[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-751-35":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":611},{"id":5,"name":6,"category":7,"favorite":8},751,"电气工程师发输变电专业","建筑工程",0,35,50,2670,[13,34,46,58,67,79,87,99,111,123,135,147,159,171,183,195,207,219,231,243,255,267,279,291,302,314,326,338,349,361,373,385,395,407,419,431,443,455,467,479,491,503,515,527,539,551,563,575,587,599],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1023459,1,"单选题","图16是一个500kV电网图，AB线上的故障切除时间必须控制在100ms以内（含100ms）,才能保证500kV电网稳定运行。 请从图16中确定A站与B站之间的AB线路的后备保护为（）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","断路器失灵保护；",true,{"key":24,"text":25,"correct":26},"B","光纤分相电流差动保护；",false,{"key":28,"text":29,"correct":26},"C","高頻距离保护；",{"key":31,"text":32,"correct":26},"D","行波测距。","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1023460,"图16是一个500kV电网图，AB线上的故障切除时间必须控制在100ms以内（含100ms）,才能保证500kV电网稳定运行。 请从图16中确定A站与B站之间的AB线路的辅助保护为（）。",[38,40,42,44],{"key":20,"text":39,"correct":26},"距离III段保护；",{"key":24,"text":41,"correct":22},"短引线保护；",{"key":28,"text":43,"correct":26},"行波测距；",{"key":31,"text":45,"correct":26},"断路器失灵保护。",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1023461,"图17是一个500kV电网系统示意图，图中示出了3个地区电网，其中 A、B之间通过单回500kV线路连接， B、C之间通过同杆双0线连接。 为了校核 A、B电网之间的第一级安全稳定标准，应该使用（）故障进行校核。",[50,52,54,56],{"key":20,"text":51,"correct":22},"单相瞬时接地故障重合成功；",{"key":24,"text":53,"correct":26},"单相永久故障重合不成功；",{"key":28,"text":55,"correct":26},"三相故障断开不重合；",{"key":31,"text":57,"correct":26},"同杆双回线异名相跨线故障。",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1023462,"图17是一个500kV电网系统示意图，图中示出了3个地区电网，其中 A、B之间通过单回500kV线路连接， B、C之间通过同杆双0线连接。 为了保证 B、C电网之间的线路发生第二级安全稳定标准下的故障时电网稳定运行，应该采用下列（）故障进行校核。",[62,63,64,65],{"key":20,"text":51,"correct":22},{"key":24,"text":53,"correct":26},{"key":28,"text":55,"correct":26},{"key":31,"text":66,"correct":26},"同杆双面线异名相跨线故障。",{"id":68,"libraryId":5,"type":15,"typeLabel":16,"stem":69,"options":70,"answer":24,"analysis":33},1023463,"图17是一个500kV电网系统示意图，图中示出了3个地区电网，其中 A、B之间通过单回500kV线路连接， B、C之间通过同杆双0线连接。 在以负荷为主的C区，在 A、B之间的同杆双回线断开后，最有可能采取的安全稳定措施是（）。",[71,73,75,77],{"key":20,"text":72,"correct":26},"快速集中切机；",{"key":24,"text":74,"correct":22},"过频切机；",{"key":28,"text":76,"correct":26},"低频低压切负荷；",{"key":31,"text":78,"correct":26},"电网解列。",{"id":80,"libraryId":5,"type":15,"typeLabel":16,"stem":81,"options":82,"answer":31,"analysis":33},1023464,"某线路采用双地线，导线采用双分裂LGJ—400\u002F35钢芯铝绞线，为解决系统通信问题，其中一根为OPGW（自阻抗为Z0），另一根为普通铝包钢线（自阻抗为Zs）。两根地线之间的互阻抗为Zos。 