[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-751-38":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":615},{"id":5,"name":6,"category":7,"favorite":8},751,"电气工程师发输变电专业","建筑工程",0,38,50,2670,[13,34,46,58,70,82,94,106,118,130,142,152,164,175,187,199,211,223,235,247,259,271,283,295,307,319,331,343,355,367,379,391,403,415,427,439,451,463,475,487,499,511,523,535,547,559,571,582,591,603],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1023612,1,"单选题","某500kV变电站的主变压器型式为：三相油浸自耦变压器，无载调压，冷却方式为强油风冷。主要技术参数为： 电流互感器额定二次电流：三侧均为1A。 按双重化配置微机型变压器保护。 下列关于变压器差动保护的描述中，正确的是（）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","采用差动电流中二次谐波含量可防止变压器励磁涌流引起差动保护误动；",false,{"key":24,"text":25,"correct":22},"B","采用差动电流的波形畸变识别可防止变压器励磁涌流引起差动保护误动；",{"key":27,"text":28,"correct":29},"C","采用差动电流中二次谐波比可防止变压器励磁涌流引起差动保护误动；",true,{"key":31,"text":32,"correct":22},"D","采用差动速断保护可在变压器区内严重故障时快速跳开变压器各侧开关。","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1023613,"某500kV变电站的主变压器型式为：三相油浸自耦变压器，无载调压，冷却方式为强油风冷。主要技术参数为： 电流互感器额定二次电流：三侧均为1A。 按双重化配置微机型变压器保护。 变压器差动保护动作电流定值的整定计算原则是（）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"按躲过变压器额定运行时最大不平衡电流整定；",{"key":24,"text":41,"correct":29},"按躲过变压器外部短路时最大不平衡电流整定；",{"key":27,"text":43,"correct":22},"按躲过变压器励磁涌流整定；",{"key":31,"text":45,"correct":22},"按躲过变压器运行时最大负荷电流整定，",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},1023614,"某500kV变电站的主变压器型式为：三相油浸自耦变压器，无载调压，冷却方式为强油风冷。主要技术参数为： 电流互感器额定二次电流：三侧均为1A。 按双重化配置微机型变压器保护。 假定：Ie为变压器高压侧二次额定电流，Kk为可靠系数（取1.5）, Kct为电流互感器变比误差系数（取0.1），Kb为变压器调压误差系数（取0.1）。则该主变压器差动保护 动作电流定值Icd=（）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"0.1Ie；",{"key":24,"text":53,"correct":22},"O.2Ie；",{"key":27,"text":55,"correct":29},"O.3Ie；",{"key":31,"text":57,"correct":22},"0.4Ie。",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},1023615,"某500kV变电站的主变压器型式为：三相油浸自耦变压器，无载调压，冷却方式为强油风冷。主要技术参数为： 电流互感器额定二次电流：三侧均为1A。 按双重化配置微机型变压器保护。 下列关于500kV变压器非电量保护（如瓦斯保护等）的描述中，正确的是（）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"动作后应同时启动重合闸装置和断路器失灵回路；",{"key":24,"text":65,"correct":22},"动作后不应启动重合闸装置，但应启动断硌雾失灵闻路；",{"key":27,"text":67,"correct":22},"动作后应启动重合闸装置，但不应启动断路器失灵保护；",{"key":31,"text":69,"correct":29},"动作后不应启动重合闸装置，也不应启动断路器失灵保护。",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":27,"analysis":33},1023616,"某500kV变电站的主变压器型式为：三相油浸自耦变压器，无载调压，冷却方式为强油风冷。主要技术参数为： 电流互感器额定二次电流：三侧均为1A。 按双重化配置微机型变压器保护。 假定变压器过负荷保护接于准确级次为5P20的电流互感器，下列关于5P20误差限值的描述中，正确的是（）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"一次短路电流为額定电流20倍时比值谡差不大于5%；",{"key":24,"text":77,"correct":22},"一次短路电流为額定电流20倍时相角误差不大于5%；",{"key":27,"text":79,"correct":29},"一次短路电流为額定电流20倍时复合误差不大于5%；",{"key":31,"text":81,"correct":22},"—次短路电流为額定电流5倍时复合误差不大于20%。",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":27,"analysis":33},1023617,"某500kV变电站的建设规模如下： 主变压器：初期1组750MVA变压器，最终2台.750MVA变压器；500kV出线：远景12回，其中6回出线装设高压并联电抗器。本期建设4回出线，其中1回出线装设高压并联电抗器； 220kV出线：远景12回，本期4回； 35kV无功补偿：每台主变压器低压侧装设2组40Mvar低压并联电容器和3组60MVar低压并联电抗器，初期只装设2组60Mvar低压并联电抗器。 变电站为有人值班，采用计算机监控系统，设有主控制室、500kV51小室、500kV52小室、220kV小室、主变压器小室。请确定： 下列关于主控制室和继电器小室设置的描述中，不正确的是（）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"有人值班的变电站应设主控制室；",{"key":24,"text":89,"correct":22},"主控制室设计宜按最终规划建设规摸在第一期工程中一次建成；",{"key":27,"text":91,"correct":29},"继电器小室的谈计和布置只需考虑位置靠近配电装置，使控制电缆最短；",{"key":31,"text":93,"correct":22},"各设备和元件的继电保护装里和电能表，宜装设在靠近配电装里的继电器小室内。",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":27,"analysis":33},1023618,"某500kV变电站的建设规模如下： 主变压器：初期1组750MVA变压器，最终2台.750MVA变压器；500kV出线：远景12回，其中6回出线装设高压并联电抗器。