[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-751-41":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":580},{"id":5,"name":6,"category":7,"favorite":8},751,"电气工程师发输变电专业","建筑工程",0,41,50,2670,[13,34,46,58,66,78,86,98,105,117,129,141,153,165,177,189,201,213,225,237,249,261,270,282,294,306,318,330,342,354,366,378,388,400,412,424,436,448,460,472,484,492,500,512,524,532,544,556,564,572],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1023763,1,"单选题","某35~110kV变电所若35kV出线8回，110kV出线为4回。 若此变电所3台主变压器35kV中性点要求经消弧线圈接地，其装设为（）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","装设3个消弧线圈；",false,{"key":24,"text":25,"correct":22},"B","装设2个消弧线圈；",{"key":27,"text":28,"correct":29},"C","装设1个消弧线圈；",true,{"key":31,"text":32,"correct":22},"D","在邻近变电所装设。","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},1023764,"某35~110kV变电所若35kV出线8回，110kV出线为4回。 若此变压器35kV中性点未能引出，消弧线圏应该（）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"在邻近变电所装设；",{"key":24,"text":41,"correct":22},"在低一级电压上装设；",{"key":27,"text":43,"correct":22},"在高压侧装设；",{"key":31,"text":45,"correct":29},"应装设一台专用接地变压器。",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},1023765,"某发电厂计划安装4台300MW机组，分期建设，发电机功率送入220kV系统， 220kV线路最终14回，采用少油断路器。 根据规程其主接线采用（）方式。",[50,52,54,56],{"key":20,"text":51,"correct":22},"单母线分段带旁路；",{"key":24,"text":53,"correct":22},"双母线带旁路；",{"key":27,"text":55,"correct":29},"双母线单分段带旁路；",{"key":31,"text":57,"correct":22},"单母线带旁路",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1023766,"某发电厂计划安装4台300MW机组，分期建设，发电机功率送入220kV系统， 220kV线路最终14回，采用少油断此厂应设（）台路器。 此厂应设（）台启动变压器。A. 1 台； B. 2 台;",[62,63,64,65],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":29},{"key":27,"text":27,"correct":22},{"key":31,"text":31,"correct":22},{"id":67,"libraryId":5,"type":15,"typeLabel":16,"stem":68,"options":69,"answer":24,"analysis":33},1023767,"某发电厂计划安装4台300MW机组，分期建设，发电机功率送入220kV系统， 220kV线路最终14回，采用少油断路器。 发电机升压变压器接人系统的方式为（）。",[70,72,74,76],{"key":20,"text":71,"correct":22},"发电机三绕组变压器组；",{"key":24,"text":73,"correct":29},"发电机双绕组变压器组；",{"key":27,"text":75,"correct":22},"扩大单元组;",{"key":31,"text":77,"correct":22},"发电机变压器线路组。",{"id":79,"libraryId":5,"type":15,"typeLabel":16,"stem":80,"options":81,"answer":24,"analysis":33},1023768,"某开关站有500kV出线9回，其中电源进线4回，负荷出线5回。",[82,83,84,85],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":29},{"key":27,"text":27,"correct":22},{"key":31,"text":31,"correct":22},{"id":87,"libraryId":5,"type":15,"typeLabel":16,"stem":88,"options":89,"answer":20,"analysis":33},1023769,"某开关站有500kV出线9回，其中电源进线4回，负荷出线5回。 此开关站的站用电源的方式为（），并最终经比较论证确定。",[90,92,94,96],{"key":20,"text":91,"correct":29},"设置柴油发电机或由附近较低电压引取；",{"key":24,"text":93,"correct":22},"由开关站的施工电源引接；",{"key":27,"text":95,"correct":22},"从500kV高电压母线引取；",{"key":31,"text":97,"correct":22},"建立自备发电厂。",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":80,"options":100,"answer":31,"analysis":33},1023770,[101,102,103,104],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":22},{"key":27,"text":27,"correct":22},{"key":31,"text":31,"correct":29},{"id":106,"libraryId":5,"type":15,"typeLabel":16,"stem":107,"options":108,"answer":20,"analysis":33},1023771,"某电厂装设4X200MW机组，有110kV及220kV升高电压，电厂潮流均应向两种 高压送电。 