[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-751-47":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":629},{"id":5,"name":6,"category":7,"favorite":8},751,"电气工程师发输变电专业","建筑工程",0,47,50,2670,[13,35,48,61,74,86,98,110,122,135,148,160,172,184,197,209,221,233,245,257,269,281,293,305,317,329,341,353,365,377,390,402,414,426,437,449,460,473,485,497,509,521,533,545,557,569,581,593,605,617],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":33,"analysis":34},1024063,2,"多选题","电动机宜測量交流电流的回路有（）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","高压电动机；",true,{"key":24,"text":25,"correct":26},"B","II类低压电动机；",false,{"key":28,"text":29,"correct":22},"C","55kW以下易过负荷低压电动机；",{"key":31,"text":32,"correct":22},"D","55kW以上低压电动机。","ACD","",{"id":36,"libraryId":5,"type":15,"typeLabel":16,"stem":37,"options":38,"answer":47,"analysis":34},1024064,"发电厂控制室的控制方式有()。",[39,41,43,45],{"key":20,"text":40,"correct":26},"单机容量为10OMW的发电厂应采用主控制室控制方式；",{"key":24,"text":42,"correct":22},"单机容量为125MW的发电厂宜采用单元控制室控制方式；",{"key":28,"text":44,"correct":22},"单机容量为200MW及以上的发电厂应采用单元控制室控制方式；",{"key":31,"text":46,"correct":22},"单机容量为100MW及以下的发电厂宜采用主控制室控制方式，","BCD",{"id":49,"libraryId":5,"type":15,"typeLabel":16,"stem":50,"options":51,"answer":60,"analysis":34},1024065,"安全电压是(),",[52,54,56,58],{"key":20,"text":53,"correct":22},"AC6V；",{"key":24,"text":55,"correct":22},"AC12V；",{"key":28,"text":57,"correct":22},"AC24V；",{"key":31,"text":59,"correct":26},"AC48V。","ABC",{"id":62,"libraryId":5,"type":15,"typeLabel":16,"stem":63,"options":64,"answer":73,"analysis":34},1024066,"控制室的布置应与（）专业配合。",[65,67,69,71],{"key":20,"text":66,"correct":22},"总平面布置；",{"key":24,"text":68,"correct":22},"建筑；",{"key":28,"text":70,"correct":26},"供水；",{"key":31,"text":72,"correct":22},"暖通。","ABD",{"id":75,"libraryId":5,"type":15,"typeLabel":16,"stem":76,"options":77,"answer":73,"analysis":34},1024067,"应在主控制室控制的设备有（）。",[78,80,82,84],{"key":20,"text":79,"correct":22},"发电机，发电机交压器组，主变压器，联络变压器，母线分段、母线联络、旁路断路器；",{"key":24,"text":81,"correct":22},"35kV及以上线路，高压厂用电源线，厂用工作及备用变压器（电抗器）；",{"key":28,"text":83,"correct":26},"辅助厂房变压器，UPS电源线，直流馈线；",{"key":31,"text":85,"correct":22},"备用励磁装里及全厂共用的消防水泵。",{"id":87,"libraryId":5,"type":15,"typeLabel":16,"stem":88,"options":89,"answer":73,"analysis":34},1024068,"断路器控制回路接线，应满足的要求是()。",[90,92,94,96],{"key":20,"text":91,"correct":22},"应有电源监视，并宜监视、合闸绕组回路的完整性，应能指示断路器合闸、跳闸的位里状态；自动重合闸或跳闸时应有明显信号；",{"key":24,"text":93,"correct":22},"合闸或跳闸完成后应使命令脉冲自动解除，有防止断路器“跳跃”的自动闭锁装置；",{"key":28,"text":95,"correct":26},"有反映断路器故障跳闸时的故障信号；",{"key":31,"text":97,"correct":22},"接线应简单可靠，使用电缆芯表少。",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":47,"analysis":34},1024069,"强电控制一般分为（）。",[102,104,106,108],{"key":20,"text":103,"correct":26},"根据控制地点分为远方和就地控制两种；",{"key":24,"text":105,"correct":22},"根据控制地点分为集中控制和就地控制两种；",{"key":28,"text":107,"correct":22},"按跳、合闸回路监视方式分为灯光监视和音响监视两种；",{"key":31,"text":109,"correct":22},"按控制回路接线分为控制开关具有固定位里的不对应接线与控制开关.