本期建设4回出线，其中1回出线装设高压并联电抗器； 220kV出线：远景12回，本期4回； 35kV无功补偿：每台主变压器低压侧装设2组40Mvar低压并联电容器和3组60MVar低压并联电抗器，初期只装设2组60Mvar低压并联电抗器。 变电站为有人值班，采用计算机监控系统，设有主控制室、500kV51小室、500kV52小室、220kV小室、主变压器小室。请确定： 根据继电器室内屏柜布置要求，屏正面至屏正面的一般尺寸和最小尺寸分别是（）mm。",[98,100,102,104],{"key":20,"text":99,"correct":22},"1500，1200；",{"key":24,"text":101,"correct":22},"1500,1400；",{"key":27,"text":103,"correct":29},"1800,1400；",{"key":31,"text":105,"correct":22},"1800，1200。",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},1023619,"某500kV变电站的建设规模如下： 主变压器：初期1组750MVA变压器，最终2台.750MVA变压器；500kV出线：远景12回，其中6回出线装设高压并联电抗器。本期建设4回出线，其中1回出线装设高压并联电抗器； 220kV出线：远景12回，本期4回； 35kV无功补偿：每台主变压器低压侧装设2组40Mvar低压并联电容器和3组60MVar低压并联电抗器，初期只装设2组60Mvar低压并联电抗器。 变电站为有人值班，采用计算机监控系统，设有主控制室、500kV51小室、500kV52小室、220kV小室、主变压器小室。请确定： 下列关于继电器屏的屏面布置的描述中，不正确的是（）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"当设备或元件装设两套主保护装里时，宜分别布置在两块屏上；",{"key":24,"text":113,"correct":29},"各屏上信号继电器宜集中布里，安装水平高度应一致，高度不宜低于800mm；",{"key":27,"text":115,"correct":22},"试验部件与连接片，安装中心线离地面不宜低于300mm；",{"key":31,"text":117,"correct":22},"相同安装单位的屏面布置宜对应一致，不同安装单位的继电器装在一块屏上时，宜按纵向划分，其布里应对应一致。",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":27,"analysis":33},1023620,"某500kV变电站的建设规模如55题所述。变电站为有人值班，设有主控制室、500kV51小室、500kV52小室、220kV小室、主变压器小室。全站设置一套计算机监控系统实现监视、控制、远动等功能，监控系统的站控层设备布置在主控制室内，间隔层设备布置在各个小室内。请确定： 计算机监控系统的站控层与间隔层的连接方式为（）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"不连接；",{"key":24,"text":125,"correct":22},"只能直接连接；",{"key":27,"text":127,"correct":29},"可直接连接，也可通过前置晨设备进行连接；",{"key":31,"text":129,"correct":22},"只能通过前置层设备进行连接。",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":27,"analysis":33},1023621,"某500kV变电站的建设规模如55题所述。变电站为有人值班，设有主控制室、500kV51小室、500kV52小室、220kV小室、主变压器小室。全站设置一套计算机监控系统实现监视、控制、远动等功能，监控系统的站控层设备布置在主控制室内，间隔层设备布置在各个小室内。请确定： 下列不属于计算机监控系统站控层设备的是（）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"主机；",{"key":24,"text":137,"correct":22},"远动工作站；",{"key":27,"text":139,"correct":29},"I\u002FO单元；",{"key":31,"text":141,"correct":22},"工程师工作站。",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},1023622,"某500kV变电站的建设规模如55题所述。变电站为有人值班，设有主控制室、500kV51小室、500kV52小室、220kV小室、主变压器小室。全站设置一套计算机监控系统实现监视、控制、远动等功能，监控系统的站控层设备布置在主控制室内，间隔层设备布置在各个小室内。请确定： 下列设备中可不需按双重化配置的是（）。",[146,147,149,150],{"key":20,"text":135,"correct":22},{"key":24,"text":148,"correct":29},"工程师工作站；",{"key":27,"text":137,"correct":22},{"key":31,"text":151,"correct":22},"站控层两络。",{"id":153,"libraryId":5,"type":15,"typeLabel":16,"stem":154,"options":155,"answer":20,"analysis":33},1023623,"某500kV变电站的建设规模如55题所述。变电站为有人值班，设有主控制室、500kV51小室、500kV52小室、220kV小室、主变压器小室。全站设置一套计算机监控系统实现监视、控制、远动等功能，监控系统的站控层设备布置在主控制室内，间隔层设备布置在各个小室内。请确定： 计算机监控系统中主机的正常负荷率、事故负荷率分别宜低于（）",[156,158,160,162],{"key":20,"text":157,"correct":29},"30%,50%；",{"key":24,"text":159,"correct":22},"50%,30%；",{"key":27,"text":161,"correct":22},"70%,50%；",{"key":31,"text":163,"correct":22},"50%,70%。",{"id":165,"libraryId":5,"type":15,"typeLabel":16,"stem":166,"options":167,"answer":24,"analysis":33},1023624,"某500kV变电站的建设规模如55题所述。变电站为有人值班，设有主控制室、500kV51小室、500kV52小室、220kV小室、主变压器小室。全站设置一套计算机监控系统实现监视、控制、远动等功能，监控系统的站控层设备布置在主控制室内，间隔层设备布置在各个小室内。请确定： 计算机监控系统中网络的正常负荷率、事故负荷率分别宜低于（）。",[168,170,172,173],{"key":20,"text":169,"correct":22},"40%,20%；",{"key":24,"text":171,"correct":29},"20%,40%；",{"key":27,"text":157,"correct":22},{"key":31,"text":174,"correct":22},"50%,30%。",{"id":176,"libraryId":5,"type":15,"typeLabel":16,"stem":177,"options":178,"answer":27,"analysis":33},1023625,"某500kV变电站的建设规模如55题所述。