请计算铝包钢线的分流表达式（）。",[83,84,85,86],{"key":20,"text":20,"correct":26},{"key":24,"text":24,"correct":26},{"key":28,"text":28,"correct":26},{"key":31,"text":31,"correct":22},{"id":88,"libraryId":5,"type":15,"typeLabel":16,"stem":89,"options":90,"answer":24,"analysis":33},1023465,"某线路采用双地线，导线采用双分裂LGJ—400\u002F35钢芯铝绞线，为解决系统通信问题，其中一根为OPGW（自阻抗为Z0），另一根为普通铝包钢线（自阻抗为Zs）。两根地线之间的互阻抗为Zos。 该线路经过地区的气象资料风速为28.9m\u002Fs，设计推荐为29m\u002Fs，但审核定为30m\u002Fs。设计人员认为（）。",[91,93,95,97],{"key":20,"text":92,"correct":26},"安全；",{"key":24,"text":94,"correct":22},"不安全；",{"key":28,"text":96,"correct":26},"满足规程；",{"key":31,"text":98,"correct":26},"保守。",{"id":100,"libraryId":5,"type":15,"typeLabel":16,"stem":101,"options":102,"answer":20,"analysis":33},1023466,"某线路采用双地线，导线采用双分裂LGJ—400\u002F35钢芯铝绞线，为解决系统通信问题，其中一根为OPGW（自阻抗为Z0），另一根为普通铝包钢线（自阻抗为Zs）。两根地线之间的互阻抗为Zos。 电线上的应力随气象条件变化，在各代表档距下，电线应力在各种气象条件下不能超过相应气象条件允许的控制应力，可能存在某档距，小于该档距为一种控制，大于该档距为另一种控制条件，则该档距为两控制气象条件的临界档距。某线路采用双分裂导线LGJ—400\u002F35，导线截面积425.24mm2，导线自重比载r1为0.03111MPa\u002F（m?mm2），线膨胀系数0.0000205（1\u002F℃）,弹性系数E为65000MPa，电线覆设计最大冰的气象条件[-5℃，1Omm冰，同时风速10m\u002Fs，σm=92.842MPa,r7=0.05571MPa\u002F（m?mm2）],电线年平均气象条件（15V,无冰，无风，σcp=58.03MPa），年平均气温工况15℃和覆冰工况的临界档距为（）。",[103,105,107,109],{"key":20,"text":104,"correct":22},"203.7m；",{"key":24,"text":106,"correct":26},"330.4m；",{"key":28,"text":108,"correct":26},"558.9m；",{"key":31,"text":110,"correct":26},"440.3m。",{"id":112,"libraryId":5,"type":15,"typeLabel":16,"stem":113,"options":114,"answer":24,"analysis":33},1023467,"华中地区某发电厂装机为2X200MW+2X300MW，以发电机一变压器组单元接线接入220kV配电装置，送出线路共5回，每回线路的最大输送功率均为250MW,220kV断路器选用SF6柱式断路器。根据系统计算，220kV电压波动范围是209~242kV,主变离压侧抽头为（242—2X2.5%）kV。 发电机的额定功率因数均为0.85。 300MW发电机出口电压为20kV、200MW发电机出口电压为15.75kV。 该电厂年利用小时数为3000h，上网电价为0.20元\u002FkWh。 厂址内最热月平均最高温度为40℃。 220kV最佳主接线方案是（）。",[115,117,119,121],{"key":20,"text":116,"correct":26},"双母战接线；",{"key":24,"text":118,"correct":22},"双母线单分段接线；",{"key":28,"text":120,"correct":26},"双母线双分段接线；",{"key":31,"text":122,"correct":26},"1个半断路器接线。",{"id":124,"libraryId":5,"type":15,"typeLabel":16,"stem":125,"options":126,"answer":28,"analysis":33},1023468,"华中地区某发电厂装机为2X200MW+2X300MW，以发电机一变压器组单元接线接入220kV配电装置，送出线路共5回，每回线路的最大输送功率均为250MW,220kV断路器选用SF6柱式断路器。根据系统计算，220kV电压波动范围是209~242kV,主变离压侧抽头为（242—2X2.5%）kV。 发电机的额定功率因数均为0.85。 300MW发电机出口电压为20kV、200MW发电机出口电压为15.75kV。 该电厂年利用小时数为3000h，上网电价为0.20元\u002FkWh。 厂址内最热月平均最高温度为40℃。 