[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1034225":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},1034225,755,2,"多选题","单位指标法适用于（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","a.设备选定的工业厂房电力负荷计算;",false,{"key":16,"text":17,"correct":18},"B","b.设备未定的工业厂房电力负荷估算；",true,{"key":20,"text":21,"correct":18},"C","c.民用建筑照明负荷计算；",{"key":23,"text":24,"correct":14},"D","d.建筑设备机房电力负荷计算。","BC","",{"id":6,"name":28,"category":29,"favorite":30},"电气工程师供配电专业","建筑工程",0]