变电站为有人值班，设有主控制室、500kV51小室、500kV52小室、220kV小室、主变压器小室。全站设置一套计算机监控系统实现监视、控制、远动等功能，监控系统的站控层设备布置在主控制室内，间隔层设备布置在各个小室内。请确定： 下列关于计算机监控系统设备接地的描述中，正确的是（）。",[179,181,183,185],{"key":20,"text":180,"correct":22},"计算机监控系统设备的信号接地可与安全保护接地和交流接地混接；",{"key":24,"text":182,"correct":22},"向二次设备供电的交流电源应有中性线（零线）回路，中性线可在任何地点与接地网相连；",{"key":27,"text":184,"correct":29},"当采用没有隔离的串行通信口从一处引接至另一处时，两处必须共用同一接地系统，若不能实现则需増加电气隔离推施；",{"key":31,"text":186,"correct":22},"变电站计算机监控系统必须设里独立的接地网。",{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":20,"analysis":33},1023626,"某500kV变电站的建设规模如55题所述。变电站为有人值班，设有主控制室、500kV51小室、500kV52小室、220kV小室、主变压器小室。全站设置一套计算机监控系统实现监视、控制、远动等功能，监控系统的站控层设备布置在主控制室内，间隔层设备布置在各个小室内。请确定： 下列关于向监控系统站控层设备供电的UPS系统的描述中，正确的是（）。",[191,193,195,197],{"key":20,"text":192,"correct":29},"UPS宜采用单相式，输出电压为220V、50Hz,备用时间不小于1h；",{"key":24,"text":194,"correct":22},"UPS宜采用三相式，输出电压为220V、50Hz,备用时间不小于1h；",{"key":27,"text":196,"correct":22},"UPS宜采用单相式，输出电压为110V、50Hz,备用时间不小于2h；",{"key":31,"text":198,"correct":22},"UPS宜采用单相式，输出电压为220V、50Hz,备用时间不小于0.5h。",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":24,"analysis":33},1023627,"某500kV变电站的建设规模如55题所述。变电站为有人值班，设有主控制室、500kV51小室、500kV52小室、220kV小室、主变压器小室。全站设置一套计算机监控系统实现监视、控制、远动等功能，监控系统的站控层设备布置在主控制室内，间隔层设备布置在各个小室内。请确定： 下列关于计算机监控系统连接电缆的描述中，不正确的是（）。",[203,205,207,209],{"key":20,"text":204,"correct":22},"模拟量弱电信号输入回路电缆应选用对绞屏蔽电缆，芯线的截面不小于0.75mm2；",{"key":24,"text":206,"correct":29},"双重化网络中的两个网络可共用一根光缆；",{"key":27,"text":208,"correct":22},"500kV变电站计算机监控系统的户外通信介质应选用光纤电缆；",{"key":31,"text":210,"correct":22},"不同类型的信号回路不应共用同一根电缆。",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":24,"analysis":33},1023628,"某500kV变电站的建设规模如55题所述。变电站为有人值班，设有主控制室、500kV51小室、500kV52小室、220kV小室、主变压器小室。全站设置一套计算机监控系统实现监视、控制、远动等功能，监控系统的站控层设备布置在主控制室内，间隔层设备布置在各个小室内。请确定： 变电站计算机监控系统具有手动控制和自动控制两种控制方式，其中手动控制包括调度通信控制中心控制、站内主控制室控制、就地手动控制，其控制级别应是（）。",[215,217,219,221],{"key":20,"text":216,"correct":22},"属于同一级别；",{"key":24,"text":218,"correct":29},"控制级别由高到低顺序为：就地、站内主控、远程调度中心；",{"key":27,"text":220,"correct":22},"控制级别由高到低顺序为：站内主控、就地、远程调度中心；",{"key":31,"text":222,"correct":22},"控制级别由高到低顺序为：远程调度中心、站内主控、就地。",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":20,"analysis":33},1023629,"某500kV变电站的建设规模如55题所述。变电站为有人值班，设有主控制室、500kV51小室、500kV52小室、220kV小室、主变压器小室。全站设置一套计算机监控系统实现监视、控制、远动等功能，监控系统的站控层设备布置在主控制室内，间隔层设备布置在各个小室内。请确定： 在计算机监控系统中，间隔层设备与GPS标准时钟的误差应不大于（），事件顺序记录分辨率（SO E）不大于（）。",[227,229,231,233],{"key":20,"text":228,"correct":29},"1ms,2ms；",{"key":24,"text":230,"correct":22},"1ms,1ms；",{"key":27,"text":232,"correct":22},"2ms,1ms；",{"key":31,"text":234,"correct":22},"2ms,2ms。",{"id":236,"libraryId":5,"type":15,"typeLabel":16,"stem":237,"options":238,"answer":20,"analysis":33},1023630,"某300MW机组火力发电工程，主厂房设两台工作变压器，容量互为备用，设一段电动机控制中心（MC C）,变压器中性点直接接地?选择柴油发电机组时，事故保安A段计算负荷为435kVA,B段计算负荷为430kV A，重复计算负荷300kVA。接于PC和MCC的电负荷资料及厂用电接线见图5。",[239,241,243,245],{"key":20,"text":240,"correct":29},"如不考虑供电距离的影响， MCC盘上的计算负荷至多为（）。",{"key":24,"text":242,"correct":22},"31.5kVA；",{"key":27,"text":244,"correct":22},"33.25kVA；C36.75kVA；",{"key":31,"text":246,"correct":22},"64.75kVA?",{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":27,"analysis":33},1023631,"某300MW机组火力发电工程，主厂房设两台工作变压器，容量互为备用，设一段电动机控制中心（MC C）,变压器中性点直接接地?选择柴油发电机组时，事故保安A段计算负荷为435kVA,B段计算负荷为430kV A，重复计算负荷300kVA。