[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1035401":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":24,"analysis":25},1035401,755,2,"多选题","( )应测量有功功率。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","35kV及以上的线路；",true,{"key":16,"text":17,"correct":14},"B","发电机电力装置回路；",{"key":19,"text":20,"correct":14},"C","专用旁路和兼用旁路的断路器回路；",{"key":22,"text":23,"correct":14},"D","根据生产工艺的要求，需监测有功功率的其他电力装置回路。","ABCD","",{"id":6,"name":27,"category":28,"favorite":29},"电气工程师供配电专业","建筑工程",0]