[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-751-37":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":610},{"id":5,"name":6,"category":7,"favorite":8},751,"电气工程师发输变电专业","建筑工程",0,37,50,2670,[13,34,46,57,69,81,93,105,117,129,141,152,164,176,188,200,212,224,233,245,257,269,281,292,304,314,326,338,350,362,374,386,398,410,422,434,446,458,470,482,494,506,518,530,539,550,562,574,586,598],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1023561,1,"单选题","某220kV变电站位于III级污区，装设180MVA主变压器2台，220kV母线短路电流为12kA；220kV出线6回，全部为负荷线，其中最大输送容量为150MVA；如果220kV出线电流互感器的瓷套平均直径为450mm，试回答以下各题。 采用双母线时，220kV母联回路工作电流为（）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","300A；",false,{"key":24,"text":25,"correct":26},"B","500A；",true,{"key":28,"text":29,"correct":22},"C","700A；",{"key":31,"text":32,"correct":22},"D","800A。","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1023562,"某220kV变电站位于III级污区，装设180MVA主变压器2台，220kV母线短路电流为12kA；220kV出线6回，全部为负荷线，其中最大输送容量为150MVA；如果220kV出线电流互感器的瓷套平均直径为450mm，试回答以下各题。 220kV较为合理的接线方式为（）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"双母线单分段；",{"key":24,"text":41,"correct":26},"双母线接线；",{"key":28,"text":43,"correct":22},"一个半断路器接线；",{"key":31,"text":45,"correct":22},"单母线分段接线。",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1023563,"某500kV开关站，地处边远山区，1OOkm之内无电源，按规划初期出线2回（均装设有髙压电抗器），逐步发展到最终6回出线，试回答下列各题。 本站比较合理的电气主接线型式为（）。",[50,51,53,55],{"key":20,"text":43,"correct":26},{"key":24,"text":52,"correct":22},"双母线双分段接线；",{"key":28,"text":54,"correct":22},"双断路器接线；",{"key":31,"text":56,"correct":22},"1(1\u002F3)断路器接线。",{"id":58,"libraryId":5,"type":15,"typeLabel":16,"stem":59,"options":60,"answer":28,"analysis":33},1023564,"某500kV开关站，地处边远山区，1OOkm之内无电源，按规划初期出线2回（均装设有髙压电抗器），逐步发展到最终6回出线，试回答下列各题。 最终规模时6回出线中有3回电源线，3回负荷线，当采用1（1\u002F2）断路器接线时的配串原则是（）。",[61,63,65,67],{"key":20,"text":62,"correct":22},"无所谓可以任意组合；",{"key":24,"text":64,"correct":22},"按工程建设的先后次序组合配串；",{"key":28,"text":66,"correct":26},"电源线与负荷线组合配成串；",{"key":31,"text":68,"correct":22},"电源线与电源线*负荷线与负荷线组合配串。",{"id":70,"libraryId":5,"type":15,"typeLabel":16,"stem":71,"options":72,"answer":24,"analysis":33},1023565,"某500kV开关站，地处边远山区，1OOkm之内无电源，按规划初期出线2回（均装设有髙压电抗器），逐步发展到最终6回出线，试回答下列各题。 根据开关站电源条件，试选择较为合理的站用电供电方案（）。",[73,75,77,79],{"key":20,"text":74,"correct":22},"装设特殊的小容量越级变压器，由500kV直接降压为0.4kV；",{"key":24,"text":76,"correct":26},"高压电抗器抽能方式；",{"key":28,"text":78,"correct":22},"修建自备发电厂；",{"key":31,"text":80,"correct":22},"从1OOkm外引接电源，",{"id":82,"libraryId":5,"type":15,"typeLabel":16,"stem":83,"options":84,"answer":28,"analysis":33},1023566,"某500kV开关站，地处边远山区，1OOkm之内无电源，按规划初期出线2回（均装设有髙压电抗器），逐步发展到最终6回出线，试回答下列各题。 5回出线时，装设（）断路器比较合理。",[85,87,89,91],{"key":20,"text":86,"correct":22},"6台；",{"key":24,"text":88,"correct":22},"7台；",{"key":28,"text":90,"correct":26},"8台；",{"key":31,"text":92,"correct":22},"9台。",{"id":94,"libraryId":5,"type":15,"typeLabel":16,"stem":95,"options":96,"answer":31,"analysis":33},1023567,"某220kV变电站，站址海拔高度为1424m，多年平均大气压力为85.5kPa，多年平均气温15.8℃，绝对湿度为10.656g\u002Fmm3，空气相对密度为0.857；选用的避雷器参数为：10kA残压520kV,操作冲击电流下残压478kV。