[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1035406":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},1035406,755,2,"多选题","( )应采用2.0级的有功电能表.",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","75kW及以上的电动机电力装里回路；",true,{"key":16,"text":17,"correct":18},"B","发电机电力装置回路；",false,{"key":20,"text":21,"correct":14},"C","在315kVA以下的变压器低压侧计费的电力用户电能计量点电力装置回路；",{"key":23,"text":24,"correct":14},"D","仅作为企业内部技术经济考核而不计费的线路和电力装置回路。","ACD","",{"id":6,"name":28,"category":29,"favorite":30},"电气工程师供配电专业","建筑工程",0]