自动复位的接线。",{"id":111,"libraryId":5,"type":15,"typeLabel":16,"stem":112,"options":113,"answer":33,"analysis":34},1024070,"采用定型标准2200mm高的屏（屏台）时，下列屏面设备布置尺寸正确的是（）。",[114,116,118,120],{"key":20,"text":115,"correct":22},"仪表的水平中心线宜距地面1200~2000mm；",{"key":24,"text":117,"correct":26},"电能表的水平中心线宜距地面1500~2100mm；",{"key":28,"text":119,"correct":22},"操作、切换开关按布置在水乎中心线距地面高度800~1600mm之间；",{"key":31,"text":121,"correct":22},"光字牌布置的水平中心线距地面高度应在1400~1700mm之间。",{"id":123,"libraryId":5,"type":15,"typeLabel":16,"stem":124,"options":125,"answer":134,"analysis":34},1024071,"关于屏面布置的要求，正确的说法是（）。",[126,128,130,132],{"key":20,"text":127,"correct":22},"同类安装单位的屏面布置应一致，当不同安装单位的设备安装在同一块屏（台）上时，宜按纵向划分；",{"key":24,"text":129,"correct":26},"同类安装单位的屏面布里宜一致，二个不同安装单位设备应按纵向划分；",{"key":28,"text":131,"correct":26},"同一块展面上的设备纵向，横向安装单位设备位置应一致，并考虑运行、维护、检修方便；",{"key":31,"text":133,"correct":22},"各屏上设备的横向装设高度应整齐一致，屏内设备不宜前后双层布置，当需要双层布里时，必须考虑到运行、维修的方便。","AD",{"id":136,"libraryId":5,"type":15,"typeLabel":16,"stem":137,"options":138,"answer":147,"analysis":34},1024072,"发电厂采用强电一对一控制接线，控制直流电压可选用（）。",[139,141,143,145],{"key":20,"text":140,"correct":22},"DC 220V；",{"key":24,"text":142,"correct":22},"DC 110V；",{"key":28,"text":144,"correct":26},"DC 48V,",{"key":31,"text":146,"correct":26},"DC24V。","AB",{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":60,"analysis":34},1024073,"主控制室设中央信号装置，中央信号装置应具备的功能要求是（）。",[152,154,156,158],{"key":20,"text":153,"correct":22},"断路器事故跳闸时，能瞬时发出响信号及相应的灯光信专，发生故障时，能瞬时发出顸告信号，并以光字牌显示故障性质；",{"key":24,"text":155,"correct":22},"能进行事故和预告信号及光字牌完好性的试猃，能手动和自动复归音响，而保留光字牌信号，试检遥信事故信号时，不应发出遥信信号，事故音响动作时，应停事故电钟，但在亊故音响信号试验时，不应停钟；",{"key":28,"text":157,"correct":22},"断路器亊故跳闸时，能瞬时发出音响信号及相应的光字牌发出闪光信号；",{"key":31,"text":159,"correct":26},"对音响监视接线能实现亮屏或暗再运行。",{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":60,"analysis":34},1024074,"主控制室屏（台）上应装设的信号有（）。",[164,166,168,170],{"key":20,"text":165,"correct":22},"断路器位置信号，故障信号、设备发生亊故或异常运行时，一对一的光字牌信号；",{"key":24,"text":167,"correct":22},"保护动作信号、直流系统事故领告信号；",{"key":28,"text":169,"correct":22},"发电机控制屏（台）上，宜装有与汽机控制屏之间相互联系的指挥信号；",{"key":31,"text":171,"correct":26},"就地控制隔离开关接地的总信号。",{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":47,"analysis":34},1024075,"液压操动的断路器控制回路，防止断路器慢分的方法有（）。",[176,178,180,182],{"key":20,"text":177,"correct":26},"自动闭锁装里；",{"key":24,"text":179,"correct":22},"机械闭锁方法；",{"key":28,"text":181,"correct":22},"机械自动闭锁装置；",{"key":31,"text":183,"correct":22},"电气闭锁装置。",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":196,"analysis":34},1024076,"中央信号装置可分为（）。",[188,190,192,194],{"key":20,"text":189,"correct":26},"中央信号能重复动作；",{"key":24,"text":191,"correct":22},"中央信号复归不重复动作；",{"key":28,"text":193,"correct":22},"中央信号复归能重复动作；",{"key":31,"text":195,"correct":26},"中央信号不重复动作。","BC",{"id":198,"libraryId":5,"type":15,"typeLabel":16,"stem":199,"options":200,"answer":60,"analysis":34},1024077,"属于多功能电能表功能的是（）。",[201,203,205,207],{"key":20,"text":202,"correct":22},"计量有功（无功）电能；",{"key":24,"text":204,"correct":22},"具有分时、分方向需量；",{"key":28,"text":206,"correct":22},"显示、储存和输出；",{"key":31,"text":208,"correct":26},"显示、全天、全月总功量。",{"id":210,"libraryId":5,"type":15,"typeLabel":16,"stem":211,"options":212,"answer":33,"analysis":34},1024078,"下列关于常用測量仪表精确等级的描述，正确的是（）。",[213,215,217,219],{"key":20,"text":214,"correct":22},"除谁波量仪表外，交流回路仪表的精确度等级不应大于2.5级；",{"key":24,"text":216,"correct":26},"电能測量仪表的精确度等级不应低于2级；",{"key":28,"text":218,"correct":22},"直流回路仪表的精碗度等级不应大于1.5级；",{"key":31,"text":220,"correct":22},"电量送变器输出仪表的精端度不应大于1级。",{"id":222,"libraryId":5,"type":15,"typeLabel":16,"stem":223,"options":224,"answer":33,"analysis":34},1024079,"水电厂应在中央控制室远方集中监控的对象有()。",[225,227,229,231],{"key":20,"text":226,"correct":22},"发电机组、主变压器；",{"key":24,"text":228,"correct":26},"10~500kV线路及母线设备、并联电抗器；",{"key":28,"text":230,"correct":22},"6kV及以上的厂用变压器及其母线、分段断路器；",{"key":31,"text":232,"correct":22},"厂用备用电源系统。",{"id":234,"libraryId":5,"type":15,"typeLabel":16,"stem":235,"options":236,"answer":60,"analysis":34},1024080,"水电厂模拟屏的屏面与常规控制台台面布置，描述正确的是（），",[237,239,241,243],{"key":20,"text":238,"correct":22},"控制台与模拟屏上的模拟母线应一致；",{"key":24,"text":240,"correct":22},"同类安装单位功能相同的测量仪表及操作设备应布置在相对应的位置上；",{"key":28,"text":242,"correct":22},"測量仪表及操作设备应与其安装单位的模拟接线相对应；",{"key":31,"text":244,"correct":26},"组合式同步表宜布置在模拟屏上。",{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":47,"analysis":34},1024081,"电流互感器的选择应船的要求是（）。",[249,251,253,255],{"key":20,"text":250,"correct":26},"电流互感器应满足接在二次回路中最大负载要求；",{"key":24,"text":252,"correct":22},"应满足一次回路的额定电压、最大负荷电流及短路时的动、热稳定电流的要求；",{"key":28,"text":254,"correct":22},"应满足二次回路測量仪表，继电保护和自动装置的要求；",{"key":31,"text":256,"correct":22},"500kV保护用电流互感器的暂态特性应满足继电保护的要求。",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":33,"analysis":34},1024082,"符合控制开关选择要求的有（）。",[261,263,265,267],{"key":20,"text":262,"correct":22},"二次田硌額定电压、额定电流；",{"key":24,"text":264,"correct":26},"所操作设备的容量、所需断开回路的断流量；",{"key":28,"text":266,"correct":22},"分断电流、操作頻繁率；",{"key":31,"text":268,"correct":22},"电寿命和控制接线。",{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":33,"analysis":34},1024083,"火电厂电压互感器二次侧熔断器的选择应遵循的原则有（）。",[273,275,277,279],{"key":20,"text":274,"correct":22},"熔断器额定电流应按回路的最大负荷电流选释，并满足选择性的要求；",{"key":24,"text":276,"correct":26},"熔断器应按其最大负荷电流选择，但不应考虑双母线两组电压互感器切换时的工况；",{"key":28,"text":278,"correct":22},"熔断器的猿件必须保证在二次电压田路内发生短路时，懷件熔断的时间小于闭锁保护装置的动作时间；",{"key":31,"text":