试计算以下各题： 计算确定工频电压下相一地空气间隙海拔修正系数K值为（）。",[97,99,101,103],{"key":20,"text":98,"correct":22},"相一地K=1.143；",{"key":24,"text":100,"correct":22},"相一地K=1.153；",{"key":28,"text":102,"correct":22},"相一地K=1.135；",{"key":31,"text":104,"correct":26},"相一地K=1.154。",{"id":106,"libraryId":5,"type":15,"typeLabel":16,"stem":107,"options":108,"answer":31,"analysis":33},1023568,"某220kV变电站，站址海拔高度为1424m，多年平均大气压力为85.5kPa，多年平均气温15.8℃，绝对湿度为10.656g\u002Fmm3，空气相对密度为0.857；选用的避雷器参数为：10kA残压520kV,操作冲击电流下残压478kV。试计算以下各题： 计算确定工频电压下相一相空气间隙海拔修正系数K值为（）。",[109,111,113,115],{"key":20,"text":110,"correct":22},"相一相K=1.122；",{"key":24,"text":112,"correct":22},"相一相K=1.134；",{"key":28,"text":114,"correct":22},"相一相K=I.134；",{"key":31,"text":116,"correct":26},"相一相K=1.149。",{"id":118,"libraryId":5,"type":15,"typeLabel":16,"stem":119,"options":120,"answer":28,"analysis":33},1023569,"某220kV变电站，站址海拔高度为1424m，多年平均大气压力为85.5kPa，多年平均气温15.8℃，绝对湿度为10.656g\u002Fmm3，空气相对密度为0.857；选用的避雷器参数为：10kA残压520kV,操作冲击电流下残压478kV。试计算以下各题： 计算确定雷电冲击电压下相一地空气间隙海拔修正系数为（）。",[121,123,125,127],{"key":20,"text":122,"correct":22},"K=1.15；",{"key":24,"text":124,"correct":22},"K=1.14；",{"key":28,"text":126,"correct":26},"K=1.17；",{"key":31,"text":128,"correct":22},"K=1.11。",{"id":130,"libraryId":5,"type":15,"typeLabel":16,"stem":131,"options":132,"answer":31,"analysis":33},1023570,"某220kV变电站，站址海拔高度为1424m，多年平均大气压力为85.5kPa，多年平均气温15.8℃，绝对湿度为10.656g\u002Fmm3，空气相对密度为0.857；选用的避雷器参数为：10kA残压520kV,操作冲击电流下残压478kV。试计算以下各题： 计算确定操作冲击电压下相一地空气间隙海拔修正系数K （）。",[133,135,137,139],{"key":20,"text":134,"correct":22},"相一地K=1.151；",{"key":24,"text":136,"correct":22},"相一地K=1.124；",{"key":28,"text":138,"correct":22},"相一地K=1.147；",{"key":31,"text":140,"correct":26},"相一地K=1.153。",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":31,"analysis":33},1023571,"某220kV变电站，站址海拔高度为1424m，多年平均大气压力为85.5kPa，多年平均气温15.8℃，绝对湿度为10.656g\u002Fmm3，空气相对密度为0.857；选用的避雷器参数为：10kA残压520kV,操作冲击电流下残压478kV。试计算以下各题： 计算确定操作冲击电压下相一相空气间隙海拔修正系数K （）。",[145,147,148,150],{"key":20,"text":146,"correct":22},"相一相K=1.132；",{"key":24,"text":146,"correct":22},{"key":28,"text":149,"correct":22},"相一相K=1.137；",{"key":31,"text":151,"correct":26},"相一相K=1.144。",{"id":153,"libraryId":5,"type":15,"typeLabel":16,"stem":154,"options":155,"answer":24,"analysis":33},1023572,"某220kV变电站，站址海拔高度为1424m，多年平均大气压力为85.5kPa，多年平均气温15.8℃，绝对湿度为10.656g\u002Fmm3，空气相对密度为0.857；选用的避雷器参数为：10kA残压520kV,操作冲击电流下残压478kV。试计算以下各题： 请根据已有的计算值：相一地雷电冲击电压下海拔修正系数1.17，相一地操作电压下修正系数1.153,相一地工频电压下修正系数为1.154，以及避雷器参数10kA残压520kV，操作冲击电流下残压478kV,并按照《交流电气装置的过电压保护和绝缘配合》（DL\u002FT620—1997）的规定，参照《电力工程电气设计手册》（1）第890页附图计算确定受风偏影响时，确定相一地或值的修正情况为（）?",[156,158,160,162],{"key":20,"text":157,"correct":22},"A1值需修正，工頻过电压起决定作用；",{"key":24,"text":159,"correct":26},"A1值需修正，操作过电压起决定作用；",{"key":28,"text":161,"correct":22},"A1值需修正，雷电过电压起决定作用；",{"key":31,"text":163,"correct":22},"A1值不需修正。",{"id":165,"libraryId":5,"type":15,"typeLabel":16,"stem":166,"options":167,"answer":31,"analysis":33},1023573,"某110kV降压变电站，规划安装两台双绕组主变压器，10kV负荷容量20000kVA,出线14回，110kV出线为2回。