其发电机变压器宜采用的组合为（ )。",[109,111,113,115],{"key":20,"text":110,"correct":29},"双绕组变压器、联络变压器；",{"key":24,"text":112,"correct":22},"三绕组变压器、联络变压器；",{"key":27,"text":114,"correct":22},"三绕组自耦变压器、联络变压器；",{"key":31,"text":116,"correct":22},"自耦变压器、联络变压器。",{"id":118,"libraryId":5,"type":15,"typeLabel":16,"stem":119,"options":120,"answer":20,"analysis":33},1023772,"某电厂装设4X200MW机组，有110kV及220kV升高电压，电厂潮流均应向两种 高压送电。",[121,123,125,127],{"key":20,"text":122,"correct":29},"此时启动变压器可利用联络变压器的低压侧，但仍需再设（）启动变压器。",{"key":24,"text":124,"correct":22},"1 台；",{"key":27,"text":126,"correct":22},"2.台； C3 台；",{"key":31,"text":128,"correct":22},"4 台。",{"id":130,"libraryId":5,"type":15,"typeLabel":16,"stem":131,"options":132,"answer":24,"analysis":33},1023773,"某电厂装设4X200MW机组，有110kV及220kV升高电压，电厂潮流均应向两种 高压送电。 其发电机出口回路（ ）。",[133,135,137,139],{"key":20,"text":134,"correct":22},"装设断路器；",{"key":24,"text":136,"correct":29},"不库装设断路器；",{"key":27,"text":138,"correct":22},"暂不装设断路器；",{"key":31,"text":140,"correct":22},"装设隔离开关。",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":20,"analysis":33},1023774,"发电机中性点的设计类型。 满足发电机中性点不接地方式的条件是（).",[145,147,149,151],{"key":20,"text":146,"correct":29},"发电机接地电流不超过允许值；",{"key":24,"text":148,"correct":22},"发电机中性点无避雷器；",{"key":27,"text":150,"correct":22},"125MW以上机组适用；",{"key":31,"text":152,"correct":22},"发电机直配线无避雷器。",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":20,"analysis":33},1023775,"发电机中性点的设计类型。 发电机经消弧线圈接地（）。",[157,159,161,163],{"key":20,"text":158,"correct":29},"补偿后单相接地电流小于允许值；",{"key":24,"text":160,"correct":22},"适用单相接地电流小于允许值的中小机组；",{"key":27,"text":162,"correct":22},"接地保护动作于跳闸；",{"key":31,"text":164,"correct":22},"采用其他方式补偿不适宜的机组。",{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":167,"options":168,"answer":20,"analysis":33},1023776,"发电机中性点的设计类型。",[169,171,173,175],{"key":20,"text":170,"correct":29},"发电机中性点经髙电阻接地适用条件是（）。",{"key":24,"text":172,"correct":22},"200MW以上大机组； B单相接地故障电流小于3A;",{"key":27,"text":174,"correct":22},"可带延时跳闸；",{"key":31,"text":176,"correct":22},"接地故障可带信号。",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":27,"analysis":33},1023777,"某电厂有3台50MW机组，发电机电压为10. 5kV，负荷要求地方10kV送电。当地 区负荷较少时，应将富余功率外送，系统电网为35kV及110kV，地区送电线要求10kV 12 回，高压各2回。 对于10kV应采用的接线为（ ）。",[181,183,185,187],{"key":20,"text":182,"correct":22},"单母线；",{"key":24,"text":184,"correct":22},"单母线分段；",{"key":27,"text":186,"correct":29},"双母线；",{"key":31,"text":188,"correct":22},"双母线分段。",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":27,"analysis":33},1023778,"某电厂有3台50MW机组，发电机电压为10. 5kV，负荷要求地方10kV送电。当地 区负荷较少时，应将富余功率外送，系统电网为35kV及110kV，地区送电线要求10kV 12 回，高压各2回。 经短路电流计算，3台发电机电压母线短路电流较大，为限制短路电流，在（） 设置电抗器为宜。",[193,195,197,199],{"key":20,"text":194,"correct":22},"发电机出口；",{"key":24,"text":196,"correct":22},"变压器低压例；",{"key":27,"text":198,"correct":29},"分段断路器侧或10kV出线侧；",{"key":31,"text":200,"correct":22},"变压器高压侧。",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":27,"analysis":33},1023779,"某电厂有3台50MW机组，发电机电压为10. 5kV，负荷要求地方10kV送电。当地 区负荷较少时，应将富余功率外送，系统电网为35kV及110kV，地区送电线要求10kV 12 回，高压各2回。 