接于PC和MCC的电负荷资料及厂用电接线见图5。 已知接于保安段的最大电动机额定功率为55kW，其启动电流倍数为7，则柴油发电机的额定容量至少为（）。",[251,253,255,257],{"key":20,"text":252,"correct":22},"565kVA；",{"key":24,"text":254,"correct":22},"581.5kVA；",{"key":27,"text":256,"correct":29},"668.2kVA；",{"key":31,"text":258,"correct":22},"868.2kVA?",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":20,"analysis":33},1023632,"某300MW机组火力发电工程，主厂房设两台工作变压器，容量互为备用，设一段电动机控制中心（MC C）,变压器中性点直接接地?选择柴油发电机组时，事故保安A段计算负荷为435kVA,B段计算负荷为430kV A，重复计算负荷300kVA。接于PC和MCC的电负荷资料及厂用电接线见图5。 选择低压工作变容量时，其计算负荷应为（）。",[263,265,267,269],{"key":20,"text":264,"correct":29},"655.375kVA；",{"key":24,"text":266,"correct":22},"731.25kVA；",{"key":27,"text":268,"correct":22},"762.75kVA；",{"key":31,"text":270,"correct":22},"632.75kVA。",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":20,"analysis":33},1023633,"某300MW机组火力发电工程，主厂房设两台工作变压器，容量互为备用，设一段电动机控制中心（MC C）,变压器中性点直接接地?选择柴油发电机组时，事故保安A段计算负荷为435kVA,B段计算负荷为430kV A，重复计算负荷300kVA。接于PC和MCC的电负荷资料及厂用电接线见图5。 本案例中低压工作变型式和绕组接线应选择（）。",[275,277,279,281],{"key":20,"text":276,"correct":29},"干式，Dynll接线；",{"key":24,"text":278,"correct":22},"油浸式，Dynll接线；",{"key":27,"text":280,"correct":22},"干式，YynO接线；",{"key":31,"text":282,"correct":22},"油浸式，YynO接线。",{"id":284,"libraryId":5,"type":15,"typeLabel":16,"stem":285,"options":286,"answer":31,"analysis":33},1023634,"某300MW机组火力发电工程，主厂房设两台工作变压器，容量互为备用，设一段电动机控制中心（MC C）,变压器中性点直接接地?选择柴油发电机组时，事故保安A段计算负荷为435kVA,B段计算负荷为430kV A，重复计算负荷300kVA。接于PC和MCC的电负荷资料及厂用电接线见图5。 假定本案例中低压工作变容量为1000kVA。排水泵电动机回路接于MC C，选用塑壳断路器作为保护设备，电缆采用铝芯3X6mm截面，长度50m。已知MCC盘母线三相短路电流11kA,单相短路电流4.5kA；电动机出口三相短路电流0.99k A，单相短路电流0.5kA。排水系电动机回路不另装设继电保护，则过电流脱扣器的整定电流为（）。",[287,289,291,293],{"key":20,"text":288,"correct":22},"7300A；",{"key":24,"text":290,"correct":22},"660A；",{"key":27,"text":292,"correct":22},"3000A；",{"key":31,"text":294,"correct":29},"300A。",{"id":296,"libraryId":5,"type":15,"typeLabel":16,"stem":297,"options":298,"answer":31,"analysis":33},1023635,"某电厂新建4X300MW国产亚临界燃煤发电机组，以500kV升高电压接入系统，500kV出线2回，500kV出线及母线均不装设高压并联电抗器。4台机组连续建设，均采用发电机一变压器组单元接线接人厂内5OOkV每线，该电厂是区域性主力电源，在系统中具有十分重要的地位。取基准容量Sj=1OOMVA,500kV系统正、负序电抗为0.006,零序阻抗为0.013；主变压器370MVA,Ud=14%,零序阻抗105.1Ω；发电机额定功率3OOMW，最大连续功率33OMW,直轴超瞬变电抗（饱和值）X\"d=16%,负序电抗（饱和值）X2=17.18%，零序电抗（饱和值）X0=7.3%，cosφ=0.85,出口电压为20kV。主保护动作时间加相应断路器开断时间为0.1s,后备保护动作时间加相应断路器开断时间为1s。 本厂5OOkV配电装置的电气接线应选择（）。",[299,301,303,305],{"key":20,"text":300,"correct":22},"双母线接线；",{"key":24,"text":302,"correct":22},"双母线单分段接线；",{"key":27,"text":304,"correct":22},"双母线双分段接线；",{"key":31,"text":306,"correct":29},"—个半断路器接线。",{"id":308,"libraryId":5,"type":15,"typeLabel":16,"stem":309,"options":310,"answer":20,"analysis":33},1023636,"某电厂新建4X300MW国产亚临界燃煤发电机组，以500kV升高电压接入系统，500kV出线2回，500kV出线及母线均不装设高压并联电抗器。4台机组连续建设，均采用发电机一变压器组单元接线接人厂内5OOkV每线，该电厂是区域性主力电源，在系统中具有十分重要的地位。取基准容量Sj=1OOMVA,500kV系统正、负序电抗为0.006,零序阻抗为0.013；主变压器370MVA,Ud=14%,零序阻抗105.1Ω；发电机额定功率3OOMW，最大连续功率33OMW,直轴超瞬变电抗（饱和值）X\"d=16%,负序电抗（饱和值）X2=17.18%，零序电抗（饱和值）X0=7.3%，cosφ=0.85,出口电压为20kV。主保护动作时间加相应断路器开断时间为0.1s,后备保护动作时间加相应断路器开断时间为1s。 试拟定本厂高压厂用电系统接线方式为（）。",[311,313,315,317],{"key":20,"text":312,"correct":29},"每炉设两段6kV高压工作母线，由一台分裂变压器供电；",{"key":24,"text":314,"correct":22},"每炉设两段6kV高压工作母线，由两台双绕组变压器供电；",{"key":27,"text":316,"correct":22},"每炉设两段6kV高压工作母线，由一台双绕组变压器供电；",{"key":31,"text":318,"correct":22},"每炉设四段6kV高压工作母线，由两台分裂变压器供电。",{"id":320,"libraryId":5,"type":15,"typeLabel":16,"stem":321,"options":322,"answer":24,"analysis":33},1023637,"某电厂新建4X300MW国产亚临界燃煤发电机组，以500kV升高电压接入系统，500kV出线2回，500kV出线及母线均不装设高压并联电抗器。