},1034273,2,"多选题","中断供电将造成重大政治、经济损失的例子包括（）",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","重大设备损坏、重大产品报废；",true,{"key":24,"text":25,"correct":22},"B","B用重要原料生产的产品大量报废；",{"key":27,"text":28,"correct":22},"C","有害物质溢出严重污染环境；",{"key":30,"text":31,"correct":22},"D","国民经济中重点企业的连续生产过程被打乱需要长时间才能恢复。","ABCD","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":47,"analysis":33},1034275,"下列建筑物、储罐（区）和堆场的消防用电设备应为一级负荷的是（ )",[38,40,43,45],{"key":20,"text":39,"correct":22},"建筑高度超过50m的乙、丙类厂房和丙类仓库；",{"key":24,"text":41,"correct":42},"室外消防用水量大于30L\u002Fs的工厂、仓库；",false,{"key":27,"text":44,"correct":42},"室外消防用水量大于35L\u002Fs的可燃材料堆场、可燃气体储罐和甲、乙类液体储罐；",{"key":30,"text":46,"correct":22},"一类高层建筑。","AD",{"id":49,"libraryId":5,"type":15,"typeLabel":16,"stem":50,"options":51,"answer":59,"analysis":33},1034277,"下列建筑物、储罐（区）和堆场的消防用电设备应为二级负荷的是（ ）。",[52,53,55,57],{"key":20,"text":41,"correct":22},{"key":24,"text":54,"correct":22},"室外消防用水量大于35L\u002FS的可燃材料堆场、可燃气体储罐和甲、乙类液体储罐",{"key":27,"text":56,"correct":22},"二类高层建筑",{"key":30,"text":58,"correct":42},"D-建筑高庋超过50m的乙、丙类厂房和两类仓库。","ABC",{"id":61,"libraryId":5,"type":15,"typeLabel":16,"stem":62,"options":63,"answer":72,"analysis":33},1034279,"下列建筑物的消防用电设备为三级负荷的是（）。",[64,66,68,70],{"key":20,"text":65,"correct":42},"二类高层建筑。",{"key":24,"text":67,"correct":42},"室外消防用水量大于25L\u002Fs的公共建筑；",{"key":27,"text":69,"correct":22},"室外消防用水量为25L\u002Fs及以下的公共建筑；",{"key":30,"text":71,"correct":22},"室外消防用水量为30L\u002Fs及以下的工厂、仓库。","CD",{"id":74,"libraryId":5,"type":15,"typeLabel":16,"stem":75,"options":76,"answer":85,"analysis":33},1034289,"下列建筑物的消防用电设备应为二级负荷的是（ ）。",[77,79,81,83],{"key":20,"text":78,"correct":22},"座位数超过1500个的电影院、剧院；",{"key":24,"text":80,"correct":42},"座位数为3000个的体育馆；",{"key":27,"text":82,"correct":22},"任一层建筑面积大于3000m2的商店、展览建筑；",{"key":30,"text":84,"correct":42},"除首层外，其他层建筑面积均不大于3000m2的商店、展览建筑。","AC",{"id":87,"libraryId":5,"type":15,"typeLabel":16,"stem":88,"options":89,"answer":47,"analysis":33},1034291,"下列建筑物的消防用电设备可为三级负荷的是（)",[90,92,94,95],{"key":20,"text":91,"correct":22},"座位数为1500个的电影院、剧院；",{"key":24,"text":93,"correct":42},"座位数超过3000个的体育馆；",{"key":27,"text":82,"correct":42},{"key":30,"text":96,"correct":22},"各层建筑面积均不大于3000m2的商店、展览建筑。",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":109,"analysis":33},1034294,"下列电梯应按一级负荷供电的是（ )",[101,103,105,107],{"key":20,"text":102,"correct":42},"一类高层建筑的自动扶梯；",{"key":24,"text":104,"correct":22},"一、二级旅馆的服务梯；",{"key":27,"text":106,"correct":42},"一类高层建筑的客梯；",{"key":30,"text":108,"correct":22},"一、二级旅馆的主要客梯.","BD",{"id":111,"libraryId":5,"type":15,"typeLabel":16,"stem":112,"options":113,"answer":121,"analysis":33},1034296,"下列电梯应按二级负荷供电的是（)",[114,116,117,119],{"key":20,"text":115,"correct":22},"三级旅馆的主要客梯；",{"key":24,"text":106,"correct":22},{"key":27,"text":118,"correct":42},"县级以上医院的客梯;",{"key":30,"text":120,"correct":42},"一般自动扶梯。","AB",{"id":123,"libraryId":5,"type":15,"typeLabel":16,"stem":124,"options":125,"answer":134,"analysis":33},1034298,"下列电源可作为应急电源的是（ ）。",[126,128,130,132],{"key":20,"text":127,"correct":22},"独立于正常电源的发电机組；",{"key":24,"text":129,"correct":22},"供电网络中，独立于正常电源的放射式线路；",{"key":27,"text":131,"correct":42},"供电网络中，独立于正常电源的环式线路；",{"key":30,"text":133,"correct":22},"蓄电池或干电池。","ABD",{"id":136,"libraryId":5,"type":15,"typeLabel":16,"stem":137,"options":138,"answer":147,"analysis":33},1034301,"允许中断供电时间为毫秒级的供电，其应急电源可选择（ ）。",[139,141,143,145],{"key":20,"text":140,"correct":42},"快速自起动的柴油发电机组；",{"key":24,"text":142,"correct":22},"蓄电池静止型不间断供电装置；",{"key":27,"text":144,"correct":22},"蓄电池机械储能电机型不间断供电装置；",{"key":30,"text":146,"correct":42},"带自动投入装置的独立于正常电源的专用馈电线路。","BC",{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":109,"analysis":33},1034303,"允许中断供电时间为1. 5s以上者，其应急电源可选择（ ）。",[152,153,154,156],{"key":20,"text":140,"correct":42},{"key":24,"text":142,"correct":22},{"key":27,"text":155,"correct":42},"带自动投入装直的备用联络线；",{"key":30,"text":157,"correct":22},"带自动投入装置的独立于正常电源的专用馈电线路",{"id":159,"libraryId":5,"type":15,"typeLabel":16,"stem":160,"options":161,"answer":72,"analysis":33},1034306,"根据允许中断供电时间选择应急电源，正确的是（ ）。",[162,164,166,168],{"key":20,"text":163,"correct":42},"允许中断供电时间为毫秒级时，可选择带自动投入装置的，独立于正常电源的专用 馈电线路；",{"key":24,"text":165,"correct":42},"允许中断供电时间为1.5s以上时，可选择快速自起动的柴油发电机组；",{"key":27,"text":167,"correct":22},"允许中断供电时间为1.5s以上时，可选择带自动投入装置的，独立于正常电源的专 用馈电线路；",{"key":30,"text":169,"correct":22},"允许中断供电时间为毫秒级时，蓄电池静止型不间断供电装里。",{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":85,"analysis":33},1034308,"一级负荷对供电电源的要求是（ ）。",[174,176,178,180],{"key":20,"text":175,"correct":22},"应由两个电源供电，当一个电源发生故障时，另一个电源不致同时受到损坏：",{"key":24,"text":177,"correct":42},"在负荷较小或地区供电条件困难时，可由一回6kV及以上的专用线路供电；",{"key":27,"text":179,"correct":22},"在地区供电条件不能满足要求时，应设自备电源作为第二电源；",{"key":30,"text":181,"correct":42},"应由两回及以上线路供电，当任一线路发生故障时，其余线路应能承受100%全部 一级负荷和二级负荷。",{"id":183,"libraryId":5,"type":15,"typeLabel":16,"stem":184,"options":185,"answer":147,"analysis":33},1034310,"二级负荷对供电电源的要求是（）。",[186,188,190,192],{"key":20,"text":187,"correct":42},"应由两个电源供电；",{"key":24,"text":189,"correct":22},"应由两SI线路供电；",{"key":27,"text":191,"correct":22},"C在负荷较小或地区供电条件困难时，可由一回6kV及以上的专用架空线路供电；",{"key":30,"text":193,"correct":42},"在负荷较小或地区供电条件困难时，可由一根6kV及以上的专用电缆线路供电",{"id":195,"libraryId":5,"type":15,"typeLabel":16,"stem":196,"options":197,"answer":109,"analysis":33},1034313,"在负荷较小或地区供电条件困难时，二级负荷可由一回6kV及以上的线路供电， 但应同时满足（）要求。",[198,200,202,204],{"key":20,"text":199,"correct":42},"如为架空线路，应装设自动重合闸装置；",{"key":24,"text":201,"correct":22},"B如为电缆线路，应由两根电缆组成，每根电缆应能承受100%二级负荷；",{"key":27,"text":203,"correct":42},"无论是架空或电缆线路，均应为中性点不接地系统；",{"key":30,"text":205,"correct":22},"无论是架空或电缆线路，均应为专用回路。",{"id":207,"libraryId":5,"type":15,"typeLabel":16,"stem":208,"options":209,"answer":27,"analysis":33},1034316,"采用需要系数法求某车间的计箅负荷。