如果要求将发电机富余功率送入系统，升压变压器应（）。",[205,207,209,211],{"key":20,"text":206,"correct":22},"设3台升压三绕組变压器；",{"key":24,"text":208,"correct":22},"设2台升压变压器至110kV,另设一台联络变压器；",{"key":27,"text":210,"correct":29},"设2台升压三绕组变压器；",{"key":31,"text":212,"correct":22},"设1台三绕组变压器，一台联络变压器。",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":31,"analysis":33},1023780,"某城市中有220kV变电站，降压为110kV及10kV, 220kV出线为4回，110kV出 线5回，10kV出线10回。220kV拟采用SF6组合电器（GIS)，110kV为户内一般设备配 SF6断路器，10kV为开关柜。 三种电压宜采用的接线组合为（）。",[217,219,221,223],{"key":20,"text":218,"correct":22},"220kV双母线，110kV双母线，10kV单母线；",{"key":24,"text":220,"correct":22},"220kV双母线带旁路’ 110kV双母线帝旁路，10kV单母线；",{"key":27,"text":222,"correct":22},"220kV单母线，110kV双母线，10kV单母线；",{"key":31,"text":224,"correct":29},"220kV双母线，110kV单母线分段，10kV单母线分段。",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":27,"analysis":33},1023781,"某城市中有220kV变电站，降压为110kV及10kV, 220kV出线为4回，110kV出 线5回，10kV出线10回。220kV拟采用SF6组合电器（GIS)，110kV为户内一般设备配 SF6断路器，10kV为开关柜。 若220kV线路为架空进线，线路侧()。",[229,231,233,235],{"key":20,"text":230,"correct":22},"不应装避雷器；",{"key":24,"text":232,"correct":22},"宜装避雷器;",{"key":27,"text":234,"correct":29},"不装避雷器；",{"key":31,"text":236,"correct":22},"可装避雷器。",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":24,"analysis":33},1023782,"某城市中有220kV变电站，降压为110kV及10kV, 220kV出线为4回，110kV出 线5回，10kV出线10回。220kV拟采用SF6组合电器（GIS)，110kV为户内一般设备配 SF6断路器，10kV为开关柜。 主变压器宜采用（）。",[241,243,245,247],{"key":20,"text":242,"correct":22},"1台三绕组变压器；",{"key":24,"text":244,"correct":29},"2台三绕组变压器",{"key":27,"text":246,"correct":22},"1台双绕组加一台联络变压器；",{"key":31,"text":248,"correct":22},"3台三绕组变压器",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":20,"analysis":33},1023783,"图4-2的几种接线都可以称为母联兼旁路接线，在实际应用中各有优缺点。 布置上最简单的是（）。",[253,255,257,259],{"key":20,"text":254,"correct":29},"(a)",{"key":24,"text":256,"correct":22},"(b)",{"key":27,"text":258,"correct":22},"(c);",{"key":31,"text":260,"correct":22},"(d)。",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":31,"analysis":33},1023784,"图4-2的几种接线都可以称为母联兼旁路接线，在实际应用中各有优缺点。 在使用中，出线断路器检修时，必须进行倒闸操作，变为单母线运行的是（）。",[265,266,268,269],{"key":20,"text":254,"correct":22},{"key":24,"text":267,"correct":22},"(b)；",{"key":27,"text":258,"correct":22},{"key":31,"text":260,"correct":29},{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":27,"analysis":33},1023785,"图4-2的几种接线都可以称为母联兼旁路接线，在实际应用中各有优缺点。 布置上比较困难的、需要占用相邻间隔场地的是（）。 A. (a)和（b);",[274,276,278,280],{"key":20,"text":275,"correct":22},"(b)和（c);",{"key":24,"text":277,"correct":22},"(c)和（d);",{"key":27,"text":279,"correct":29},"(d)和（a)",{"key":31,"text":281,"correct":22},"注：占用相邻间隔，有时是为了过渡而采用这种接线，对长远没影响",{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":31,"analysis":33},1023786,"为节约投资，在系统允许的情况下，边远地区的终端变电站或分支变电站，可以采 用简易电器的变电站。 一般简易电器变电站最高电压为（）。",[286,288,290,292],{"key":20,"text":287,"correct":22},"10kV;",{"key":24,"text":289,"correct":22},"35kV；",{"key":27,"text":291,"correct":22},"66kV；",{"key":31,"text":293,"correct":29},"110kV。",{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":24,"analysis":33},1023787,"为节约投资，在系统允许的情况下，边远地区的终端变电站或分支变电站，可以采 用简易电器的变电站。 