该电厂发电机中性点接地方式应为（ ），要求发电机内部发生单相接地时应瞬时跳闸。",[127,129,131,133],{"key":20,"text":128,"correct":26},"不接地；",{"key":24,"text":130,"correct":26},"经消弧线圈接地；",{"key":28,"text":132,"correct":22},"经高电阻接地；",{"key":31,"text":134,"correct":26},"经低电阻接地。",{"id":136,"libraryId":5,"type":15,"typeLabel":16,"stem":137,"options":138,"answer":31,"analysis":33},1023469,"华中地区某发电厂装机为2X200MW+2X300MW，以发电机一变压器组单元接线接入220kV配电装置，送出线路共5回，每回线路的最大输送功率均为250MW,220kV断路器选用SF6柱式断路器。根据系统计算，220kV电压波动范围是209~242kV,主变离压侧抽头为（242—2X2.5%）kV。 发电机的额定功率因数均为0.85。 300MW发电机出口电压为20kV、200MW发电机出口电压为15.75kV。 该电厂年利用小时数为3000h，上网电价为0.20元\u002FkWh。 厂址内最热月平均最高温度为40℃。 已知：220kV系统侧电抗为0.15 （Sj=1OOOMV A）,运算曲线中，300MW发电机短路电流标么值是3.7，200MW发电机短路电流标么值是2.8。当220kV母线发生三相短路时，母线短路电流周期分量有效值是（）。",[139,141,143,145],{"key":20,"text":140,"correct":26},"34.55kA；",{"key":24,"text":142,"correct":26},"24.71kA；",{"key":28,"text":144,"correct":26},"33.05kA；",{"key":31,"text":146,"correct":22},"26.60kA。",{"id":148,"libraryId":5,"type":15,"typeLabel":16,"stem":149,"options":150,"answer":28,"analysis":33},1023470,"华中地区某发电厂装机为2X200MW+2X300MW，以发电机一变压器组单元接线接入220kV配电装置，送出线路共5回，每回线路的最大输送功率均为250MW,220kV断路器选用SF6柱式断路器。根据系统计算，220kV电压波动范围是209~242kV,主变离压侧抽头为（242—2X2.5%）kV。 发电机的额定功率因数均为0.85。 300MW发电机出口电压为20kV、200MW发电机出口电压为15.75kV。 该电厂年利用小时数为3000h，上网电价为0.20元\u002FkWh。 厂址内最热月平均最高温度为40℃。 300MW机组主变压器容量370MVA,距升压站约250m，其髙压侧导线宜选用（）。",[151,153,155,157],{"key":20,"text":152,"correct":26},"LGKK—600；",{"key":24,"text":154,"correct":26},"2XLGKK-600；",{"key":28,"text":156,"correct":22},"LGJQT-1400；",{"key":31,"text":158,"correct":26},"2XLGJQT—1400。",{"id":160,"libraryId":5,"type":15,"typeLabel":16,"stem":161,"options":162,"answer":24,"analysis":33},1023471,"某钢铁公司自备热电厂装机3X60MW，发电机出口电压为1OkV,钢铁公司需要20回1OkV电源，多余电量以110kV电压等级上网。 1OkV出线每回容量最小为5MV A，均为电缆出线，供电距离100~2000m不等。 厂用电率按8%考虑，cosφ=0.8。 每台发电机及其主回路的单相接地电容电流为0.6A,若单相接地故障不要求瞬时切机，发电机中性点宜采用（）。",[163,165,167,169],{"key":20,"text":164,"correct":26},"不接地方式；",{"key":24,"text":166,"correct":22},"经消弧线圈接地的过补偿方式；",{"key":28,"text":168,"correct":26},"经消弧线围接地的欠补偿方式；",{"key":31,"text":170,"correct":26},"经高电阻接地方式。",{"id":172,"libraryId":5,"type":15,"typeLabel":16,"stem":173,"options":174,"answer":28,"analysis":33},1023472,"某钢铁公司自备热电厂装机3X60MW，发电机出口电压为1OkV,钢铁公司需要20回1OkV电源，多余电量以110kV电压等级上网。 1OkV出线每回容量最小为5MV A，均为电缆出线，供电距离100~2000m不等。 厂用电率按8%考虑，cosφ=0.8。 本电厂主变压器选择最合理的是（）。",[175,177,179,181],{"key":20,"text":176,"correct":26},"1台125MVA双绕组变压器；",{"key":24,"text":178,"correct":26},"2台63MVA双绕组变压器；",{"key":28,"text":180,"correct":22},"2台75MVA双统组变压器；",{"key":31,"text":182,"correct":26},"2台125MVA双绕组变压器。",{"id":184,"libraryId":5,"type":15,"typeLabel":16,"stem":185,"options":186,"answer":31,"analysis":33},1023473,"某钢铁公司自备热电厂装机3X60MW，发电机出口电压为1OkV,钢铁公司需要20回1OkV电源，多余电量以110kV电压等级上网。 