4台机组连续建设，均采用发电机一变压器组单元接线接人厂内5OOkV每线，该电厂是区域性主力电源，在系统中具有十分重要的地位。取基准容量Sj=1OOMVA,500kV系统正、负序电抗为0.006,零序阻抗为0.013；主变压器370MVA,Ud=14%,零序阻抗105.1Ω；发电机额定功率3OOMW，最大连续功率33OMW,直轴超瞬变电抗（饱和值）X\"d=16%,负序电抗（饱和值）X2=17.18%，零序电抗（饱和值）X0=7.3%，cosφ=0.85,出口电压为20kV。主保护动作时间加相应断路器开断时间为0.1s,后备保护动作时间加相应断路器开断时间为1s。 根据每台机的计算电抗X js査运算曲线，可知每台机的短路电流标么值为3.8，试计算5OOkV母线的三相短路电流周期分量的起始有效值为（）。",[323,325,327,329],{"key":20,"text":324,"correct":22},"24.82kA；",{"key":24,"text":326,"correct":29},"24.23kA；",{"key":27,"text":328,"correct":22},"24.53kA；",{"key":31,"text":330,"correct":22},"23.97kA。",{"id":332,"libraryId":5,"type":15,"typeLabel":16,"stem":333,"options":334,"answer":24,"analysis":33},1023638,"某电厂新建4X300MW国产亚临界燃煤发电机组，以500kV升高电压接入系统，500kV出线2回，500kV出线及母线均不装设高压并联电抗器。4台机组连续建设，均采用发电机一变压器组单元接线接人厂内5OOkV每线，该电厂是区域性主力电源，在系统中具有十分重要的地位。取基准容量Sj=1OOMVA,500kV系统正、负序电抗为0.006,零序阻抗为0.013；主变压器370MVA,Ud=14%,零序阻抗105.1Ω；发电机额定功率3OOMW，最大连续功率33OMW,直轴超瞬变电抗（饱和值）X\"d=16%,负序电抗（饱和值）X2=17.18%，零序电抗（饱和值）X0=7.3%，cosφ=0.85,出口电压为20kV。主保护动作时间加相应断路器开断时间为0.1s,后备保护动作时间加相应断路器开断时间为1s。 试计算500kV母线单相短路电流起始有效值为（）。",[335,337,339,341],{"key":20,"text":336,"correct":22},"8.46kA；",{"key":24,"text":338,"correct":29},"25.38kA；",{"key":27,"text":340,"correct":22},"7.33kA；",{"key":31,"text":342,"correct":22},"21.99kA。",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":20,"analysis":33},1023639,"某电厂新建4X300MW国产亚临界燃煤发电机组，以500kV升高电压接入系统，500kV出线2回，500kV出线及母线均不装设高压并联电抗器。4台机组连续建设，均采用发电机一变压器组单元接线接人厂内5OOkV每线，该电厂是区域性主力电源，在系统中具有十分重要的地位。取基准容量Sj=1OOMVA,500kV系统正、负序电抗为0.006,零序阻抗为0.013；主变压器370MVA,Ud=14%,零序阻抗105.1Ω；发电机额定功率3OOMW，最大连续功率33OMW,直轴超瞬变电抗（饱和值）X\"d=16%,负序电抗（饱和值）X2=17.18%，零序电抗（饱和值）X0=7.3%，cosφ=0.85,出口电压为20kV。主保护动作时间加相应断路器开断时间为0.1s,后备保护动作时间加相应断路器开断时间为1s。 已知发电机出口三相短路电流周期分量有效值为138.82k A，1号发电机高压厂用变压器容量为50\u002F27—27MV A，半穿越阻抗Ud1-2=19%（以一次绕组的容量为基准），6kV母线IA段上高压电动机总功率为19265kW，I类低压电动机总功率为2837kW,试计算6kV母线IA段上三相短路电流周期分量起始有效值为（）。",[347,349,351,353],{"key":20,"text":348,"correct":29},"39.13kA；",{"key":24,"text":350,"correct":22},"41.18kA；",{"key":27,"text":352,"correct":22},"37.97kA；",{"key":31,"text":354,"correct":22},"39.85kA。",{"id":356,"libraryId":5,"type":15,"typeLabel":16,"stem":357,"options":358,"answer":27,"analysis":33},1023640,"某电厂新建4X300MW国产亚临界燃煤发电机组，以500kV升高电压接入系统，500kV出线2回，500kV出线及母线均不装设高压并联电抗器。4台机组连续建设，均采用发电机一变压器组单元接线接入厂内5OOkV每线，该电厂是区域性主力电源，在系统中具有十分重要的地位。取基准容量Sj=1OOMVA,500kV系统正、负序电抗为0.006,零序阻抗为0.013；主变压器370MVA,Ud=14%,零序阻抗105.1Ω；发电机额定功率3OOMW，最大连续功率33OMW,直轴超瞬变电抗（饱和值）X\"d=16%,负序电抗（饱和值）X2=17.18%，零序电抗（饱和值）X0=7.3%，cosφ=0.85,出口电压为20kV。主保护动作时间加相应断路器开断时间为0.1s,后备保护动作时间加相应断路器开断时间为1s。 已知短路电流热效应计算时间取Is时，短路电流热效应Qt0.1=68.24kA2?S,t=1s时，Qt1=440.92kA2?S,假定500kV母线三相短路电流周期分量起始有效值为24.32kA,单相短路电流值为25.40kA。请在下列数据中选择一组作为500kV断路器选择的技术条件（）。",[359,361,363,365],{"key":20,"text":360,"correct":22},"1s热稳定电流 20.10kA,額定开断电流 24.32kA；",{"key":24,"text":362,"correct":22},"1s热稳定电流 20.10kA,额定开断电流 25.40kA；",{"key":27,"text":364,"correct":29},"2s热稳定电流 14.85kA,額定开断电流 24.32kA；",{"key":31,"text":366,"correct":22},"2s热稳定电流 14.85kA,额定开断电流 25.40kA。",{"id":368,"libraryId":5,"type":15,"typeLabel":16,"stem":369,"options":370,"answer":27,"analysis":33},1023641,"某市电力调度楼需设置一套火灾自动报警系统。请确定： 该调度楼控制室为（）火灾自动报警系统保护对象。",[371,373,375,377],{"key":20,"text":372,"correct":22},"特级；",{"key":24,"text":374,"correct":22},"—级；",{"key":27,"text":376,"correct":29},"二级；",{"key":31,"text":378,"correct":22},"都不是。",{"id":380,"libraryId":5,"type":15,"typeLabel":16,"stem":381,"options":382,"answer":20,"analysis":33},1023642,"某市电力调度楼需设置一套火灾自动报警系统。