已知数据见表3-1。",[210,212,214,216],{"key":20,"text":211,"correct":42},"整流弧焊机的设备功率应为（ ）。",{"key":24,"text":213,"correct":42},"25kW, B 35kW；",{"key":27,"text":215,"correct":22},"45kW；",{"key":30,"text":217,"correct":42},"55kW。",{"id":219,"libraryId":5,"type":15,"typeLabel":16,"stem":208,"options":220,"answer":20,"analysis":33},1034318,[221,223,225,227],{"key":20,"text":222,"correct":22},"点焊机的设备功率应为（ ）。",{"key":24,"text":224,"correct":42},"20kW； B 30kW；",{"key":27,"text":226,"correct":42},"40kW；",{"key":30,"text":228,"correct":42},"50kW。",{"id":230,"libraryId":5,"type":15,"typeLabel":16,"stem":231,"options":232,"answer":24,"analysis":33},1034321,"采用需要系数法求某车间的计箅负荷。已知数据见表3-1。 起重机的设备功率应为（ ）。",[233,235,237,238],{"key":20,"text":234,"correct":42},"20kW；",{"key":24,"text":236,"correct":22},"30kW；",{"key":27,"text":226,"correct":42},{"key":30,"text":228,"correct":42},{"id":240,"libraryId":5,"type":15,"typeLabel":16,"stem":241,"options":242,"answer":30,"analysis":33},1034324,"采用需要系数法求某车间的计箅负荷。已知数据见表3-1。 本案例的单相负荷属于（ ）。",[243,245,247,249],{"key":20,"text":244,"correct":42},"既有线间负荷又有相负荷，应按精确法换算；",{"key":24,"text":246,"correct":42},"只有相负荷，应按简化法换算；",{"key":27,"text":248,"correct":42},"只有线间负荷，应按简化法换算；",{"key":30,"text":250,"correct":22},"设备功率不超过三相负荷设备功率之和的15%，不必换算。",{"id":252,"libraryId":5,"type":15,"typeLabel":16,"stem":253,"options":254,"answer":20,"analysis":33},1034326,"弧焊变压器的设备功率应为（ ）。",[255,257,259,261],{"key":20,"text":256,"correct":22},"26kW；",{"key":24,"text":258,"correct":42},"33kW;",{"key":27,"text":260,"correct":42},"40kW;",{"key":30,"text":262,"correct":42},"47kW.",{"id":264,"libraryId":5,"type":15,"typeLabel":16,"stem":265,"options":266,"answer":24,"analysis":33},1034329,"点焊机的设备功率应为（ ）。 A. 10kW； B 40kW； C 70kW； D. IOOkW",[267,268,269,270],{"key":20,"text":20,"correct":42},{"key":24,"text":24,"correct":22},{"key":27,"text":27,"correct":42},{"key":30,"text":30,"correct":42},{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":24,"analysis":33},1034331,"缝焊机的设备功率应为（ ）。",[275,276,278,280],{"key":20,"text":226,"correct":42},{"key":24,"text":277,"correct":22},"64kW；",{"key":27,"text":279,"correct":42},"88kW",{"key":30,"text":281,"correct":42},"112kW",{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":27,"analysis":33},1034333,"假定单相电焊机的需要负荷（有功\u002F无功）在各线间分别为13kW\u002F21kvar、18kW\u002F 27kvar, 12kW\u002F20kvar,其等效三相负荷（有功\u002F无功）约为（ ）。",[286,288,290,292],{"key":20,"text":287,"correct":42},"24kW\u002F47kvar;",{"key":24,"text":289,"correct":42},"36kW\u002F60kvar；",{"key":27,"text":291,"correct":22},"48kW\u002F73kvar；",{"key":30,"text":293,"correct":42},"60kW\u002F86kvar。",{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":27,"analysis":33},1034336,"住户用电的设备功率应取（ ）.",[298,300,302,304],{"key":20,"text":299,"correct":42},"360kW；",{"key":24,"text":301,"correct":42},"720kW",{"key":27,"text":303,"correct":22},"1080kW;",{"key":30,"text":305,"correct":42},"1200kW。",{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":27,"analysis":33},1034339,"空调的设备功率应取（ ）。 