[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-751-52":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":613},{"id":5,"name":6,"category":7,"favorite":8},751,"电气工程师发输变电专业","建筑工程",0,52,50,2670,[13,35,48,61,73,86,99,111,124,136,149,161,173,186,198,211,223,235,247,259,271,283,295,307,319,331,339,352,360,372,384,396,408,420,432,444,456,466,478,489,501,513,525,537,549,561,573,585,593,601],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":33,"analysis":34},1024646,2,"多选题","根据煤炭资源、交通运输、环境保护、技术经济和电厂厂址等条件，从地理位置上来看，目前我国燃煤电厂建设的类型有（）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","坑口电厂；",true,{"key":24,"text":25,"correct":22},"B","路口电厂和港口电厂；",{"key":27,"text":28,"correct":29},"C","公用电厂；",false,{"key":31,"text":32,"correct":22},"D","负荷中心电厂。","ABD","",{"id":36,"libraryId":5,"type":15,"typeLabel":16,"stem":37,"options":38,"answer":47,"analysis":34},1024649,"电源规划设计应遵循的原则是（）。",[39,41,43,45],{"key":20,"text":40,"correct":22},"充足性；",{"key":24,"text":42,"correct":22},"可靠性；",{"key":27,"text":44,"correct":22},"灵活性；",{"key":31,"text":46,"correct":29},"选择性，","ABC",{"id":49,"libraryId":5,"type":15,"typeLabel":16,"stem":50,"options":51,"answer":60,"analysis":34},1024653,"电两规划设计的主要任务内容是（）。",[52,54,56,58],{"key":20,"text":53,"correct":22},"确定变电所布局和电两结构；",{"key":24,"text":55,"correct":29},"研究电源建设优化方案；",{"key":27,"text":57,"correct":22},"确定输电方式；",{"key":31,"text":59,"correct":22},"选择电网电压。","ACD",{"id":62,"libraryId":5,"type":15,"typeLabel":16,"stem":63,"options":64,"answer":47,"analysis":34},1024657,"规划的目标电网网架应该达到的基本要求包括（）。",[65,67,69,71],{"key":20,"text":66,"correct":22},"安全可靠、运行灵活、经济合理，具有一定的应变能力；",{"key":24,"text":68,"correct":22},"网络結构简单，适应大电厂接入，贯彻分层分区原则，避免两内环流；",{"key":27,"text":70,"correct":22},"远近结合，统筹考虑，重视送端和受端电网规划；",{"key":31,"text":72,"correct":29},"满足发电机无功平衡要求。",{"id":74,"libraryId":5,"type":15,"typeLabel":16,"stem":75,"options":76,"answer":85,"analysis":34},1024660,"我国现有主电网110kV及以上电压等级的配置是（）。",[77,79,81,83],{"key":20,"text":78,"correct":22},"110kV\u002F220kV\u002F500kV；",{"key":24,"text":80,"correct":29},"110kV\u002F330kV\u002F500kV；",{"key":27,"text":82,"correct":22},"110kV\u002F330kV\u002F750kV；",{"key":31,"text":84,"correct":29},"110kV\u002F220kV\u002F750kV。","AC",{"id":87,"libraryId":5,"type":15,"typeLabel":16,"stem":88,"options":89,"answer":98,"analysis":34},1024665,"我国220kV及以下电网电压等级配置有（ ）系列。",[90,92,94,96],{"key":20,"text":91,"correct":22},"10kV\u002F63kV\u002F220kV；",{"key":24,"text":93,"correct":22},"10（6）kV\u002F35kV\u002Fl10kV\u002F220kV；",{"key":27,"text":95,"correct":29},"35kV\u002F110kV\u002F220kV；",{"key":31,"text":97,"correct":29},"35kV\u002F63kV\u002F220kV。","AB",{"id":100,"libraryId":5,"type":15,"typeLabel":16,"stem":101,"options":102,"answer":47,"analysis":34},1024668,"合理的电网结构是电力系统安全稳定运行的基础，合理的电网结构应满足的基本要求是（）。",[103,105,107,109],{"key":20,"text":104,"correct":22},"具有一定的炅活性，适应系统发展要求；",{"key":24,"text":106,"correct":22},"应有较大的抗扰动能力，任一元件无故障断开应保持系统稳定运行，其他元件不超过规定的亊故过负荷和电压偏差在允许范围内；",{"key":27,"text":108,"correct":22},"满足分层和分区原则；",{"key":31,"text":110,"correct":29},"减少系统短路电流。",{"id":112,"libraryId":5,"type":15,"typeLabel":16,"stem":113,"options":114,"answer":123,"analysis":34},1024672,"500kV电网由于长线电容效应、不对称接地故障和甩负荷原因可能引起工频过电压超过允许水平，降低工频过电压的主要措施包括（）。",[115,117,119,121],{"key":20,"text":116,"correct":29},"在线路两端设里低压并联电抗器；",{"key":24,"text":118,"correct":22},"在线路上设置髙压并联电杭器；",{"key":27,"text":120,"correct":29},"降低发电机运行电压；",{"key":31,"text":122,"correct":22},"线路釆用良导体地线。","BD",{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":47,"analysis":34},1024676,"额定功率因数直接影响发电机无功功率，根据电厂地理位置和在电力系统中地位作用，发电机功率因数一般采用下列（）的参考值。 A.直接接入330~500kV电网：送端的发电机一般选择不低于0.90,受端的发电机可",[128,130,132,134],{"key":20,"text":129,"correct":22},"在0.85~0.90中选择；",{"key":24,"text":131,"correct":22},"直流输电系统送端的发电机可选择0.85；",{"key":27,"text":133,"correct":22},"交、直流混合送电系统的发电机可在0.85~0.90中选择；",{"key":31,"text":135,"correct":29},"其他发电机可按高于0.80~0.85以上来选择。",{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":138,"options":139,"answer":148,"analysis":34},1024679,"水轮发电机在作调相运行时也是电力系统的无功电源之一，下面关于对水轮发电机的调相问题叙述中，不正确的是（）。",[140,142,144,146],{"key":20,"text":141,"correct":22},"远离负荷中心的水轮发电机也应考虑调相运行；",{"key":24,"text":143,"correct":29},"应配备有作调相运行的专门设施；",{"key":27,"text":145,"correct":29},"经技术经济比较认为有必要时，水轮发电机可考虑调相运行；",{"key":31,"text":147,"correct":22},"水轮发电机调相运行时只发出无功功率，不发有功功率，也不消耗有功功率。","AD",{"id":150,"libraryId":5,"type":15,"typeLabel":16,"stem":151,"options":152,"answer":60,"analysis":34},1024683,"发电机升压变压器调压方式选择原则是（）。",[153,155,157,159],{"key":20,"text":154,"correct":22},"一般选用无励磁调压型；",{"key":24,"text":156,"correct":29},"—般应选用有载调压型；",{"key":27,"text":158,"correct":22},"经计算电压偏差超出允许范围的可考虑选用有载调压型；",{"key":31,"text":160,"correct":22},"当采用无功补偿等措施无效果或不经济时，可选用有载调压型。",{"id":162,"libraryId":5,"type":15,"typeLabel":16,"stem":163,"options":164,"answer":123,"analysis":34},1024687,"屋外配电装置的安全净距中，A2值的适应范围为（）。",[165,167,169,171],{"key":20,"text":166,"correct":29},"带电部分至接地部分之间；",{"key":24,"text":168,"correct":22},"不同相的带电部分之间；",{"key":27,"text":170,"correct":29},"网状遮栏向上延伸线距地2. 5m处与遮栏上方带电部分之间；",{"key":31,"text":172,"correct":22},"断路器和隔离开关断口两侧引线带电部分之间.",{"id":174,"libraryId":5,"type":15,"typeLabel":16,"stem":175,"options":176,"answer":185,"analysis":34},1024691,"屋外配电装置的安全净距中，C值的适应范围为（）。",[177,179,181,183],{"key":20,"text":178,"correct":29},"平行的不同时停电检修的无遮栏带电部分之间；",{"key":24,"text":180,"correct":29},"带电部分与建筑物、构筑物的边缘部分之间；",{"key":27,"text":182,"correct":22},"无遮栏裸导体与地面之间；",{"key":31,"text":184,"correct":22},"无遮栏裸导体与建筑物、构筑物顶部之间。","CD",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":98,"analysis":34},1024695,"屋外配电装置架构的荷载条件，应符合的主要要求为.