110kV配电装置采用SF6断路器，10kV配电装置采用手车式开关柜，10kV负荷均为一级负荷。 该变电所宜采用的接线方式为（).",[168,170,172,174],{"key":20,"text":169,"correct":22},"10kV双母线，110kV单母线；",{"key":24,"text":171,"correct":22},"10kV单母线分段，110kV单母线；",{"key":28,"text":173,"correct":22},"10kV双母线带旁路，110kV桥形接线；",{"key":31,"text":175,"correct":26},"10kV双母线，110kV桥形接线。",{"id":177,"libraryId":5,"type":15,"typeLabel":16,"stem":178,"options":179,"answer":31,"analysis":33},1023574,"某110kV降压变电站，规划安装两台双绕组主变压器，10kV负荷容量20000kVA,出线14回，110kV出线为2回。110kV配电装置采用SF6断路器，10kV配电装置采用手车式开关柜，10kV负荷均为一级负荷。 该变电所主变压器容量至少为（）",[180,182,184,186],{"key":20,"text":181,"correct":22},"14OOOkVA；",{"key":24,"text":183,"correct":22},"16000kVA；",{"key":28,"text":185,"correct":22},"18000kVA；",{"key":31,"text":187,"correct":26},"20000kVA。",{"id":189,"libraryId":5,"type":15,"typeLabel":16,"stem":190,"options":191,"answer":20,"analysis":33},1023575,"某110kV降压变电站，规划安装两台双绕组主变压器，10kV负荷容量20000kVA,出线14回，110kV出线为2回。110kV配电装置采用SF6断路器，10kV配电装置采用手车式开关柜，10kV负荷均为一级负荷。 假定10kV母线（电缆）单相接地故障电流为28. 5 A，则主变压器10k公侧中性点接地方式为（）。",[192,194,196,198],{"key":20,"text":193,"correct":26},"不接地；",{"key":24,"text":195,"correct":22},"消弧线圏接地；",{"key":28,"text":197,"correct":22},"直地；",{"key":31,"text":199,"correct":22},"高电阻接地。",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":20,"analysis":33},1023576,"某110kV降压变电站，规划安装两台双绕组主变压器，10kV负荷容量20000kVA,出线14回，110kV出线为2回。110kV配电装置采用SF6断路器，10kV配电装置采用手车式开关柜，10kV负荷均为一级负荷。 假定10kV母线0秒时三相短路电流33k A，每段10kV母线装设4组电容器，电容器组电抗率采用6%，较适宜的单组电容器容量为（）。",[204,206,208,210],{"key":20,"text":205,"correct":26},"1200kvar；",{"key":24,"text":207,"correct":22},"2400kvar；",{"key":28,"text":209,"correct":22},"3600kvar；",{"key":31,"text":211,"correct":22},"4800kvar。",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":20,"analysis":33},1023577,"某电厂装设4X300MW机组，有220kV及500kV升髙电压，电厂潮流均应向两种高压送电，其中1、2号机组接入220kV母线，3、4号机组接人500kV母线。220kV出线两回，500kV出线一回。 其发电机变压器宜采用的组合为（）。",[216,218,220,222],{"key":20,"text":217,"correct":26},"双绕組变压器、联络变压器；",{"key":24,"text":219,"correct":22},"三绕组变压器、联络变压器；",{"key":28,"text":221,"correct":22},"三绕组自耦变压器、联络变压器；",{"key":31,"text":223,"correct":22},"自耦变压器、联络变压器。",{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":20,"analysis":33},1023578,"某电厂装设4X300MW机组，有220kV及500kV升髙电压，电厂潮流均应向两种高压送电，其中1、2号机组接入220kV母线，3、4号机组接人500kV母线。220kV出线两回，500kV出线一回。 该电厂的启动\u002F备用电源从厂内220kV母线引接，且220kV配电装置采用双母线型式，则220kV断路器需要（）。",[228,229,230,231],{"key":20,"text":86,"correct":26},{"key":24,"text":88,"correct":22},{"key":28,"text":90,"correct":22},{"key":31,"text":232,"correct":22},"9台，",{"id":234,"libraryId":5,"type":15,"typeLabel":16,"stem":235,"options":236,"answer":24,"analysis":33},1023579,"某电厂装设4X300MW机组，有220kV及500kV升髙电压，电厂潮流均应向两种高压送电，其中1、2号机组接入220kV母线，3、4号机组接人500kV母线。220kV出线两回，500kV出线一回。 每台机组总的计算负荷为35500kV A，则髙厂变的型式及台数宜采用（）。",[237,239,241,243],{"key":20,"text":238,"correct":22},"—台双绕组变压器，两段6kV母线；",{"key":24,"text":240,"correct":26},"一台分裂绕组变压器，两段6kV母线；",{"key":28,"text":242,"correct":22},"两台双绕组变压器，两段6kV母线；",{"key":31,"text":244,"correct":22},"两台分裂統组变压器，四段6kV母线，",{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":20,"analysis":33},1023580,"某电厂装设4X300MW机组，有220kV及500kV升髙电压，电厂潮流均应向两种高压送电，其中1、2号机组接入220kV母线，3、4号机组接人500kV母线。