A. 40kW； B 80kW； C 120kW。",[310,311,312,313],{"key":20,"text":20,"correct":42},{"key":24,"text":24,"correct":42},{"key":27,"text":27,"correct":22},{"key":30,"text":30,"correct":42},{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":316,"answer":24,"analysis":33},1034340,[317,319,320,321],{"key":20,"text":318,"correct":42},"水泵的设备功率应取（ ）。",{"key":24,"text":234,"correct":22},{"key":27,"text":260,"correct":42},{"key":30,"text":322,"correct":42},"60kW。",{"id":324,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":325,"answer":20,"analysis":33},1034343,[326,328,330,332],{"key":20,"text":327,"correct":22},"该项目的总需要系数约为（ ）。",{"key":24,"text":329,"correct":42},"0.32; B 0.42;",{"key":27,"text":331,"correct":42},"0.52；",{"key":30,"text":333,"correct":42},"0.62。",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":24,"analysis":33},1034346,"采用需要系数法求某办公楼的计箅负荷.已知数据见表3-4。",[338,340,342,344],{"key":20,"text":339,"correct":42},"应急照明的设备功率应取（ ）。",{"key":24,"text":341,"correct":22},"168kW；",{"key":27,"text":343,"correct":42},"50kW；",{"key":30,"text":345,"correct":42},"OltW。",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":348,"answer":24,"analysis":33},1034349,[349,351,353,355],{"key":20,"text":350,"correct":42},"水泵和风机的设备功率应取（ ）。",{"key":24,"text":352,"correct":22},"350kW；",{"key":27,"text":354,"correct":42},"200kW；",{"key":30,"text":356,"correct":42},"150kW。",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":359,"answer":20,"analysis":33},1034352,[360,362,364,366],{"key":20,"text":361,"correct":22},"电梯的设备功率应取（ ）。",{"key":24,"text":363,"correct":42},"80kW；",{"key":27,"text":365,"correct":42},"60kW；",{"key":30,"text":367,"correct":42},"20kW。",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":370,"answer":30,"analysis":33},1034353,[371,373,375,377],{"key":20,"text":372,"correct":42},"该项目的总需要系数约为（）。",{"key":24,"text":374,"correct":42},"0.34;",{"key":27,"text":376,"correct":42},"0.44； C 0.54；",{"key":30,"text":378,"correct":22},"0.64。",{"id":380,"libraryId":5,"type":15,"typeLabel":16,"stem":211,"options":381,"answer":27,"analysis":33},1034355,[382,384,386,387],{"key":20,"text":383,"correct":42},"25kW；",{"key":24,"text":385,"correct":42},"35kW;",{"key":27,"text":215,"correct":22},{"key":30,"text":217,"correct":42},{"id":389,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":390,"answer":20,"analysis":33},1034357,[391,392,393,394],{"key":20,"text":234,"correct":22},{"key":24,"text":236,"correct":42},{"key":27,"text":226,"correct":42},{"key":30,"text":395,"correct":42},"50kWo",{"id":397,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":398,"answer":27,"analysis":33},1034359,[399,401,403,405],{"key":20,"text":400,"correct":42},"按最大负荷时功率因数不低于0. 