（）。",[190,192,194,196],{"key":20,"text":191,"correct":22},"架构宜根据实际受力条件，分别按终端或中间架构设计；",{"key":24,"text":193,"correct":22},"架构设计不考虑断线；",{"key":27,"text":195,"correct":29},"安装紧线时，应考虑导线上人荷载2000N;",{"key":31,"text":197,"correct":29},"检修时，应分别验算单相作业荷载1OOON和三相作业荷载1500N的受力状态。",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":210,"analysis":34},1024698,"选用出线构架宽度时，应使出线对构架横梁垂直线的偏角θ不大于下列数值（）。",[202,204,206,208],{"key":20,"text":203,"correct":29},"35kV为10°；",{"key":24,"text":205,"correct":22},"110kV为20°；",{"key":27,"text":207,"correct":22},"220kV和330kV为10°；",{"key":31,"text":209,"correct":29},"500kV为20°。","BC",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":98,"analysis":34},1024702,"屋外油浸变压器之间无防火墙时，其防火净距不得小于下列数值()。",[215,217,219,221],{"key":20,"text":216,"correct":22},"35kV为5m;",{"key":24,"text":218,"correct":22},"66kV为6m；",{"key":27,"text":220,"correct":29},"11OkV为10m;",{"key":31,"text":222,"correct":29},"220kV及以上为8m。",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":185,"analysis":34},1024707,"管型母线配电装置的设计应满足的要求有（）。",[227,229,231,233],{"key":20,"text":228,"correct":29},"管型母线应选用单管结构；",{"key":24,"text":230,"correct":29},"固定方式采用支持式或悬挂式，当地震动峰加速度为0.2g及以上时，应采用悬挂式；",{"key":27,"text":232,"correct":22},"对支持式管型母线在无冰无风时的挠度不宜大于（0.5~1.0)D(D为导体直径），对悬技式母线的挽度，在上述基础上可适当放宽；",{"key":31,"text":234,"correct":22},"采用管型母线时，还应分别采取接施，消除端部效应及微风振动。",{"id":236,"libraryId":5,"type":15,"typeLabel":16,"stem":237,"options":238,"answer":47,"analysis":34},1024710,"330~500kV超高压配电装置设计的特点及具体要求是（），",[239,241,243,245],{"key":20,"text":240,"correct":22},"按絶缘配合的要求，合理选择配电装里的絶缘水平和过电压保护设备；",{"key":24,"text":242,"correct":22},"合理选择配电装里型式，节约占地;",{"key":27,"text":244,"correct":22},"为达到大的栽流量，同时又要满足电晕及无线电干扰的要求，配电装置中导线及母线普遍选用扩径空芯导线、多分裂导线和管型导体；",{"key":31,"text":246,"correct":29},"设计用最大风速，可采用离地1Om高，30年一遇1Omin平均最大风速。",{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":47,"analysis":34},1024715,"污秽地区配电装置设计的要求及防污闪措施是()。",[251,253,255,257],{"key":20,"text":252,"correct":22},"尽量远离污染源；",{"key":24,"text":254,"correct":22},"合理选择配电装里型式，如屋内式配电装置或在重污秽地区采用气体绝缘金属封闭开关设备(GIS);",{"key":27,"text":256,"correct":22},"増大电瓷外绝缘的有效爬电距离或选用防污型产品；",{"key":31,"text":258,"correct":29},"加强运行维护，雷雨季节应定期停电清扫防止污闪。",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":98,"analysis":34},1024718,"下列论述中正确的是（ )。",[263,265,267,269],{"key":20,"text":264,"correct":22},"11OkV出线构架的高度一般为1Om,宽度为8m;",{"key":24,"text":266,"correct":22},"220kV隔离开关的搡动机构（三相联动时）宜布置在中相；",{"key":27,"text":268,"correct":29},"用于母线下的单柱隔离开关安装支架的高度不需要与母线高度配合；",{"key":31,"text":270,"correct":29},"取消旁路母线就是为了节约用地。",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":33,"analysis":34},1024721,"屋外配电装置 B、 C、D值校验时，下列公式中正确的是（ ）。",[275,277,279,281],{"key":20,"text":276,"correct":22},"B1=(A1+75)cm;",{"key":24,"text":278,"correct":22},"B2=(A1+7+3)cm;",{"key":27,"text":280,"correct":29},"C=(A1+230+50)cm；",{"key":31,"text":282,"correct":22},"D=(A1+180+20)cm。",{"id":284,"libraryId":5,"type":15,"typeLabel":16,"stem":285,"options":286,"answer":85,"analysis":34},1024726,"在主接线设计中,通常采用（）方法限制短路电流。",[287,289,291,293],{"key":20,"text":288,"correct":22},"分列运行；",{"key":24,"text":290,"correct":29},"切除个别回路",{"key":27,"text":292,"correct":22},"装设限流电抗器；",{"key":31,"text":294,"correct":29},"限制机组投入。",{"id":296,"libraryId":5,"type":15,"typeLabel":16,"stem":297,"options":298,"answer":123,"analysis":34},1024729,"下列情况可以不设隔离开关的是（）",[299,301,303,305],{"key":20,"text":300,"correct":29},"中、小型发电机出口；",{"key":24,"text":302,"correct":22},"200MW以上机组出口",{"key":27,"text":304,"correct":29},"馈电线出口",{"key":31,"text":306,"correct":22},"保护变压器的避雷器。",{"id":308,"libraryId":5,"type":15,"typeLabel":16,"stem":309,"options":310,"answer":210,"analysis":34},1024734,"电气主接线的经济性主要考虑的因素为（）。",[311,313,315,317],{"key":20,"text":312,"correct":29},"回收投资快；",{"key":24,"text":314,"correct":22},"总投资少；",{"key":27,"text":316,"correct":22},"占地面积小；",{"key":31,"text":318,"correct":29},"厂用电率低。",{"id":320,"libraryId":5,"type":15,"typeLabel":16,"stem":321,"options":322,"answer":210,"analysis":34},1024737,"电流互感器的配置取决于（ ）。",[323,325,327,329],{"key":20,"text":324,"correct":29},"并车要求；",{"key":24,"text":326,"correct":22},"保护要求；",{"key":27,"text":328,"correct":22},"測量要求；",{"key":31,"text":330,"correct":29},"防误操作要求",{"id":332,"libraryId":5,"type":15,"typeLabel":16,"stem":333,"options":334,"answer":210,"analysis":34},1024742,"以下接线方式中,无汇流排的接线方式为（）。 A.单母线分段； B.桥接线； C角形接线； D.双母线。",[335,336,337,338],{"key":20,"text":20,"correct":29},{"key":24,"text":24,"correct":22},{"key":27,"text":27,"correct":22},{"key":31,"text":31,"correct":29},{"id":340,"libraryId":5,"type":15,"typeLabel":16,"stem":341,"options":342,"answer":351,"analysis":34},1024745,"在限制35?110kV变电所中的6?10kV线路短路电流时可采取的措施为（ ）。",[343,345,347,349],{"key":20,"text":344,"correct":29},"在母线上装设电抗器；",{"key":24,"text":346,"correct":22},"变压器分裂运行；",{"key":27,"text":348,"correct":22},"采用高阻抗变压器；",{"key":31,"text":350,"correct":22},"在线路上装设电抗器。","BCD",{"id":353,"libraryId":5,"type":15,"typeLabel":16,"stem":354,"options":355,"answer":148,"analysis":34},1024748,"简易旁路跨条主要用于（）。 A.回路较少； B.场地限制； C节省投资； D.