220kV出线两回，500kV出线一回。 假定每台机组设二段6kV母线（不设公用段），每台机组设3X50%BMC B.容量电动给水泵，每台给水泵电机5500kW。不包括电动给水泵电机时，每段母线计算负荷16560kVA,则计入给水泵电机后每段6kV母线的计算负荷为（）。",[249,251,253,255],{"key":20,"text":250,"correct":26},"22000kVA；",{"key":24,"text":252,"correct":22},"21175kVA；",{"key":28,"text":254,"correct":22},"25850kVA；",{"key":31,"text":256,"correct":22},"27600kVA。",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":28,"analysis":33},1023581,"某新建2X300MW火力发电厂，每台机组设 A、B两段6kV工作段，全厂设01 A、O1B两段6kV公用段，公用段间设有联络断路器，正常运行时公用段分别由I A、IIA单元段供电。每台机组设一台分裂绕组髙压工作变压器，容量50\u002F27-27MV A，半穿越阻抗U’ dl-2=21%,额定变比20±2X2.5%\u002F6.3—6.3kV。每台机组设一台备用电动给水泵，接于单元B段。发电机出口短路容量为4330MV A，每段6kV母线计算负荷及所接电动机额定功率之和如表3所示。 若电动机平均的反馈电流倍数取6，则高厂变供电时，6kV真空断路器柜较合理的热稳定电流应选择（）。",[261,263,265,267],{"key":20,"text":262,"correct":22},"40kA（2S）；",{"key":24,"text":264,"correct":22},"50kA（2S）；",{"key":28,"text":266,"correct":26},"40kA（4S）；",{"key":31,"text":268,"correct":22},"50kA（4S）。",{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":28,"analysis":33},1023582,"某新建2X300MW火力发电厂，每台机组设 A、B两段6kV工作段，全厂设01 A、O1B两段6kV公用段，公用段间设有联络断路器，正常运行时公用段分别由I A、IIA单元段供电。每台机组设一台分裂绕组髙压工作变压器，容量50\u002F27-27MV A，半穿越阻抗U’ dl-2=21%,额定变比20±2X2.5%\u002F6.3—6.3kV。每台机组设一台备用电动给水泵，接于单元B段。发电机出口短路容量为4330MV A，每段6kV母线计算负荷及所接电动机额定功率之和如表3所示。 高厂变供电时，6kV真空断路器柜较合理的额定关合电流应选择（）。",[273,275,277,279],{"key":20,"text":274,"correct":22},"40kA；",{"key":24,"text":276,"correct":22},"50kA；",{"key":28,"text":278,"correct":26},"1OOkA；",{"key":31,"text":280,"correct":22},"125kA。",{"id":282,"libraryId":5,"type":15,"typeLabel":16,"stem":283,"options":284,"answer":20,"analysis":33},1023583,"某新建2X300MW火力发电厂，每台机组设 A、B两段6kV工作段，全厂设01 A、O1B两段6kV公用段，公用段间设有联络断路器，正常运行时公用段分别由I A、IIA单元段供电。每台机组设一台分裂绕组髙压工作变压器，容量50\u002F27-27MV A，半穿越阻抗U’ dl-2=21%,额定变比20±2X2.5%\u002F6.3—6.3kV。每台机组设一台备用电动给水泵，接于单元B段。发电机出口短路容量为4330MV A，每段6kV母线计算负荷及所接电动机额定功率之和如表3所示。 经估算，6kV高压厂用电工作段所连设备的电缆总电容单相值最大为1.68μ F，该厂用电系统宜采用（）。",[285,287,289,290],{"key":20,"text":286,"correct":26},"高电阻接地；",{"key":24,"text":288,"correct":22},"低电阻接地；",{"key":28,"text":193,"correct":22},{"key":31,"text":291,"correct":22},"消弧线圈接地。",{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":24,"analysis":33},1023584,"某新建2X300MW火力发电厂，每台机组设 A、B两段6kV工作段，全厂设01 A、O1B两段6kV公用段，公用段间设有联络断路器，正常运行时公用段分别由I A、IIA单元段供电。每台机组设一台分裂绕组髙压工作变压器，容量50\u002F27-27MV A，半穿越阻抗U’ dl-2=21%,额定变比20±2X2.5%\u002F6.3—6.3kV。每台机组设一台备用电动给水泵，接于单元B段。发电机出口短路容量为4330MV A，每段6kV母线计算负荷及所接电动机额定功率之和如表3所示。 已知给水系电动机额定功率5500kW，启动电流倍数为6,电动机ηd?cosφd=0.8。髙厂变供电时，给水泵电动机正常启动时母线电压百分值为（）。",[296,298,300,302],{"key":20,"text":297,"correct":22},"80.2%；",{"key":24,"text":299,"correct":26},"81.8%；",{"key":28,"text":301,"correct":22},"84.0%；",{"key":31,"text":303,"correct":22},"85.7%.",{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":20,"analysis":33},1023585,"某300MW机组火力发电工程，主厂房设两台工作变压器，容量互为备用，设一段电动机控制中心（MC C）,变压器中性点直接接地?选择柴油发电机组时，事故保安A段计算负荷为435kVA,B段计算负荷为430kV A，重复计算负荷300kVA。接于PC和MCC的电负荷资料及厂用电接线见图5。 