请确定： 该控制室应选择 （）火灾探测器。",[383,385,387,389],{"key":20,"text":384,"correct":29},"感烟探测器；",{"key":24,"text":386,"correct":22},"火焰探测器；",{"key":27,"text":388,"correct":22},"感温探測器；",{"key":31,"text":390,"correct":22},"可燃气体探测器。",{"id":392,"libraryId":5,"type":15,"typeLabel":16,"stem":393,"options":394,"answer":24,"analysis":33},1023643,"某市电力调度楼需设置一套火灾自动报警系统。请确定： 如控制室面积为8X1Om2,房间高度5m,屋顶平吊顶，室内应布置火灾探测器的数量为（）。",[395,397,399,401],{"key":20,"text":396,"correct":22},"3；",{"key":24,"text":398,"correct":29},"4；",{"key":27,"text":400,"correct":22},"5；",{"key":31,"text":402,"correct":22},"6。",{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":27,"analysis":33},1023644,"某市电力调度楼需设置一套火灾自动报警系统。请确定： 在控制室所在楼层应设置一个手动火灾报警按钮，此报警按钮安装于墙上，其底边距地面髙度宜为（）。",[407,409,411,413],{"key":20,"text":408,"correct":22},"1m；",{"key":24,"text":410,"correct":22},"1.2m；",{"key":27,"text":412,"correct":29},"1.4m；",{"key":31,"text":414,"correct":22},"1.6m。",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":27,"analysis":33},1023645,"某市电力调度楼需设置一套火灾自动报警系统。请确定： 在控制室所在楼层应设置一个火灾报警装置，其位置宜设置在（）。",[419,421,423,425],{"key":20,"text":420,"correct":22},"控制室内；",{"key":24,"text":422,"correct":22},"控制室门外；",{"key":27,"text":424,"correct":29},"楼层走道靠近楼梯出口处；",{"key":31,"text":426,"correct":22},"楼层走道中间位里。",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":24,"analysis":33},1023646,"已知最大接地短路电流（500kV主母线单相接地短路）：Imax=26.58kA （参数同25题），假定短路时4台主变压器中性点均接地运行，短路的等效持续时间为0.6s。Ke1、Ke2分别为厂内和厂外短路时，避雷线的工频分流系数，分别取值为0.5和0.1。 试计算入地短路电流为（）。",[431,433,435,437],{"key":20,"text":432,"correct":22},"10.10kA；",{"key":24,"text":434,"correct":29},"13.82kA；",{"key":27,"text":436,"correct":22},"10.73kA；",{"key":31,"text":438,"correct":22},"11.42kA。",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":27,"analysis":33},1023647,"已知最大接地短路电流（500kV主母线单相接地短路）：Imax=26.58kA （参数同25题），假定短路时4台主变压器中性点均接地运行，短路的等效持续时间为0.6s。Ke1、Ke2分别为厂内和厂外短路时，避雷线的工频分流系数，分别取值为0.5和0.1。 假定接地线采用热浸镀锌扁钢，试计算热稳定要求的接地线最小截面为（）。",[443,445,447,449],{"key":20,"text":444,"correct":22},"98.04mm2；",{"key":24,"text":446,"correct":22},"118.73mm2；",{"key":27,"text":448,"correct":29},"152.93mm2；",{"key":31,"text":450,"correct":22},"294.13mm2。",{"id":452,"libraryId":5,"type":15,"typeLabel":16,"stem":453,"options":454,"answer":31,"analysis":33},1023648,"已知最大接地短路电流（500kV主母线单相接地短路）：Imax=26.58kA （参数同25题），假定短路时4台主变压器中性点均接地运行，短路的等效持续时间为0.6s。Ke1、Ke2分别为厂内和厂外短路时，避雷线的工频分流系数，分别取值为0.5和0.1。 已知土壤电阻率ρ=15OΩ?m,接地网总面积S=250000m2，假定接地网采用60X6镀锌扁钢、按1OmX1Om方孔铺设，均压带计算根数n=50，埋深h=8m，接地装置的接地电阻R=0.12Ω,通过计算确定接地网内接触电位差是（）。",[455,457,459,461],{"key":20,"text":456,"correct":22},"181.8V,满足要求；",{"key":24,"text":458,"correct":22},"193.14V,满足要求；",{"key":27,"text":460,"correct":22},"205.56V,满足要求；",{"key":31,"text":462,"correct":29},"248.76V,满足要求。",{"id":464,"libraryId":5,"type":15,"typeLabel":16,"stem":465,"options":466,"answer":27,"analysis":33},1023649,"某电厂新建两台135MW燃煤发电机组，电厂以220kV电压接入系统，出线2回,预留1回。两台机组均采用发电机一变压器组单元接线接入厂内220kV母线。发电机引出线及厂用分支线采用分相封闭母线。 初步拟定的电气主接线如图6所示，请指出图中存在的问题（）。",[467,469,471,473],{"key":20,"text":468,"correct":22},"不宜设置专用旁路断路器；220kV母线避雷器不应装设隔离开关，厂用分支戏不应装设隔离开关；",{"key":24,"text":470,"correct":22},"不宜设置专用旁路断路器；220kV母线避雷器不应装设隔离开关，厂用分支线不应装设隔离开关；",{"key":27,"text":472,"correct":29},"不宜设置旁路母线；母线避雷器和母线电压互感器宜合用一杻隱离开关，出线电压互感器不应装设隔离开关；厂用分支线不应装设隔离开关；变压器220kV侧中性点应装设间隙；",{"key":31,"text":474,"correct":22},"不宜设至旁路母线，母钱避雷器和母线电压互感器宜合用一組隔离开关，厂用分支线不应装设隔离开关，变压器220kV侧中性点不应装设隔离开关。",{"id":476,"libraryId":5,"type":15,"typeLabel":16,"stem":477,"options":478,"answer":20,"analysis":33},1023650,"某电厂新建两台135MW燃煤发电机组，电厂以220kV电压接入系统，出线2回,预留1回。