其变压器台数及进出线回路为（）。",[298,300,302,304],{"key":20,"text":299,"correct":22},"3?4回进出线；",{"key":24,"text":301,"correct":29},"1?2回进出线；",{"key":27,"text":303,"correct":22},"2?3回进出线；",{"key":31,"text":305,"correct":22},"4回以上。",{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":27,"analysis":33},1023788,"为节约投资，在系统允许的情况下，边远地区的终端变电站或分支变电站，可以采 用简易电器的变电站。",[310,312,314,316],{"key":20,"text":311,"correct":22},"其最大容量一般为（）。",{"key":24,"text":313,"correct":22},"10MVA;",{"key":27,"text":315,"correct":29},"20MVA； C16MVA；",{"key":31,"text":317,"correct":22},"18MVA。",{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":20,"analysis":33},1023789,"为节约投资，在系统允许的情况下，边远地区的终端变电站或分支变电站，可以采 用简易电器的变电站。 主要保护措施为（）。",[322,324,326,328],{"key":20,"text":323,"correct":29},"快速隔离开关和接地开关；",{"key":24,"text":325,"correct":22},"组合开关；",{"key":27,"text":327,"correct":22},"隔离开关；",{"key":31,"text":329,"correct":22},"负荷开关。",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":24,"analysis":33},1023790,"6?63kV系统可采用中性点不接地系统，以提高供电连续性但单相接地电流大于允 许值时，可装设消弧线圏。 对35?66kV而言，单相接地电容电流允许值为（）",[334,336,338,340],{"key":20,"text":335,"correct":22},"5A;",{"key":24,"text":337,"correct":29},"10A",{"key":27,"text":339,"correct":22},"15A",{"key":31,"text":341,"correct":22},"20A。",{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":31,"analysis":33},1023791,"6?63kV系统可采用中性点不接地系统，以提高供电连续性但单相接地电流大于允 许值时，可装设消弧线圏。 当决定在35?66kV系统中装设消弧线圏时，应遵守的原则为（）。",[346,348,350,352],{"key":20,"text":347,"correct":22},"消孤线圈相对集中便于管理；",{"key":24,"text":349,"correct":22},"消弧线圈随意分散布置；",{"key":27,"text":351,"correct":22},"可以集中装设一个消弧线圈",{"key":31,"text":353,"correct":29},"任何运行方式都不可失去消弧线圈以及消弧线圏分散布置。",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":24,"analysis":33},1023792,"6?63kV系统可采用中性点不接地系统，以提高供电连续性但单相接地电流大于允 许值时，可装设消弧线圏。 同一变电所内如有两台变压器可先设一个消弧线圏，但应（）。",[358,360,362,364],{"key":20,"text":359,"correct":22},"两台主变压器中性点接一个消弧线圈；",{"key":24,"text":361,"correct":29},"两台主变压器中性点经隔离开关接至一个消弧线面；",{"key":27,"text":363,"correct":22},"两只隔离开关平时只合一只；",{"key":31,"text":365,"correct":22},"两只隔离开关平时都打开",{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":20,"analysis":33},1023793,"6?63kV系统可采用中性点不接地系统，以提高供电连续性但单相接地电流大于允 许值时，可装设消弧线圏。 如本变电所无中性点引出，应该（）。",[370,372,374,376],{"key":20,"text":371,"correct":29},"增加一台接地变压器；",{"key":24,"text":373,"correct":22},"另选接地点；",{"key":27,"text":375,"correct":22},"在邻近变电所装设",{"key":31,"text":377,"correct":22},"由系统解决。",{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":20,"analysis":33},1023794,"二回进出线应考虑（）断路器。",[382,384,386,387],{"key":20,"text":383,"correct":29},"2 台；",{"key":24,"text":385,"correct":22},"3 台；",{"key":27,"text":124,"correct":22},{"key":31,"text":128,"correct":22},{"id":389,"libraryId":5,"type":15,"typeLabel":16,"stem":390,"options":391,"answer":27,"analysis":33},1023795,"三回进出线应考虑（）断路器",[392,394,396,398],{"key":20,"text":393,"correct":22},"2?3台；",{"key":24,"text":395,"correct":22},"2?4台；",{"key":27,"text":397,"correct":29},"3~5台；",{"key":31,"text":399,"correct":22},"3?6台。",{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":27,"analysis":33},1023796,"四回进出线应考虑（）断路器。",[404,406,408,410],{"key":20,"text":405,"correct":22},"3?4台；",{"key":24,"text":407,"correct":22},"3?5台",{