柴油发电机中性点接地方式应采用（）。",[308,310,311,312],{"key":20,"text":309,"correct":26},"直接接地；",{"key":24,"text":193,"correct":22},{"key":28,"text":286,"correct":22},{"key":31,"text":313,"correct":22},"低电阻接地。",{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":20,"analysis":33},1023586,"某线路采用双地线，导线采用双分裂LGJ—400\u002F35钢芯铝绞线，为解决系统通信问题，其中一根为OPGW（自阻抗为Z0），另一根为普通铝包钢线（自阻抗为Zs）。两根地线之间的互阻抗为Zos。 导线的平均高度是指档内各点对电线最低点高度的平均值，一般对电线的悬挂曲线方程沿档距进行积分求得，已知导线弧垂fm=36m,导线挂点两侧等高，请按平抛公式y=-γx（1-x）计算导线平均髙为（）。",[318,320,322,324],{"key":20,"text":319,"correct":26},"12m；",{"key":24,"text":321,"correct":22},"24m；",{"key":28,"text":323,"correct":22},"18m,",{"key":31,"text":325,"correct":22},"16m,",{"id":327,"libraryId":5,"type":15,"typeLabel":16,"stem":328,"options":329,"answer":28,"analysis":33},1023587,"某线路采用双地线，导线采用双分裂LGJ—400\u002F35钢芯铝绞线，为解决系统通信问题，其中一根为OPGW（自阻抗为Z0），另一根为普通铝包钢线（自阻抗为Zs）。两根地线之间的互阻抗为Zos。 某220kV线路双分裂导线直线转角塔，设计使用条件为l H=400m，lv =600m,允许转角φ=3°~10°。大风工况下风压为10.888N\u002Fm，张力为26706N,该导线允许最大张力35015N，若铁塔为大风工况控制，当直线塔带5°转角时，允许水平档距为（）。",[330,332,334,336],{"key":20,"text":331,"correct":22},"506.7m；",{"key":24,"text":333,"correct":22},"680.Om；",{"key":28,"text":335,"correct":26},"613.6m；",{"key":31,"text":337,"correct":22},"824.3m。",{"id":339,"libraryId":5,"type":15,"typeLabel":16,"stem":340,"options":341,"answer":31,"analysis":33},1023588,"某500kV线路，为1Omm冰区，导线绝缘子串长6m,地线金具串长0.5m，导线弧垂70m，地线弧垂65m,地线水平位移1.75m。 请问在档距1000m下，为满足防雷要求，铁塔挂点与边导线挂点间的最小垂直距离应为（）m。",[342,344,346,348],{"key":20,"text":343,"correct":22},"3；",{"key":24,"text":345,"correct":22},"2.5；",{"key":28,"text":347,"correct":22},"2.38；",{"key":31,"text":349,"correct":26},"4.42。",{"id":351,"libraryId":5,"type":15,"typeLabel":16,"stem":352,"options":353,"answer":20,"analysis":33},1023590,"某变电站的直流系统电压为110V,采用阀控式密封铅酸蓄电池组，无端电池，单体电池浮充电压2.24V。直流系统不带降压装置，充电装置采用20A的髙频开关电源模块，模块数量按N+1备用配置。 蓄电池组个数宜选择（）。",[354,356,358,360],{"key":20,"text":355,"correct":26},"52个；",{"key":24,"text":357,"correct":22},"54个；",{"key":28,"text":359,"correct":22},"104个；",{"key":31,"text":361,"correct":22},"108个。",{"id":363,"libraryId":5,"type":15,"typeLabel":16,"stem":364,"options":365,"answer":24,"analysis":33},1023591,"某变电站的直流系统电压为110V,采用阀控式密封铅酸蓄电池组，无端电池，单体电池浮充电压2.24V。直流系统不带降压装置，充电装置采用20A的髙频开关电源模块，模块数量按N+1备用配置。 事故放电末期单体蓄电池终止电压的最低允许值为（）。",[366,368,370,372],{"key":20,"text":367,"correct":22},"1.87V；",{"key":24,"text":369,"correct":26},"1.80V；",{"key":28,"text":371,"correct":22},"1.75V；",{"key":31,"text":373,"correct":22},"1.70V。",{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":24,"analysis":33},1023592,"某变电站的直流系统电压为110V,采用阀控式密封铅酸蓄电池组，无端电池，单体电池浮充电压2.24V。直流系统不带降压装置，充电装置采用20A的髙频开关电源模块，模块数量按N+1备用配置。 如该变电站控制保护设备的经常负荷电流约为50A,选择蓄电池容量为600Ah，则充电装置的20A髙频开关电源模块宜选择（）个。",[378,380,382,384],{"key":20,"text":379,"correct":22},"5；",{"key":24,"text":381,"correct":26},"7；",{"key":28,"text":383,"correct":22},"9；",{"key":31,"text":385,"correct":22},"10。",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":28,"analysis":33},1023593,"某变电站的直流系统电压为110V,采用阀控式密封铅酸蓄电池组，无端电池，单体电池浮充电压2.24V。直流系统不带降压装置，充电装置采用20A的髙频开关电源模块，模块数量按N+1备用配置。 