8的要求，所需的补偿容量应不小于（ ）。",{"key":24,"text":402,"correct":42},"21kvar；B 27kvar；",{"key":27,"text":404,"correct":22},"33kvar；",{"key":30,"text":406,"correct":42},"39kvar",{"id":408,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":409,"answer":30,"analysis":33},1034361,[410,412,414,416],{"key":20,"text":411,"correct":42},"补偿后计箅负荷的功率因数约为（）。",{"key":24,"text":413,"correct":42},"0.53； B 0.63;",{"key":27,"text":415,"correct":42},"0.73;",{"key":30,"text":417,"correct":22},"0.83。",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":420,"answer":27,"analysis":33},1034363,[421,423,425,426],{"key":20,"text":422,"correct":42},"电炉变压器的设备功率应为（ ）。",{"key":24,"text":424,"correct":42},"300kW； B330kW；",{"key":27,"text":299,"correct":22},{"key":30,"text":427,"correct":42},"390kW。",{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":430,"answer":30,"analysis":33},1034365,[431,433,435,437],{"key":20,"text":432,"correct":42},"起重机的设备功率应为（ ）。",{"key":24,"text":434,"correct":42},"77 kW； B 88kWi",{"key":27,"text":436,"correct":42},"94.9kW,",{"key":30,"text":438,"correct":22},"120kW。",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":441,"answer":24,"analysis":33},1034366,[442,444,446,448],{"key":20,"text":443,"correct":42},"有功功率同时系数取0.85;无功功率同时系数取0.95。变电所低压侧计箅负荷的 视在功率约为（ ）。",{"key":24,"text":445,"correct":22},"728kVA； B 758kVA;",{"key":27,"text":447,"correct":42},"786kVA；",{"key":30,"text":449,"correct":42},"816kV",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":24,"analysis":33},1034368,"装设电容器36kvai后的视在功率约为（ )",[454,456,458,460],{"key":20,"text":455,"correct":42},"36kVA；",{"key":24,"text":457,"correct":22},"48kVA；",{"key":27,"text":459,"correct":42},"60kVAi",{"key":30,"text":461,"correct":42},"75kV",{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":464,"answer":30,"analysis":33},1034371,[465,467,469,471],{"key":20,"text":466,"correct":42},"有功功率同时系数取0.9;无功功率同时系数取0.95。补偿前的视在功率约 为（ ）。",{"key":24,"text":468,"correct":42},"36kVA； B 48kVA；",{"key":27,"text":470,"correct":42},"60kVA5",{"key":30,"text":461,"correct":22},{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":27,"analysis":33},1034374,"采用需要系数法求某办公楼的计箅负荷.已知数据见表3-4。 有功功率同时系数取0.85;无功功率同时系数取0.95。该大厦计箅负荷的视在功 率约为（ ）。",[476,478,480,482],{"key":20,"text":477,"correct":42},"2730kVA；",{"key":24,"text":479,"correct":42},"3150kVA；",{"key":27,"text":481,"correct":22},"3570kVA；",{"key":30,"text":483,"correct":42},"3990kV",{"id":485,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":486,"answer":27,"analysis":33},1034376,[487,488,489,490],{"key":20,"text":477,"correct":42},{"key":24,"text":479,"correct":42},{"key":27,"text":481,"correct":22},{"key":30,"text":483,"correct":42},{"id":492,"libraryId":5,"type":15,"typeLabel":16,"stem":493,"options":494,"answer":24,"analysis":33},1034379,"有功功率同时系数取0.9;无功功率同时系数取0.95。该公寓计箅负荷的视在功率 约为（ ）。",[495,497,499,501],{"key":20,"text":496,"correct":42},"470kVA；",{"key":24,"text":498,"correct":22},"500kVA；",{"key":27,"text":500,"correct":42},"530kVA；",{"key":30,"text":502,"correct":42},"560kV",{"id":504,"libraryId":5,"type":15,"typeLabel":16,"stem":505,"options":506,"answer":24,"analysis":33},1034382,"为提高供电可靠性和灵活性，拟装设两台变压器，且负荷率不高于0.8。