"key":27,"text":409,"correct":29},"4?6台；",{"key":31,"text":411,"correct":22},"4?7台。",{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":27,"analysis":33},1023797,"五回进出线应考虑（）断路器。",[416,418,420,422],{"key":20,"text":417,"correct":22},"5?6台；",{"key":24,"text":419,"correct":22},"5?7台；",{"key":27,"text":421,"correct":29},"5?8台；",{"key":31,"text":423,"correct":22},"5?9台。",{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":20,"analysis":33},1023798,"某沿海电厂二期扩建4台600MW燃煤机组，电厂附近已建有400t的大件码头。电 厂一期以220kV升高电压接入系统，二期4X600MW机组均接入厂内500kV配电装置， 500kV出线规模为2回，厂内两级电压间交换容量为360MVA。 二期主变压器的型式为（）。",[428,430,432,434],{"key":20,"text":429,"correct":29},"双绕组三相变压器；",{"key":24,"text":431,"correct":22},"三绕组三相变压器;",{"key":27,"text":433,"correct":22},"双绕组单相变压器；",{"key":31,"text":435,"correct":22},"三绕组单相变压器。",{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":27,"analysis":33},1023799,"某沿海电厂二期扩建4台600MW燃煤机组，电厂附近已建有400t的大件码头。电 厂一期以220kV升高电压接入系统，二期4X600MW机组均接入厂内500kV配电装置， 500kV出线规模为2回，厂内两级电压间交换容量为360MVA。 500kV的接线型式为（ ）。",[440,442,444,446],{"key":20,"text":441,"correct":22},"双母线双分段；",{"key":24,"text":443,"correct":22},"双母线单分段；",{"key":27,"text":445,"correct":29},"一台半断路器接线；",{"key":31,"text":447,"correct":22},"角形接线。",{"id":449,"libraryId":5,"type":15,"typeLabel":16,"stem":450,"options":451,"answer":27,"analysis":33},1023800,"某沿海电厂二期扩建4台600MW燃煤机组，电厂附近已建有400t的大件码头。电 厂一期以220kV升高电压接入系统，二期4X600MW机组均接入厂内500kV配电装置， 500kV出线规模为2回，厂内两级电压间交换容量为360MVA。 为实现两级电压间容量交换，考虑设一台360MVA的自耦变压器作联络变压器， 自变压器的容量为（）。",[452,454,456,458],{"key":20,"text":453,"correct":22},"90MVA;",{"key":24,"text":455,"correct":22},"100MVA",{"key":27,"text":457,"correct":29},"202MVA",{"key":31,"text":459,"correct":22},"60MVA。",{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":27,"analysis":33},1023801,"某沿海电厂二期扩建4台600MW燃煤机组，电厂附近已建有400t的大件码头。电 厂一期以220kV升高电压接入系统，二期4X600MW机组均接入厂内500kV配电装置， 500kV出线规模为2回，厂内两级电压间交换容量为360MVA。 两个电网间的电压差越大，由自耦变压器作联络变压器的，自耦变压器的经济效益 ( )",[464,466,468,470],{"key":20,"text":465,"correct":22},"不受电压影响；",{"key":24,"text":467,"correct":22},"越好；",{"key":27,"text":469,"correct":29},"越差；",{"key":31,"text":471,"correct":22},"与自耦变压器的容量有关。",{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":20,"analysis":33},1023802,"某沿海电厂二期扩建4台600MW燃煤机组，电厂附近已建有400t的大件码头。电 厂一期以220kV升高电压接入系统，二期4X600MW机组均接入厂内500kV配电装置， 500kV出线规模为2回，厂内两级电压间交换容量为360MVA。 自耦变压器的第三绕组容量宜为（）。",[476,478,480,482],{"key":20,"text":477,"correct":29},"90MVA；",{"key":24,"text":479,"correct":22},"60MVA；",{"key":27,"text":481,"correct":22},"210MVA；",{"key":31,"text":483,"correct":22},"50MVA。",{"id":485,"libraryId":5,"type":15,"typeLabel":16,"stem":486,"options":487,"answer":20,"analysis":33},1023803,"当每段发电机容量为12MW以下时，发电机电压母线宜采用（）接线方式。 A.单母线或单母线分段； B.双母线；C双母线或双母线分段； D.单母线。",[488,489,490,491],{"key":20,"text":20,"correct":29},{"key":24,"text":24,"correct":22},{"key":27,"text":27,"correct":22},{"key":31,"text":31,"correct":22},{"id":493,"libraryId":5,"type":15,"typeLabel":16,"stem":494,"options":495,"answer":24,"analysis":33},1023804,"当每段发电机容量为12MW以上时，发电机电压母线宜采用（）接线方式。 A.单母线或单母线分段； B.