280,"correct":22},"聚件的額定电流应大于最大负荷电流（在双母线接线中，应考虑一组母线运行时，所有电压面路的负荷全部切换至另一组电压互感器上），可靠系数取1.5。",{"id":282,"libraryId":5,"type":15,"typeLabel":16,"stem":283,"options":284,"answer":73,"analysis":34},1024084,"对水电厂的屏面布置描述正确的是（）。",[285,287,289,291],{"key":20,"text":286,"correct":22},"同类安装单位的屏面布置应一致，当不同安装单位安装在同一块屏时，宜按纵向划分；",{"key":24,"text":288,"correct":22},"各屏上设备横向装设高度应一致；",{"key":28,"text":290,"correct":26},"屏内设备可前后双层布置；",{"key":31,"text":292,"correct":22},"当需要采用取层布里时，必须考虑到运行检修的方便。",{"id":294,"libraryId":5,"type":15,"typeLabel":16,"stem":295,"options":296,"answer":196,"analysis":34},1024085,"单机容量为（）的发电厂，宜采用单元控制室的控制方式。",[297,299,301,303],{"key":20,"text":298,"correct":26},"10OMW及以下机組；",{"key":24,"text":300,"correct":22},"125MW机组；",{"key":28,"text":302,"correct":22},"200MW及以上；",{"key":31,"text":304,"correct":26},"300MW及以下。",{"id":306,"libraryId":5,"type":15,"typeLabel":16,"stem":307,"options":308,"answer":73,"analysis":34},1024086,"应在单元控制室控制的设备和元件有（）。",[309,311,313,315],{"key":20,"text":310,"correct":22},"发电机、发电机变压器组、高压厂用工作变压器、高压厂用公用（2台机组公用负荷）\u002F备用或启动\u002F备用变压器；",{"key":24,"text":312,"correct":22},"高压厂用电源线；",{"key":28,"text":314,"correct":26},"交流亊故保安电源；",{"key":31,"text":316,"correct":22},"主厂房内采用专用备用电源、互为备用的低压厂用变压器，以及该单元其他有必要集中控制的设备或元件。",{"id":318,"libraryId":5,"type":15,"typeLabel":16,"stem":319,"options":320,"answer":196,"analysis":34},1024087,"直流主屏的布置地点宜为（ ）。",[321,323,325,327],{"key":20,"text":322,"correct":26},"蓄电池室；",{"key":24,"text":324,"correct":22},"蓄电池室附近单独的电源室内或电气继电器室；",{"key":28,"text":326,"correct":22},"对于网络直流系统，也可布置在网络继电器室；",{"key":31,"text":328,"correct":26},"负荷中心处。",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":60,"analysis":34},1024088,"在水电厂中央控制室远方集中监控的对象有（）。",[333,335,337,339],{"key":20,"text":334,"correct":22},"水轮发电机组、主变压器；",{"key":24,"text":336,"correct":22},"35~500kV线路及母线设备、并联电抗器；",{"key":28,"text":338,"correct":22},"6kV及以上的厂用变压器及其母线、分段断路器和外来厂用备用电源系统，全厂水位等；",{"key":31,"text":340,"correct":26},"低庄380V厂用电气系统。",{"id":342,"libraryId":5,"type":15,"typeLabel":16,"stem":343,"options":344,"answer":33,"analysis":34},1024089,"下列的控制室屏间最小距离和通道宽度最小距离正确的是（）。",[345,347,349,351],{"key":20,"text":346,"correct":22},"屏正面至墙最小为1200mm；",{"key":24,"text":348,"correct":26},"主要通道最小为2000mm；",{"key":28,"text":350,"correct":22},"屏背面至屏背面最小为800mm(除直流屏，事故照明屏等动力屏外）；",{"key":31,"text":352,"correct":22},"屏正面至屏正面最小为1400mm。",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":47,"analysis":34},1024090,"主控制室和网络控制室屏的布置符合规定要求的是（）。",[357,359,361,363],{"key":20,"text":358,"correct":26},"控制屏与继电器屏必须分室布置；",{"key":24,"text":360,"correct":22},"主控制室主环正面屏总长度超过6m时，宜采用孤布置里；",{"key":28,"text":362,"correct":22},"主环正面屏的排列次序，宜与主厂房机组的安装位置相对应；",{"key":31,"text":364,"correct":22},"电能表展及记录仪表屏应布里在抄表方便的地方。",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