1OkV出线每回容量最小为5MV A，均为电缆出线，供电距离100~2000m不等。 厂用电率按8%考虑，cosφ=0.8。 假定发电机出口短路电流I\"=38k A，ich=931kV,发电机引出线宜采用（）。 （说明：导体载流量综合环境校正系数取1）。",[187,189,191,193],{"key":20,"text":188,"correct":26},"3（125X10）矩形铝母线，竖放，相间距300mm,絶缘子间距2200mm；",{"key":24,"text":190,"correct":26},"3（125X10）银形铝母线，竖放，相间距300mm，绝缘子间距1200mm；",{"key":28,"text":192,"correct":26},"2（125X55）槽形铝母线，实连，相间距300mm，绝缘子间距3000mm；",{"key":31,"text":194,"correct":22},"2（125X55）槽形铝母线，实连，相间距300mm,绝缘子间距2280mm。",{"id":196,"libraryId":5,"type":15,"typeLabel":16,"stem":197,"options":198,"answer":20,"analysis":33},1023474,"某钢铁公司自备热电厂装机3X60MW，发电机出口电压为1OkV,钢铁公司需要20回1OkV电源，多余电量以110kV电压等级上网。 1OkV出线每回容量最小为5MV A，均为电缆出线，供电距离100~2000m不等。 厂用电率按8%考虑，cosφ=0.8。 电厂1OkV配电装置拟采用两层装配与成套混合式屋内配电装置，对于该配电装置以下说法正确的是（）。",[199,201,203,205],{"key":20,"text":200,"correct":22},"上下两层均布置为三走道，母线隔离开关只能布里在上层；",{"key":24,"text":202,"correct":26},"出线电抗器可与母线隔离开关布置在同层；",{"key":28,"text":204,"correct":26},"出线电抗器可与GG1A成套拒布置在上层；",{"key":31,"text":206,"correct":26},"为保证人身安全，出线电抗器与GG1A成套拒应布置在网门内。",{"id":208,"libraryId":5,"type":15,"typeLabel":16,"stem":209,"options":210,"answer":31,"analysis":33},1023475,"某钢铁公司自备热电厂装机3X60MW，发电机出口电压为1OkV,钢铁公司需要20回1OkV电源，多余电量以110kV电压等级上网。 1OkV出线每回容量最小为5MV A，均为电缆出线，供电距离100~2000m不等。 厂用电率按8%考虑，cosφ=0.8。 电厂采用三回110kV架空线与电网相连，且全线均设有避雷线。110kV配电装置采用双母线接线，每组母线上装设有金屑氧化物避雷器。该避雷器与主变压器的最大电气距离是（）。",[211,213,215,217],{"key":20,"text":212,"correct":26},"125m；",{"key":24,"text":214,"correct":26},"145m；",{"key":28,"text":216,"correct":26},"170m；",{"key":31,"text":218,"correct":22},"205m。",{"id":220,"libraryId":5,"type":15,"typeLabel":16,"stem":221,"options":222,"answer":20,"analysis":33},1023476,"某火力发电厂新建4台300MW机组，高压厂用电压采用6kV，高压厂用工作变压器选用容量为40\u002F25—25MVA的分裂变压器，其半穿越阻抗Zl dl-2'=16.5%，单侧铜耗为160kW。厂变分裂系数为3.5。 机组电动给水泵为6300kW，给水泵启动前厂用母线已带负荷S1为l8000kV A，给水泵参数：启动电流倍数KQ=6,额定效率ηQ=0.97,额定功率因数cosφ=0.9,那么给水泵启动时母线电压标么值应为（）。",[223,225,227,229],{"key":20,"text":224,"correct":22},"0.82；",{"key":24,"text":226,"correct":26},"0.84；",{"key":28,"text":228,"correct":26},"0.876；",{"key":31,"text":230,"correct":26},"0.864。",{"id":232,"libraryId":5,"type":15,"typeLabel":16,"stem":233,"options":234,"answer":31,"analysis":33},1023477,"某火力发电厂新建4台300MW机组，高压厂用电压采用6kV，高压厂用工作变压器选用容量为40\u002F25—25MVA的分裂变压器，其半穿越阻抗Zl dl-2'=16.5%，单侧铜耗为160kW。厂变分裂系数为3.5。 发电机出口短路容量按6000MV A，6kV A段上参与反馈的电动机容量为21MW。6kVA段短路电流为（）。 