双母线或双母线分段；C单母线D双母线。",[496,497,498,499],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":29},{"key":27,"text":27,"correct":22},{"key":31,"text":31,"correct":22},{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":24,"analysis":33},1023805,"若某变电所欲采用桥型接线，但高压侧有穿越功率，此时宜采用（）接线方式。",[504,506,508,510],{"key":20,"text":505,"correct":22},"内桥；",{"key":24,"text":507,"correct":29},"外桥；",{"key":27,"text":509,"correct":22},"内桥加跨条；",{"key":31,"text":511,"correct":22},"外桥加跨条。",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":20,"analysis":33},1023806,"110kV送电线路与公路交叉时，导线到路面的最小垂直距离不应小于（）。",[516,518,520,522],{"key":20,"text":517,"correct":29},"7. 0m;",{"key":24,"text":519,"correct":22},"7. 5m；",{"key":27,"text":521,"correct":22},"8. Om",{"key":31,"text":523,"correct":22},"8. 5m",{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":24,"analysis":33},1023807,"330kV送电线路与公路交叉时，导线到路面的最小垂直距离不应小于（〉。 A. 8. 0m； B. 9. 0m C 10. 0m； D. 12. 0m。",[528,529,530,531],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":29},{"key":27,"text":27,"correct":22},{"key":31,"text":31,"correct":22},{"id":533,"libraryId":5,"type":15,"typeLabel":16,"stem":534,"options":535,"answer":31,"analysis":33},1023808,"500kV导线与步行不能到达的山坡峭壁、岩石间的净空距离在最大风偏情况下，不应小于（）。",[536,538,540,542],{"key":20,"text":537,"correct":22},"5. 0m；",{"key":24,"text":539,"correct":22},"5. 5m；",{"key":27,"text":541,"correct":22},"6. Om；",{"key":31,"text":543,"correct":29},"6. 5m。",{"id":545,"libraryId":5,"type":15,"typeLabel":16,"stem":546,"options":547,"answer":27,"analysis":33},1023809,"在最大计算弧垂情况下，直流线路导线通过非居民区时，其离地面距离不应小于 ().",[548,550,552,554],{"key":20,"text":549,"correct":22},"10. Om;",{"key":24,"text":551,"correct":22},"12. Om；",{"key":27,"text":553,"correct":29},"12. 5m;",{"key":31,"text":555,"correct":22},"14m。",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":20,"analysis":33},1023810,"±500kV直流线路导线与步行可以到达的山坡的最小净空距离，在最大计算风偏情 况下，不应小于（ ）。 A. 11. 0m； B. 11. 5m； C 12. Om； D. 14.0m。",[560,561,562,563],{"key":20,"text":20,"correct":29},{"key":24,"text":24,"correct":22},{"key":27,"text":27,"correct":22},{"key":31,"text":31,"correct":22},{"id":565,"libraryId":5,"type":15,"typeLabel":16,"stem":566,"options":567,"answer":24,"analysis":33},1023811,"±500kV直流线路与铁路交叉时，导线到铁路轨顶最小距离不应小于（ ）。 A. 14. 0m B. 16. Om; C 17. Om; D. 20. Om。",[568,569,570,571],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":29},{"key":27,"text":27,"correct":22},{"key":31,"text":31,"correct":22},{"id":573,"libraryId":5,"type":15,"typeLabel":16,"stem":574,"options":575,"answer":31,"analysis":33},1023812,"±500kV直流线路与公路交叉时，导线到1?3级公路路面最小距离不应小于( )。 A. 10. 0m; B. 12. 0m; C 14. 0m D. 16. 0m。",[576,577,578,579],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":22},{"key":27,"text":27,"correct":22},{"key":31,"text":31,"correct":29},[581,584,587,590,593,596],{"id":15,"name":582,"category":7,"favorite":583},"领导干部任职前廉政法规知识测试题",92,{"id":585,"name":586,"category":7,"favorite":15},595,"建筑结构与设备",{"id":588,"name":589,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":591,"name":592,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":594,"name":595,"category":7,"favorite":8},534,"BIM工程师",{"id":597,"name":595,"category":7,"favorite":8},535]