":47,"analysis":34},1024091,"正确的单元控制室布置方方法是。",[369,371,373,375],{"key":20,"text":370,"correct":26},"在常规控制方式下，同一单元控制室中两台机组的主控制屏屏面布置，宜按照机炉电、机炉电的順序布里；",{"key":24,"text":372,"correct":22},"当网络部分控制展放在第一单元控制室时，网络部分宜布置在两机组控制屏的中间，也可布置在一侧；",{"key":28,"text":374,"correct":22},"电气控制屏（屏台）、控制设备、测量权束和信号装直等的选型及台面（屏面）的布置应与热控专业相协调；",{"key":31,"text":376,"correct":22},"电气部分的保护屏、自动装置屏、计算机监控设备等，宜布置在靠近单元控制室的继电器室，也可布置在电子设备间。",{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":389,"analysis":34},1024092,"断路器控制回路应满足一些基本条件，伹下列条件中错误的或不完整的是（）。",[381,383,385,387],{"key":20,"text":382,"correct":22},"应有电源监视，并宜监视合闸回路的完整性；",{"key":24,"text":384,"correct":26},"应能指示断路器合闸与跳闸的位里状态，自动合闸或跳闲时应有明显信号；",{"key":28,"text":386,"correct":22},"合闸或跳闸完成后，应使命令脉冲手动解除；",{"key":31,"text":388,"correct":26},"有防止断路器“跳跃”的电气闭锁装置。","AC",{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":47,"analysis":34},1024093,"交流电流回路的设计有一些基本要求，下列正确的说法是（）。",[394,396,398,400],{"key":20,"text":395,"correct":26},"在某些特殊情况下，保护装置和测量仪表必须共用一组电流互感器的同一个二次线圈上，此时测量仪表应接在保护装里之前；",{"key":24,"text":397,"correct":22},"对中性点直接接地系统，可按三相配置电流互感器，对中性点非直接接地系统，依具体要求可按两相或三相配罝；",{"key":28,"text":399,"correct":22},"电流互感器的二次回路不宜进行切换；",{"key":31,"text":401,"correct":22},"110kV及以上的电流互感器的额定二次电流宜选1A。",{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":60,"analysis":34},1024094,"应測量三相电流的回路是（）。",[406,408,410,412],{"key":20,"text":407,"correct":22},"汽轮发电机的定子回路；",{"key":24,"text":409,"correct":22},"220~500kV输电线路和变压器220kV及以上电源侧回路；",{"key":28,"text":411,"correct":22},"330~500kV并联电抗器组和变压器低压侧装有无功补偿装置的回路；",{"key":31,"text":413,"correct":26},"55kW及以上电动机。",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":33,"analysis":34},1024095,"应监测交流系统绝缘的回路是（）。",[418,420,422,424],{"key":20,"text":419,"correct":22},"同步发电机的定子回路；",{"key":24,"text":421,"correct":26},"110kV中性点接地系统母线；",{"key":28,"text":423,"correct":22},"35kV中性点不接地系统母线；",{"key":31,"text":425,"correct":22},"10kV中性点不接地系统母线。",{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":33,"analysis":34},1024096,"应测量有功功率的回路有（ ）。",[430,431,433,435],{"key":20,"text":419,"correct":22},{"key":24,"text":432,"correct":26},"母联或分段断路器,",{"key":28,"text":434,"correct":22},"主变压器、双绕组变压器的一侧或三绕组变压器的三侧；",{"key":31,"text":436,"correct":22},"10kV输配电线路。",{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":196,"analysis":34},1024097,"应按照I类计量装置设计的计费用户是（）。",[441,443,445,447],{"key":20,"text":442,"correct":26},"月平均用电量4000MWh的计费用户；",{"key":24,"text":444,"correct":22},"300MW的发电机组；",{"key":28,"text":446,"correct":22},"变压器容量为15MVA的高压计费用户；",{"key":31,"text":448,"correct":26},"125MW的发电机組.",{"id":450,"libraryId":5,"type":15,"typeLabel":16,"stem":451,"options":452,"answer":389,"analysis":34},1024098,"宜计量有功电能的回路是（)。",[453,455,457,458],{"key":20,"text":454,"correct":22},"厂用电