过渡接线。",[356,357,358,359],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":29},{"key":27,"text":27,"correct":29},{"key":31,"text":31,"correct":22},{"id":361,"libraryId":5,"type":15,"typeLabel":16,"stem":362,"options":363,"answer":47,"analysis":34},1024752,"电压互感器的数量配置应满足（ ）装置要求。",[364,366,368,370],{"key":20,"text":365,"correct":22},"测量仪表；",{"key":24,"text":367,"correct":22},"继电保护",{"key":27,"text":369,"correct":22},"自动；",{"key":31,"text":371,"correct":29},"信号显示。",{"id":373,"libraryId":5,"type":15,"typeLabel":16,"stem":374,"options":375,"answer":33,"analysis":34},1024755,"发电机中性点采用不接地方式时，应该（）。",[376,378,380,382],{"key":20,"text":377,"correct":22},"单相接地电流不超过允许值；",{"key":24,"text":379,"correct":22},"发电机中性点或直配线均设避雷器；",{"key":27,"text":381,"correct":29},"C适用于100MW以下机组；",{"key":31,"text":383,"correct":22},"适用于125MW以下机组。",{"id":385,"libraryId":5,"type":15,"typeLabel":16,"stem":386,"options":387,"answer":33,"analysis":34},1024758,"在主接线中分裂电抗器和分裂变压器是限制短路电流的常用方式，如（）。",[388,390,392,394],{"key":20,"text":389,"correct":22},"扩大单元接线；",{"key":24,"text":391,"correct":22},"大机组高压厂用变压器；",{"key":27,"text":393,"correct":29},"桥形接线；",{"key":31,"text":395,"correct":22},"在发电机或主变压器回路设置电抗器。",{"id":397,"libraryId":5,"type":15,"typeLabel":16,"stem":398,"options":399,"answer":148,"analysis":34},1024762,"110?500kV有效接地系统，在各种条件下应使零序与正序电抗之比X0\u002FX1为正值且不大于（），其零序电阻和正序电抗之比R0\u002FX1为正值且不大于（）。",[400,402,404,406],{"key":20,"text":401,"correct":22},"3；",{"key":24,"text":403,"correct":29},"2；",{"key":27,"text":405,"correct":29},"4;",{"key":31,"text":407,"correct":22},"1。",{"id":409,"libraryId":5,"type":15,"typeLabel":16,"stem":410,"options":411,"answer":33,"analysis":34},1024765,"发电机变压器线路组的接线一般用于（）。",[412,414,416,418],{"key":20,"text":413,"correct":22},"附近地区发电厂比较集中，可以汇集共建超高压变电所；",{"key":24,"text":415,"correct":22},"场地条件限制，建超高变电所比较困难；",{"key":27,"text":417,"correct":29},"发电机台数很少",{"key":31,"text":419,"correct":22},"附近有大型枢纽变电站。",{"id":421,"libraryId":5,"type":15,"typeLabel":16,"stem":422,"options":423,"answer":33,"analysis":34},1024768,"电气主接线的灵活性主要考虑（）。",[424,426,428,430],{"key":20,"text":425,"correct":22},"扩建灵活性；",{"key":24,"text":427,"correct":22},"调庋灵活性；",{"key":27,"text":429,"correct":29},"切换灵活性；",{"key":31,"text":431,"correct":22},"检修灵活性。",{"id":433,"libraryId":5,"type":15,"typeLabel":16,"stem":434,"options":435,"answer":33,"analysis":34},1024772,"设计主接线，凡装有断路器的回路均应配置电流互感器，在（）也应配置电流互感器。",[436,438,440,442],{"key":20,"text":437,"correct":22},"发电机出口侧和中性点侧；",{"key":24,"text":439,"correct":22},"变压器中性点侧及出口侧；",{"key":27,"text":441,"correct":29},"电抗器尾部；",{"key":31,"text":443,"correct":22},"桥接线跨条。",{"id":445,"libraryId":5,"type":15,"typeLabel":16,"stem":446,"options":447,"answer":98,"analysis":34},1024776,"与容量为600MW机组单元连接的主变压器型式的选用应综合考虑（ ）。",[448,450,452,454],{"key":20,"text":449,"correct":22},"运输条件；",{"key":24,"text":451,"correct":22},"制造条件；",{"key":27,"text":453,"correct":29},"环境条件；",{"key":31,"text":455,"correct":29},"安装条件。",{"id":457,"libraryId":5,"type":15,"typeLabel":16,"stem":458,"options":459,"answer":47,"analysis":34},1024779,"主接线设计应满足的基本要求是（）。",[460,461,462,464],{"key":20,"text":42,"correct":22},{"key":24,"text":44,"correct":22},{"key":27,"text":463,"correct":22},"经济性;",{"key":31,"text":465,"correct":29},"适用性。",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":85,"analysis":34},1024782,"当较小容量的发电厂或变电所只有两回变压器一线路单元接线相连，满足（）条 件时，可采用内桥接线。",[470,472,474,476],{"key":20,"text":471,"correct":22},"变压器不经常切换；",{"key":24,"text":473,"correct":29},"变压器经常切换",{"key":27,"text":475,"correct":22},"线路故障率较高；",{"key":31,"text":477,"correct":29},"线路有穿越功率",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":60,"analysis":34},1024786,"当较小容量的发电厂或变电所只有两回变压器一线路单元接线相连，满足（）条 件时，可采用外桥接线。",[482,484,485,487],{"key":20,"text":483,"correct":22},"变压器需经常切换；",{"key":24,"text":471,"correct":29},{"key":27,"text":486,"correct":22},"线路故障率较少；",{"key":31,"text":488,"correct":22},"线路有穿越功率。",{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":210,"analysis":34},1024790,"330?500kV配电装置采用的接线方式有（）。",[493,495,497,499],{"key":20,"text":494,"correct":29},"双母线带旁路接线；",{"key":24,"text":496,"correct":22},"双母线分段带旁路接线；",{"key":27,"text":498,"correct":22},"一台半断路器接线；",{"key":31,"text":500,"correct":29},"双母线分段接线。",{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":210,"analysis":34},1024793,"300MW及以上的发电机中性点可采用的接地方式有（ ）.",[505,507,509,511],{"key":20,"text":506,"correct":29},"不接地；",{"key":24,"text":508,"correct":22},"消弧线圈接地",{"key":27,"text":510,"correct":22},"高电阻接地；",{"key":31,"text":512,"correct":29},"避雷器接地。",{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":47,"analysis":34},1024798,"一台半短路器接线初期仅有两串时，应满足（）",[517,519,521,523],{"key":20,"text":518,"correct":22},"同名回路配置在不同串内；",{"key":24,"text":520,"correct":22},"同名回路配里接在不同侧母线；",{"key":27,"text":522,"correct":22},"进出线侧应装设隔离开关；",{"key":31,"text":524,"correct":29},"进线侧应装设隔离开关",{"id":526,"libraryId":5,"type":15,"typeLabel":16,"stem":527,"options":528,"answer":33,"analysis":34},1024801,"当500kV系统采用一台半断路器接线时，（ ）需设置电压互感器。",[529,531,533,535],{"key":20,"text":530,"correct":22},"每回出线；",{"key":24,"text":532,"correct":22},"主变压器进线；",{"key":27,"text":534,"correct":29},"串内连接线；",{"key":31,"text":536,"correct":22},"每组母线",{"id":538,"libraryId":5,"type":15,"typeLabel":16,"stem":539,"options":540,"answer":351,"analysis":34},1024806,"需设置电流互感器的地点是（）",[541,543,545,547],{"key":20,"text":542,"correct":29},"电压互感器回路；",{"key":24,"text":544,"correct":22},"发电机和变压器中性点及发电机出口；",{"key":27,"text":546,"correct":22},"断路器回路；",{"key":31,"text":548,"correct":22},"桥形接线的跨条。",{"id":550,"libraryId":5,"type":15,"typeLabel":16,"stem":551,"options":552,"answer":60,"analysis":34},1024809,"35kV及以下屋内配电装置当未采用金属封闭开关设备时，其（）应设置在两侧 