两台机组均采用发电机一变压器组单元接线接入厂内220kV母线。发电机引出线及厂用分支线采用分相封闭母线。 厂用电接线如图7所示，高压电动机负荷引接见表4，已知高压厂用变压器引接点短路容量为2210MV A，髙厂变阻抗为Ud=1O.5%,电动机反馈电流倍数取5.5，试计算髙压厂用变压器供电时IA段6kV母线三相短路电流周期分量起始有效值为（）。",[479,481,483,485],{"key":20,"text":480,"correct":29},"24.10kA；",{"key":24,"text":482,"correct":22},"23.93kA；",{"key":27,"text":484,"correct":22},"27.27kA；",{"key":31,"text":486,"correct":22},"23.80kA。",{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":20,"analysis":33},1023652,"某电厂新建两台135MW燃煤发电机组，电厂以220kV电压接入系统，出线2回,预留1回。两台机组均采用发电机一变压器组单元接线接入厂内220kV母线。发电机引出线及厂用分支线采用分相封闭母线。 已知IA段计算负荷为13520kVA,IB段计算负荷13160kV A，其中重复容量为8177kVA。电动给水泵电机效率为η=90%，cosφ=O.963,启动电流倍数为6.5，试计算髙压厂用变压器供电时给水泵电动机正常启动时的母线电压（标么值）为（）。",[491,493,495,497],{"key":20,"text":492,"correct":29},"0.856；",{"key":24,"text":494,"correct":22},"0.863；",{"key":27,"text":496,"correct":22},"0.869；",{"key":31,"text":498,"correct":22},"0.874.",{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":20,"analysis":33},1023653,"某电厂新建两台135MW燃煤发电机组，电厂以220kV电压接入系统，出线2回,预留1回。两台机组均采用发电机一变压器组单元接线接入厂内220kV母线。发电机引出线及厂用分支线采用分相封闭母线。 已知发电机额定功率Pe =135MW，cosφ=0.85。根据高压电动机容量表（其中II A、IIB段上无8~11项），假定给水泵电动机换算系数取1,其余电动机换算系数取0.8，试计算全厂高压电动机部分厂用电率为（）。",[503,505,507,509],{"key":20,"text":504,"correct":29},"6.44%；",{"key":24,"text":506,"correct":22},"6.50%；",{"key":27,"text":508,"correct":22},"6.84%；",{"key":31,"text":510,"correct":22},"7.12%。",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":27,"analysis":33},1023654,"某电厂新建两台135MW燃煤发电机组，电厂以220kV电压接入系统，出线2回,预留1回。两台机组均采用发电机一变压器组单元接线接入厂内220kV母线。发电机引出线及厂用分支线采用分相封闭母线。 —台卸酸泵电动机功率为3kW，由锅炉补给水处理PC通过工业废水处理MCC供电，如图8所示。已知锅炉补给水处理变压器2500kV A，阻抗Ud=10%，电阻R=0.38mΩ,电抗X=3.84mΩ，接于PC盘上的电动机总功率为581kW，接于MCC盘上电动机总功率为140kW（不含卸酸泵），电缆参数见图上标注。变压器采用干式，与PC盘并列布置。假定忽略PC及MCC盘内母排及元件的电阻和电抗，试计算卸酸泵电动机出口三相短路电流为（）。",[515,517,519,521],{"key":20,"text":516,"correct":22},"440A；",{"key":24,"text":518,"correct":22},"468A；",{"key":27,"text":520,"correct":29},"518A；",{"key":31,"text":522,"correct":22},"1330A。",{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":31,"analysis":33},1023655,"某电厂新建两台135MW燃煤发电机组，电厂以220kV电压接入系统，出线2回,预留1回。两台机组均采用发电机一变压器组单元接线接入厂内220kV母线。发电机引出线及厂用分支线采用分相封闭母线。 已知启动\u002F备用变供电时IA段6kV母线三相短路电流周期分量起始有效值中，变压器提供的部分为18.5k A，电动机反馈的部分为9.57kA。假定6kV电缆选用铝芯，热稳定系数C值取82,短路切除时间15S,试计算6kV馈线回路电缆最小热稳定截面为（）。",[527,529,531,533],{"key":20,"text":528,"correct":22},"87mm2；",{"key":24,"text":530,"correct":22},"103mm2；",{"key":27,"text":532,"correct":22},"130mm2；",{"key":31,"text":534,"correct":29},"134mm2。",{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":24,"analysis":33},1023656,"某电厂新建两台135MW燃煤发电机组，电厂以220kV电压接入系统，出线2回,预留1回。两台机组均采用发电机一变压器组单元接线接入厂内220kV母线。发电机引出线及厂用分支线采用分相封闭母线。 已知220kV升压站位于I级污秽地区，户外电瓷绝缘的爬电比距γ=1.6cm\u002FkV,断路器瓷件的平均直径为320mm，试计算断路器瓷件的对地爬电距离L1及同极断口间灭弧室瓷套爬电距离L2分别为（）。",[539,541,543,545],{"key":20,"text":540,"correct":22},"L1=352，L2=404.8cm；",{"key":24,"text":542,"correct":29},"L1=256.07cm,L2=294.48cm；",{"key":27,"text":544,"correct":22},"L1=404.8cm,L2=445.28cm；",{"key":31,"text":546,"correct":22},"L1=443.52cm,L2=51O.05cm。",{"id":548,"libraryId":5,"type":15,"typeLabel":16,"stem":549,"options":550,"answer":27,"analysis":33},1023657,"某电厂新建两台135MW燃煤发电机组，电厂以220kV电压接入系统，出线2回,预留1回。两台机组均采用发电机一变压器组单元接线接入厂内220kV母线。发电机引出线及厂用分支线采用分相封闭母线。 