变压器髙压側；",{"key":24,"text":456,"correct":26},"厂用380V线路；",{"key":28,"text":21,"correct":22},{"key":31,"text":459,"correct":26},"低压电动机。",{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":472,"analysis":34},1024099,"应计量无功电能的回路有（）。",[464,466,468,470],{"key":20,"text":465,"correct":26},"厂用电变压器高压侧；",{"key":24,"text":467,"correct":26},"厂用6kV线路；",{"key":28,"text":469,"correct":22},"110kV线路；",{"key":31,"text":471,"correct":22},"500kV并联电抗器。","CD",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":33,"analysis":34},1024100,"正确的变电所机监控系统防雷与接地措施是（）。",[477,479,481,483],{"key":20,"text":478,"correct":22},"计算机监控系统应有防止过电压的保护措施；",{"key":24,"text":480,"correct":26},"计算机监控系统应设置独立的接地网；",{"key":28,"text":482,"correct":22},"环形接地网的设置：在放置站控层设备的控制室、机房和放里间隔层设备的继电小室内，应围绕机房教设环形接地母线",{"key":31,"text":484,"correct":22},"二次设备可靠接地。",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":73,"analysis":34},1024101,"正确的断路器控制回路设计是（）。",[489,491,493,495],{"key":20,"text":490,"correct":22},"应有电源监视，并宜监视跳合闸线围面路的完整性；",{"key":24,"text":492,"correct":22},"应能指示断路器合闸与跳闸的位置状态，自动合闸或跳闸时应有明显信号；",{"key":28,"text":494,"correct":26},"合闸或跳闸后应使命令脉冲保持；",{"key":31,"text":496,"correct":22},"有防止断路器“跳跃”的电气闭锁措施。",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":147,"analysis":34},1024102,"220~500kV电气设备中宜远方操作的设备有（）。",[501,503,505,507],{"key":20,"text":502,"correct":22},"断路器；",{"key":24,"text":504,"correct":22},"例闸橾作用的隔离开关；",{"key":28,"text":506,"correct":26},"检修用隔离开关；",{"key":31,"text":508,"correct":26},"母线接地器。",{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":73,"analysis":34},1024103,"正确的计算机监控系统用电缆方案是（）。",[513,515,517,519],{"key":20,"text":514,"correct":22},"模拟量及脉冲量弱电信号榆入回路电缆应选用对绞芯分屏蔽电缆，芯线截面不小于0.75mm2；",{"key":24,"text":516,"correct":22},"开关量信号榆入输出回路电缆可选用外部总屏蔽电缆，输入回路芯线截面不小于1.Omm2,输出回路芯线截面不小于1,5mm2；",{"key":28,"text":518,"correct":26},"必要时开关量信号输入输出回路电缆也可选用对绞芯分脣蔽加外部总屏蔽电缆；",{"key":31,"text":520,"correct":22},"变电所计算机监控系统的户外通信介质应选用光缆，",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":389,"analysis":34},1024104,"正确的35~110kV无人值班变电所的远动终端、微机监控终端的技术要求是（）。",[525,527,529,531],{"key":20,"text":526,"correct":22},"应满足信息采集、处理、发送和命令接收、输出和执行的要求；",{"key":24,"text":528,"correct":26},"电气模拟量的采集宜直流采样；",{"key":28,"text":530,"correct":22},"所内不设里固定的运行值班员工作站；",{"key":31,"text":532,"correct":26},"变电所的同一被控设备在同一时间允许由多个远方控制端对其实施遥控。",{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":472,"analysis":34},1024105,"35~110kV无人值班变电所电气二次设备室正确的布S方法是（）。",[537,539,541,543],{"key":20,"text":538,"correct":26},"电气二次设备室的位里选择主要取决于运行管理是否方便；",{"key":24,"text":540,"correct":26},"电气二次设备室的展位数量主要考虑本期建设需要，适当考虑部分预留屏位，远期屏位不在本期建设规划范围之内；",{"key":28,"text":542,"correct":22},"电气二次设备室设施应简化、布里应紧凑；",{"key":31,"text":544,"correct":22},"电气二次设备室不适宜作为长期有人值班的监控场所，但其面积应满足设备布置和定期巡視维护的要求。",