有燃烧实体墙的间隔内。",[553,555,557,559],{"key":20,"text":554,"correct":22},"油断路器；",{"key":24,"text":556,"correct":29},"控制屏；",{"key":27,"text":558,"correct":22},"油浸电流互感器；",{"key":31,"text":560,"correct":22},"电压互感器。",{"id":562,"libraryId":5,"type":15,"typeLabel":16,"stem":563,"options":564,"answer":60,"analysis":34},1024812,"对主厂房内易受外部火灾影响的（）、排法孔朝向的邻近部位的电缆区域，应采 取防火措施。",[565,567,569,571],{"key":20,"text":566,"correct":22},"汽轮机头部；",{"key":24,"text":568,"correct":29},"煤斗；",{"key":27,"text":570,"correct":22},"汽轮机油系统；",{"key":31,"text":572,"correct":22},"锅炉防爆门。",{"id":574,"libraryId":5,"type":15,"typeLabel":16,"stem":575,"options":576,"answer":210,"analysis":34},1024817,"单机容量为200MW及以上的燃煤电厂的（〉及柴油发电机房的应急照明，应采 用蓄电池直流系统供电。",[577,579,581,583],{"key":20,"text":578,"correct":29},"主厂房；",{"key":24,"text":580,"correct":22},"单元控制室；",{"key":27,"text":582,"correct":22},"网络控制室；",{"key":31,"text":584,"correct":29},"办公楼。",{"id":586,"libraryId":5,"type":15,"typeLabel":16,"stem":587,"options":588,"answer":47,"analysis":34},1024820,"单机容量为200MW以上的燃煤电厂的（）及远离主厂房的重要工作场所的应急 照明，宜采用日常电源的应急灯。 A.主厂房出入口； B.通道； C楼梯； D.隧道。",[589,590,591,592],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":22},{"key":27,"text":27,"correct":22},{"key":31,"text":31,"correct":29},{"id":594,"libraryId":5,"type":15,"typeLabel":16,"stem":595,"options":596,"answer":148,"analysis":34},1024823,"220kV及以上的变电站，当电力电缆与控制电缆或通信电缆敷设在同一电缆沟或电 缆隧道内时，宜采用（）进行分隔。 A.防火槽盒； B.阻火包 C阻燃剂 D.防火隔板",[597,598,599,600],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":29},{"key":27,"text":27,"correct":29},{"key":31,"text":31,"correct":22},{"id":602,"libraryId":5,"type":15,"typeLabel":16,"stem":603,"options":604,"answer":47,"analysis":34},1024828,"放射线作用场所的电缆，应具有适用耐受放射线辑照强度的（）等防护外套。",[605,607,609,611],{"key":20,"text":606,"correct":22},"聚氯乙烯；",{"key":24,"text":608,"correct":22},"氯丁橡皮；",{"key":27,"text":610,"correct":22},"氯横化聚乙烯；",{"key":31,"text":612,"correct":29},"交联聚乙烯。",[614,618,621,624,627,630],{"id":615,"name":616,"category":7,"favorite":617},1,"领导干部任职前廉政法规知识测试题",92,{"id":619,"name":620,"category":7,"favorite":615},595,"建筑结构与设备",{"id":622,"name":623,"category":7,"favorite":615},715,"招标采购专业知识与法律法规",{"id":625,"name":626,"category":7,"favorite":615},848,"市政方向-通用基础",{"id":628,"name":629,"category":7,"favorite":8},534,"BIM工程师",{"id":631,"name":629,"category":7,"favorite":8},535]