充电装置回路的电流表测量范围宜选择为（）A。",[390,392,394,396],{"key":20,"text":391,"correct":22},"0~80；",{"key":24,"text":393,"correct":22},"0~100；",{"key":28,"text":395,"correct":26},"0~150；",{"key":31,"text":397,"correct":22},"0~200。",{"id":399,"libraryId":5,"type":15,"typeLabel":16,"stem":400,"options":401,"answer":28,"analysis":33},1023594,"某变电站的直流系统电压为110V,采用阀控式密封铅酸蓄电池组，无端电池，单体电池浮充电压2.24V。直流系统不带降压装置，充电装置采用20A的髙频开关电源模块，模块数量按N+1备用配置。 如该站为无人值班变电站，所配交流不停电电源不带蓄电池，从站用直流电源供电。则进行直流负荷统计计算时，事故放电计算时间应为（）。",[402,404,406,408],{"key":20,"text":403,"correct":22},"0.5h；",{"key":24,"text":405,"correct":22},"1h；",{"key":28,"text":407,"correct":26},"2h；",{"key":31,"text":409,"correct":22},"3h。",{"id":411,"libraryId":5,"type":15,"typeLabel":16,"stem":412,"options":413,"answer":28,"analysis":33},1023595,"某变电站的35kV母线上装设有一组40Mvar并联电容器组，采用单星形接线，且每相接成四个桥臂；在电容器组的中性点侧装设电抗率K=12%的串联电抗器；35kV母线电压互感器的变比为： 下列关于并联电容器组保护的描述中，不正确的是（）。",[414,416,418,420],{"key":20,"text":415,"correct":22},"对电容器组与断路器之间连线的相间短路故障，可装设带短延时的速断保护和过流保护；",{"key":24,"text":417,"correct":22},"过负荷保护可防止电容器组由于谐波彩响而产生的过负荷；",{"key":28,"text":419,"correct":26},"采用接于母线电压互感器的过电压保护可防止电容器组内由于多台电容器切除后产生的过电压损害；",{"key":31,"text":421,"correct":22},"装设失压保护的目的在于防止电容器组由于所连接的母线失压而产生的危害。",{"id":423,"libraryId":5,"type":15,"typeLabel":16,"stem":424,"options":425,"answer":31,"analysis":33},1023596,"某变电站的35kV母线上装设有一组40Mvar并联电容器组，采用单星形接线，且每相接成四个桥臂；在电容器组的中性点侧装设电抗率K=12%的串联电抗器；35kV母线电压互感器的变比为： 对于电容器组中多台电容器故障宜装设（）。",[426,428,430,432],{"key":20,"text":427,"correct":22},"零序电压保护；",{"key":24,"text":429,"correct":22},"电压差动保护；",{"key":28,"text":431,"correct":22},"不平衡电流保护；",{"key":31,"text":433,"correct":26},"桥差电流保护。",{"id":435,"libraryId":5,"type":15,"typeLabel":16,"stem":436,"options":437,"answer":24,"analysis":33},1023597,"某变电站的35kV母线上装设有一组40Mvar并联电容器组，采用单星形接线，且每相接成四个桥臂；在电容器组的中性点侧装设电抗率K=12%的串联电抗器；35kV母线电压互感器的变比为： 母线过电压保护的动作电压为（ ）。",[438,440,442,444],{"key":20,"text":439,"correct":22},"85V；",{"key":24,"text":441,"correct":26},"97V；",{"key":28,"text":443,"correct":22},"105V；",{"key":31,"text":445,"correct":22},"110V。",{"id":447,"libraryId":5,"type":15,"typeLabel":16,"stem":448,"options":449,"answer":28,"analysis":33},1023598,"某变电站的35kV母线上装设有一组40Mvar并联电容器组，采用单星形接线，且每相接成四个桥臂；在电容器组的中性点侧装设电抗率K=12%的串联电抗器；35kV母线电压互感器的变比为： 失压保护的动作电压为（）。",[450,452,454,456],{"key":20,"text":451,"correct":22},"20V；",{"key":24,"text":453,"correct":22},"35V；",{"key":28,"text":455,"correct":26},"50V；",{"key":31,"text":457,"correct":22},"80V。",{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":20,"analysis":33},1023599,"某变电站的500kV线路为关口计量点，拟装设专门的0.2级计费电能表，线路电流互感器和电压互感器均设有专门的计量用二次绕组。其中，线路电压互感器为三相星形接线，电压互感器一次电压为500A\u002F√3kV，二次星形电压为0.1\u002F√3kV。 下列电压互感器和电流互感器的准确度配置满足要求的组为（ ）。",[462,464,466,468],{"key":20,"text":463,"correct":26},"电压互感器采用0.2级，电流互感器采用0.2S级。",{"key":24,"text":465,"correct":22},"电压互感器采用0，2级，电流互感器采用0.5S级。",{"key":28,"text":467,"correct":22},"电压互感器采用0.5级，电流互感器采用0.2S级。",{"key":31,"text":469,"correct":22},"电压互感器采用0.5级，电流互感器采用0.5S级。",{"id":471,"libraryId":5,"type":15,"typeLabel":16,"stem":472,"options":473,"answer":24,"analysis":33},1023600,"某变电站的500kV线路为关口计量点，拟装设专门的0.2级计费电能表，线路电流互感器和电压互感器均设有专门的计量用二次绕组。