变压器容 量宜为（ ）",[507,509,511,513],{"key":20,"text":508,"correct":42},"IXlOOOkVA",{"key":24,"text":510,"correct":22},"2X500kVA",{"key":27,"text":512,"correct":42},"1X800kVA；",{"key":30,"text":514,"correct":42},"2X800kV",{"id":516,"libraryId":5,"type":15,"typeLabel":16,"stem":517,"options":518,"answer":20,"analysis":33},1034385,"有功功率同时系数取0.9;无功功率同时系数取0.95。该车间计箅负荷的视在功率 约为（ ）。",[519,521,523,525],{"key":20,"text":520,"correct":22},"121kVA；",{"key":24,"text":522,"correct":42},"152kVA；",{"key":27,"text":524,"correct":42},"183kVA;",{"key":30,"text":526,"correct":42},"214kV",{"id":528,"libraryId":5,"type":15,"typeLabel":16,"stem":529,"options":530,"answer":24,"analysis":33},1034387,"采用需要系数法求某车间的计箅负荷。已知数据见表3-1。 有功功率同时系数取0.9;无功功率同时系数取0.95。该车间计箅负荷的视在功率 约为（ ）。",[531,533,535,537],{"key":20,"text":532,"correct":42},"60kVA；",{"key":24,"text":534,"correct":22},"75kVA；",{"key":27,"text":536,"correct":42},"90kVA；",{"key":30,"text":538,"correct":42},"105kV",{"id":540,"libraryId":5,"type":15,"typeLabel":16,"stem":541,"options":542,"answer":121,"analysis":33},1034390,"当低压母线为双电源、变压器低压侧总开关和母线分段均采用低压断路器时，在 总开关的出线侧及母线分段开关的两側宜装设（ ）或（ ）。",[543,545,547,549],{"key":20,"text":544,"correct":22},"隔离开关；",{"key":24,"text":546,"correct":22},"隔离触头；",{"key":27,"text":548,"correct":42},"断路器；",{"key":30,"text":550,"correct":42},"带熔断器的负荷开关。",{"id":552,"libraryId":5,"type":15,"typeLabel":16,"stem":553,"options":554,"answer":121,"analysis":33},1034393,"10 (6) kV配电变压器一次侧开关（在变压器小室内或与变压器紧邻者）的装设, 符合规定的是（ ）。",[555,557,559,561],{"key":20,"text":556,"correct":22},"以树干式供电时，应装设带保护的开关设备或跌开式熔断器；",{"key":24,"text":558,"correct":22},"以放射式供电时，宜装置隔离开关或负荷开关，但当变压器就在本配电所内时可不 装设开关设备；",{"key":27,"text":560,"correct":42},"以放射式供电，变压器不在本配电所内且属不同单位管理、维护，可不装开关设备；",{"key":30,"text":562,"correct":42},"以树干式供电，变压器就在本配电所内，可不装开关设备。",{"id":564,"libraryId":5,"type":15,"typeLabel":16,"stem":565,"options":566,"answer":147,"analysis":33},1034396,"小型配电所宜采用全交流操作，相应的措施是（ ）。",[567,569,571,573],{"key":20,"text":568,"correct":42},"采用电磁操动机构；",{"key":24,"text":570,"correct":22},"采用弹簧储能操动机构；",{"key":27,"text":572,"correct":22},"采用去分流分闸；",{"key":30,"text":574,"correct":42},"采用电容器储能分闸.",{"id":576,"libraryId":5,"type":15,"typeLabel":16,"stem":577,"options":578,"answer":59,"analysis":33},1034398,"电能质量指标包括（ ）。",[579,581,583,585],{"key":20,"text":580,"correct":22},"电压质量指标（电压偏差、电压波动和闪变、电压不对称度）",{"key":24,"text":582,"correct":22},"波形质量指标（电压谐波畸变率和谐波电流含有率）；",{"key":27,"text":584,"correct":22},"C频率质量指标（频率偏差）；",{"key":30,"text":586,"correct":42},"供电可靠性。",[588,592,595,598,601,604],{"id":589,"name":590,"category":7,"favorite":591},1,"领导干部任职前廉政法规知识测试题",92,{"id":593,"name":594,"category":7,"favorite":589},595,"建筑结构与设备",{"id":596,"name":597,"category":7,"favorite":589},715,"招标采购专业知识与法律法规",{"id":599,"name":600,"category":7,"favorite":589},848,"市政方向-通用基础",{"id":602,"name":603,"category":7,"favorite":8},534,"BIM工程师",{"id":605,"name":603,"category":7,"favorite":8},535]