已知220kV母线单相短路电流16.25k A，发生单相接地短路时，流往发电厂接地中性点的接地短路电流为12.05kA,入地短路电流10.85k A，接地材料的热稳定系数C=70,短路等效持续时间te=0.65s，现按热稳定条件分别计算出接地线的最小截面值（）。",[551,553,555,557],{"key":20,"text":552,"correct":22},"187.16mm2；",{"key":24,"text":554,"correct":22},"138.79mm2；",{"key":27,"text":556,"correct":29},"124.96mm2；",{"key":31,"text":558,"correct":22},"219.20mm2。",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":24,"analysis":33},1023658,"某火力发电厂380V低压厂用电系统为中性点直接接地，采用动力中心（P C）和电动机控制中心（MC C）供电方式。电动机控制中心接有如下负荷：①经常连续负荷102kW。其中一般负荷最大10kW,总容量20kW；电动机负荷82kW，最大电动机额定容量为18kW；②经常短时负荷10kW,为电动机负荷；③不经常短时负荷15kW，为电动机负荷。 动力中心馈电干线和电动机控制中心负荷采用NT型熔断器作保护时，选择电动机控制中心最大电动机回路溶断器熔件额定电流（电动机功率因数取0.8，额定电流取额定功率的2倍，启动电流倍数取6）为（）。",[563,565,567,569],{"key":20,"text":564,"correct":22},"60A；",{"key":24,"text":566,"correct":29},"80A；",{"key":27,"text":568,"correct":22},"100A；",{"key":31,"text":570,"correct":22},"120A。",{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":27,"analysis":33},1023659,"某火力发电厂380V低压厂用电系统为中性点直接接地，采用动力中心（P C）和电动机控制中心（MC C）供电方式。电动机控制中心接有如下负荷：①经常连续负荷102kW。其中一般负荷最大10kW,总容量20kW；电动机负荷82kW，最大电动机额定容量为18kW；②经常短时负荷10kW,为电动机负荷；③不经常短时负荷15kW，为电动机负荷。 条件同（1）题，选择向该电动机控制中心供电的动力中心（不考虑成组自启动）馈电干线熔断器熔件额定电流（）。",[575,577,579,581],{"key":20,"text":576,"correct":22},"180A；",{"key":24,"text":578,"correct":22},"200A；",{"key":27,"text":580,"correct":29},"250A；",{"key":31,"text":294,"correct":22},{"id":583,"libraryId":5,"type":15,"typeLabel":16,"stem":584,"options":585,"answer":31,"analysis":33},1023660,"某火力发电厂380V低压厂用电系统为中性点直接接地，采用动力中心（P C）和电动机控制中心（MC C）供电方式。电动机控制中心接有如下负荷：①经常连续负荷102kW。其中一般负荷最大10kW,总容量20kW；电动机负荷82kW，最大电动机额定容量为18kW；②经常短时负荷10kW,为电动机负荷；③不经常短时负荷15kW，为电动机负荷。 动力中心馈电干线和电动机控制中心负荷采用断路器脱扣器作保护，选择电动机控制中心最大电动机回路断路器短路脱扣器整定电流（电动机功率因数取0.8，额定电流取额定功率的2倍，启动电流倍数取6，电动机机端最小短路电流为760A,断路器动作时间不大于0.02s）为（）。",[586,587,588,590],{"key":20,"text":576,"correct":22},{"key":24,"text":578,"correct":22},{"key":27,"text":589,"correct":22},"800A；",{"key":31,"text":294,"correct":29},{"id":592,"libraryId":5,"type":15,"typeLabel":16,"stem":593,"options":594,"answer":24,"analysis":33},1023661,"某火力发电厂380V低压厂用电系统为中性点直接接地，采用动力中心（P C）和电动机控制中心（MC C）供电方式。电动机控制中心接有如下负荷：①经常连续负荷102kW。其中一般负荷最大10kW,总容量20kW；电动机负荷82kW，最大电动机额定容量为18kW；②经常短时负荷10kW,为电动机负荷；③不经常短时负荷15kW，为电动机负荷。 条件同（1）题，确定向该电动机控制中心供电的动力中心（不考虑接地保护）馈电干线断路器脱扣器和整定电流为（ ）。",[595,597,599,601],{"key":20,"text":596,"correct":22},"300A；",{"key":24,"text":598,"correct":29},"400A；",{"key":27,"text":600,"correct":22},"600A；",{"key":31,"text":602,"correct":22},"800A。",{"id":604,"libraryId":5,"type":15,"typeLabel":16,"stem":605,"options":606,"answer":24,"analysis":33},1023662,"某2X300MW火力发电厂厂用电系统采用6kV和380V两级电压，其中每台机组设 A、B两段6kV工作段，全厂设01 A、OlB两段6kV公用段，考虑公用段工作电源取自1、2号机组6kV工作段，备用电源取自启动\u002F备用变压器。见示意图9。每台机组设一台电动给水泵，都接于机组6kV工作A段，髙压厂用分裂变压器容量为：40\u002F25—25MVA（无载调压）。 若发电机额定电压为20kV，高压厂用变压器高压侧短路容量计算值为4780MVA,6kV系统短路时，假定电动机反馈电流有效值为12.6kA。要求高压厂用电系统采用轻型电气设备（4Ok A）,则变压器阻抗电压（％）的最小值为（）。",[607,609,611,613],{"key":20,"text":608,"correct":22},"15%,",{"key":24,"text":610,"correct":29},"16%；",{"key":27,"text":612,"correct":22},"17%,",{"key":31,"text":614,"correct":22},"18%。",[616,619,622,625,628,631],{"id":15,"name":617,"category":7,"favorite":618},"领导干部任职前廉政法规知识测试题",92,{"id":620,"name":621,"category":7,"favorite":15},595,"建筑结构与设备",{"id":623,"name":624,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":626,"name":627,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":629,"name":630,"category":7,"favorite":8},534,"BIM工程师",{"id":632,"name":630,"category":7,"favorite":8},535]