其中，线路电压互感器为三相星形接线，电压互感器一次电压为500A\u002F√3kV，二次星形电压为0.1\u002F√3kV。 该电能表电压回路允许电压降应不大于电压互感器二次额定电压的（）。",[474,476,478,480],{"key":20,"text":475,"correct":22},"0.1%；",{"key":24,"text":477,"correct":26},"0.25%；",{"key":28,"text":479,"correct":22},"O.5%；",{"key":31,"text":481,"correct":22},"1%。",{"id":483,"libraryId":5,"type":15,"typeLabel":16,"stem":484,"options":485,"answer":24,"analysis":33},1023601,"某变电站的500kV线路为关口计量点，拟装设专门的0.2级计费电能表，线路电流互感器和电压互感器均设有专门的计量用二次绕组。其中，线路电压互感器为三相星形接线，电压互感器一次电压为500A\u002F√3kV，二次星形电压为0.1\u002F√3kV。 如电能表电压回路每相负荷按1OVA计，由电压互感器端子箱至电能表屏的电缆长度约为200m，则该回路铜芯电缆最小截面应选（）。",[486,488,490,492],{"key":20,"text":487,"correct":22},"2.5mm2；",{"key":24,"text":489,"correct":26},"4mm2；",{"key":28,"text":491,"correct":22},"6mm2；",{"key":31,"text":493,"correct":22},"8mm2。",{"id":495,"libraryId":5,"type":15,"typeLabel":16,"stem":496,"options":497,"answer":24,"analysis":33},1023602,"某变电站的500kV线路为关口计量点，拟装设专门的0.2级计费电能表，线路电流互感器和电压互感器均设有专门的计量用二次绕组。其中，线路电压互感器为三相星形接线，电压互感器一次电压为500A\u002F√3kV，二次星形电压为0.1\u002F√3kV。 下列关于电能量计量表计接线的描述中，不正确的是（）。",[498,500,502,504],{"key":20,"text":499,"correct":22},"当电能量计量表计与测量仪表共用电流互感器二次绕组时，电能量计量表计应接入电流互感器二次回路的最前端；",{"key":24,"text":501,"correct":26},"电能量计量表计专用电压互感器二次回路需装设隔离开关辅助触点；",{"key":28,"text":503,"correct":22},"主接线为双母线电压互感器切换时，两个电压互感器二次回路之间不应有公共电缆线；",{"key":31,"text":505,"correct":22},"当旁路断路器不代路时，旁路回路的远方电能量计量表计电压亙感器二次输入信号应断开。",{"id":507,"libraryId":5,"type":15,"typeLabel":16,"stem":508,"options":509,"answer":24,"analysis":33},1023603,"某变电站的220kV采用双母线接线，假定某回线路的断路器为DL，I母线侧隔离开关为1G,II母线侧隔离开关为2G,1G靠断路器侧带接地刀1GD。请确定： 下列关于防误操作闭锁的描述中，不正确的是（）。",[510,512,514,516],{"key":20,"text":511,"correct":22},"防止误拉（合）断路器；",{"key":24,"text":513,"correct":26},"防止带电拉（合）隔离开关；",{"key":28,"text":515,"correct":22},"防止带电合接地刀；",{"key":31,"text":517,"correct":22},"防止带接地刀合隔离开关。",{"id":519,"libraryId":5,"type":15,"typeLabel":16,"stem":520,"options":521,"answer":31,"analysis":33},1023604,"某变电站的220kV采用双母线接线，假定某回线路的断路器为DL，I母线侧隔离开关为1G,II母线侧隔离开关为2G,1G靠断路器侧带接地刀1GD。请确定： 下列关于1G的操作闭锁条件的描述中，不正确的是（）。",[522,524,526,528],{"key":20,"text":523,"correct":22},"DL必须断开；",{"key":24,"text":525,"correct":22},"2G可以断开或合上；",{"key":28,"text":527,"correct":22},"1GD必须断开；",{"key":31,"text":529,"correct":26},"1G回路必须不带电。",{"id":531,"libraryId":5,"type":15,"typeLabel":16,"stem":532,"options":533,"answer":31,"analysis":33},1023605,"某变电站的220kV采用双母线接线，假定某回线路的断路器为DL，I母线侧隔离开关为1G,II母线侧隔离开关为2G,1G靠断路器侧带接地刀1GD。请确定： 下列关于2G的操作闭锁条件的描述中，不正确的是（）。",[534,535,537,538],{"key":20,"text":523,"correct":22},{"key":24,"text":536,"correct":22},"1G可以断开或合上；",{"key":28,"text":527,"correct":22},{"key":31,"text":529,"correct":26},{"id":540,"libraryId":5,"type":15,"typeLabel":16,"stem":541,"options":542,"answer":24,"analysis":33},1023606,"某变电站的220kV采用双母线接线，假定某回线路的断路器为DL，I母线侧隔离开关为1G,II母线侧隔离开关为2G,1G靠断路器侧带接地刀1GD。请确定： 下列关于1GD的操作闭锁条件的描述中，不正确的是（ ）。 