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":196,"analysis":34},1024106,"正确的有功、无功电能表接线形式是（）。",[549,551,553,555],{"key":20,"text":550,"correct":26},"中性点有效接地系统的电能表采用三相三线；",{"key":24,"text":552,"correct":22},"中性点有效接地系统的电能表应采用三相四线；",{"key":28,"text":554,"correct":22},"中性点非有效接地系铳的电能表应采用三相三线；",{"key":31,"text":556,"correct":26},"中性点非有效接地系统的电能表采用三相四线，",{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":147,"analysis":34},1024107,"计算机监控系统的控制室和计算机室地面宜采用()方式。",[561,563,565,567],{"key":20,"text":562,"correct":22},"水磨石地面；",{"key":24,"text":564,"correct":22},"抗静电阻燃材料活动地板；",{"key":28,"text":566,"correct":26},"普通木地板；",{"key":31,"text":568,"correct":26},"大理石地面。",{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":147,"analysis":34},1024108,"对手动操作的隔离开关和接地开关，操作闭锁的方式应选择（）。",[573,575,577,579],{"key":20,"text":574,"correct":22},"编码锁，并宜在就地控制箱设电气闭锁；",{"key":24,"text":576,"correct":22},"电磁锁，并宜在就地控制箱设电气闭锁；",{"key":28,"text":578,"correct":26},"就地电气闭锁；",{"key":31,"text":580,"correct":26},"不需单独的闭锁措施，",{"id":582,"libraryId":5,"type":15,"typeLabel":16,"stem":583,"options":584,"answer":60,"analysis":34},1024109,"发电厂采用计算机监控系统后，操作员站台宜保留的常规仪表有()。",[585,587,589,591],{"key":20,"text":586,"correct":22},"发电机定子U AC线电压；",{"key":24,"text":588,"correct":22},"发电机定子IB相电流；",{"key":28,"text":590,"correct":22},"发电机励磁电流；",{"key":31,"text":592,"correct":26},"高压工作变高压例IB相电流。",{"id":594,"libraryId":5,"type":15,"typeLabel":16,"stem":595,"options":596,"answer":33,"analysis":34},1024110,"如图12-1,12~25MW、Y接线发电机保护的配置应为（）.",[597,599,601,603],{"key":20,"text":598,"correct":22},"纵联差动,",{"key":24,"text":600,"correct":26},"横联差动；",{"key":28,"text":602,"correct":22},"定子绕组一点接地；",{"key":31,"text":604,"correct":22},"复合电压启动过流。",{"id":606,"libraryId":5,"type":15,"typeLabel":16,"stem":607,"options":608,"answer":472,"analysis":34},1024111,"下列电流互感器中可用于继电保护装置的是（）。",[609,611,613,615],{"key":20,"text":610,"correct":26},"0.2级；",{"key":24,"text":612,"correct":26},"0.5级；",{"key":28,"text":614,"correct":22},"P级；",{"key":31,"text":616,"correct":22},"TP级。",{"id":618,"libraryId":5,"type":15,"typeLabel":16,"stem":619,"options":620,"answer":196,"analysis":34},1024112,"500kV线路发生两相不接地短路时出现的故瘅电流分量为（）。",[621,623,625,627],{"key":20,"text":622,"correct":26},"零序分量；",{"key":24,"text":624,"correct":22},"正序分量；",{"key":28,"text":626,"correct":22},"负序分量；",{"key":31,"text":628,"correct":26},"低频分量，",[630,634,637,640,643,646],{"id":631,"name":632,"category":7,"favorite":633},1,"领导干部任职前廉政法规知识测试题",92,{"id":635,"name":636,"category":7,"favorite":631},595,"建筑结构与设备",{"id":638,"name":639,"category":7,"favorite":631},715,"招标采购专业知识与法律法规",{"id":641,"name":642,"category":7,"favorite":631},848,"市政方向-通用基础",{"id":644,"name":645,"category":7,"favorite":8},534,"BIM工程师",{"id":647,"name":645,"category":7,"favorite":8},535]