A.DL必须断开；",[543,544,546,548],{"key":20,"text":525,"correct":22},{"key":24,"text":545,"correct":26},"1G必须断开；",{"key":28,"text":547,"correct":22},"DL、1",{"key":31,"text":549,"correct":22},"2G都必须断开。",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":28,"analysis":33},1023607,"某变电站的35kV断路器采用三相联动电气操动机构，电气防跳采用电流启动电压保持的“串联防跳”接线方式，该断路器控制电压为220VD C，合闸电流为2 A，跳闸电流为1A。 下列关于断路器控制回路设计要求的描述中，不正确的是（）。",[554,556,558,560],{"key":20,"text":555,"correct":22},"应有控制回路电源监视，并宜监视跌、合闸回路完整性；",{"key":24,"text":557,"correct":22},"断路器合闸或跳闸完成后应使命令路冲自动解除；",{"key":28,"text":559,"correct":26},"断路器合闸和跳闸回路的电源应由两回不同的直流电源分别供电；",{"key":31,"text":561,"correct":22},"应有防止断路器出现“跳跃”现象的电气闭锁装置。",{"id":563,"libraryId":5,"type":15,"typeLabel":16,"stem":564,"options":565,"answer":24,"analysis":33},1023608,"某变电站的35kV断路器采用三相联动电气操动机构，电气防跳采用电流启动电压保持的“串联防跳”接线方式，该断路器控制电压为220VD C，合闸电流为2 A，跳闸电流为1A。 下列关于断路器防跳功能的描述中，正确的是（）。",[566,568,570,572],{"key":20,"text":567,"correct":22},"防止断路器三相不一致而导致跳闸；",{"key":24,"text":569,"correct":26},"防止断路器由于控制回路原因而多次跳合；",{"key":28,"text":571,"correct":22},"防止断路器由于控制回路原因而导致误跳闸；",{"key":31,"text":573,"correct":22},"防止断路器主触头在分合闸过程中出现跳跃现象。",{"id":575,"libraryId":5,"type":15,"typeLabel":16,"stem":576,"options":577,"answer":20,"analysis":33},1023609,"某变电站的35kV断路器采用三相联动电气操动机构，电气防跳采用电流启动电压保持的“串联防跳”接线方式，该断路器控制电压为220VD C，合闸电流为2 A，跳闸电流为1A。 防跳继电器的参数应选（）。",[578,580,582,584],{"key":20,"text":579,"correct":26},"220V，0.5A；",{"key":24,"text":581,"correct":22},"220V,1A；",{"key":28,"text":583,"correct":22},"220V,2A；",{"key":31,"text":585,"correct":22},"110V,1A。",{"id":587,"libraryId":5,"type":15,"typeLabel":16,"stem":588,"options":589,"answer":24,"analysis":33},1023610,"某500kV变电站的主变压器型式为：三相油浸自耦变压器，无载调压，冷却方式为强油风冷。主要技术参数为： 电流互感器额定二次电流：三侧均为1A。 按双重化配置微机型变压器保护。 下列关于自耦变压器保护配置的描述中，不正确的是（）。",[590,592,594,596],{"key":20,"text":591,"correct":22},"自耦变压器高、中压两侧的零序电流保护，应接于各侧套管电流互感器组成的零序电流滤过器上，并根据选择性的要求装设方向元件；",{"key":24,"text":593,"correct":26},"对于高、中压两侧均有电源的降压自耦变压器，一般在高压、低压装设过负荷保护；",{"key":28,"text":595,"correct":22},"为了提高自耦变压器内部接地故障时的灵敏性，在自耦变压器上可装设零序电流差动保护；",{"key":31,"text":597,"correct":22},"500kV自耦变压器应装设过励磁保护。",{"id":599,"libraryId":5,"type":15,"typeLabel":16,"stem":600,"options":601,"answer":20,"analysis":33},1023611,"某500kV变电站的主变压器型式为：三相油浸自耦变压器，无载调压，冷却方式为强油风冷。主要技术参数为： 电流互感器额定二次电流：三侧均为1A。 按双重化配置微机型变压器保护。 下列关于500kV变压器的断路器失灵保护动作出口的描述中，不正确的是（）。",[602,604,606,608],{"key":20,"text":603,"correct":26},"500kV侧断路器失灵时，失灵保护只需跳开失灵断路器相邻和对侧的全部500kV断路器；",{"key":24,"text":605,"correct":22},"主变压器220kV侧断路器失灵保护包括三相电流继电器及其延时输出接点；",{"key":28,"text":607,"correct":22},"主变压器保护（非电量保护除外）动作，主变压器220kV侧断路器失灵，经电流判别，第一时限解除失灵保护复合电压闭锁回路，第二时限启动220kV母线失灵保护，动作跳开相关母线上的所有断路器；",{"key":31,"text":609,"correct":22},"母线保护动作，变压器220kV侧断路器失灵，经电流判别，延时跳开变压器各側断路器。",[611,614,617,620,623,626],{"id":15,"name":612,"category":7,"favorite":613},"领导干部任职前廉政法规知识测试题",92,{"id":615,"name":616,"category":7,"favorite":15},595,"建筑结构与设备",{"id":618,"name":619,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":621,"name":622,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":624,"name":625,"category":7,"favorite":8},534,"BIM工程师",{"id":627,"name":625,"category":7,"favorite":8},535]