A.I\"=35.23kA,ich=89.21kA；",[235,237,239,241],{"key":20,"text":236,"correct":26},"I\"=35.23k",{"key":24,"text":238,"correct":26},"ich=91.77kA；",{"key":28,"text":240,"correct":26},"I\"=35.23kA,ich=98.22kA；",{"key":31,"text":242,"correct":22},"I\"=38.77kA,ich=101.86kA。",{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":20,"analysis":33},1023478,"某火力发电厂新建4台300MW机组，高压厂用电压采用6kV，高压厂用工作变压器选用容量为40\u002F25—25MVA的分裂变压器，其半穿越阻抗Zl dl-2'=16.5%，单侧铜耗为160kW。厂变分裂系数为3.5。 电厂输煤系统设置了两台1OOOkVA的低压干式变压器，Ud=6%,互为备用.容量为55kW的电动机回路，开关脫扣器的短路瞬动整定电流值为1800 A，未装设接地短路保护，选用3X95mm2铝芯电缆，为使回路发生短路故障时脱扣器能可靠动作，电动机距离供电中心的电气距离大约应在（）范围内。",[247,249,251,253],{"key":20,"text":248,"correct":22},"70m；",{"key":24,"text":250,"correct":26},"100m；",{"key":28,"text":252,"correct":26},"200m；",{"key":31,"text":254,"correct":26},"250m。",{"id":256,"libraryId":5,"type":15,"typeLabel":16,"stem":257,"options":258,"answer":28,"analysis":33},1023479,"某火力发电厂新建4台300MW机组，高压厂用电压采用6kV，高压厂用工作变压器选用容量为40\u002F25—25MVA的分裂变压器，其半穿越阻抗Zl dl-2'=16.5%，单侧铜耗为160kW。厂变分裂系数为3.5。 在除灰水泵房设有1段MC C，共7台MNS型配电柜，配电柜母线要考虑检修，布置图如图1,假定只有走廊一侧可开门，请指出其中不符合有关标准的规定的有（）处，并分析、说明正确的做法。",[259,261,263,265],{"key":20,"text":260,"correct":26},"2",{"key":24,"text":262,"correct":26},"3",{"key":28,"text":264,"correct":22},"4",{"key":31,"text":266,"correct":26},"5",{"id":268,"libraryId":5,"type":15,"typeLabel":16,"stem":269,"options":270,"answer":20,"analysis":33},1023480,"某燃煤发电厂，装机容量为4X125MW，以发电机一变压器组单元接线接入220kV及110kV配电装置。220kV送出线路共4回。110kV送出线路共8回，220kV及110kV断路器选用SF6柱式断路器， 发电机的额定功率因数均为0.85。 发电机出口电压为15.75kV。厂址内最热月平均最高温度为35℃。 本工程11OkV及220kV比较合理的主接线方案是（）。",[271,273,275,277],{"key":20,"text":272,"correct":22},"220kV双母线接线，110kV双母线接线；",{"key":24,"text":274,"correct":26},"220kV双母线接线，110kV双母线带专用旁路断路器接线；",{"key":28,"text":276,"correct":26},"220kV单母线接线，110kV双母线单分段接线；",{"key":31,"text":278,"correct":26},"220kV双母线接线，110kV双母线接线带旁路设施。",{"id":280,"libraryId":5,"type":15,"typeLabel":16,"stem":281,"options":282,"answer":24,"analysis":33},1023481,"某燃煤发电厂，装机容量为4X125MW，以发电机一变压器组单元接线接入220kV及110kV配电装置。220kV送出线路共4回。110kV送出线路共8回，220kV及110kV断路器选用SF6柱式断路器， 发电机的额定功率因数均为0.85。 发电机出口电压为15.75kV。厂址内最热月平均最高温度为35℃。 本工程主变压器合理的选型是（）。",[283,285,287,289],{"key":20,"text":284,"correct":26},"四台三绕组（升至220kV及110kV）；",{"key":24,"text":286,"correct":22},"两台三绕组（升至220kV及110kV）,两台双绕组（升至220kV）；",{"key":28,"text":288,"correct":26},"四台双绕组（两台升至220kV，两台升至110kV）；",{"key":31,"text":290,"correct":26},"三台三绕组（升至220kV及110kV）,—台双绕組（升至110kV）。",{"id":292,"libraryId":5,"type":15,"typeLabel":16,"stem":293,"options":294,"answer":31,"analysis":33},1023482,"某燃煤发电厂，装机容量为4X125MW，以发电机一变压器组单元接线接入220kV及110kV配电装置。220kV送出线路共4回。110kV送出线路共8回，220kV及110kV断路器选用SF6柱式断路器， 发电机的额定功率因数均为0.85。 发电机出口电压为15.75kV。厂址内最热月平均最高温度为35℃。 发电机回路的导体，经济合理的选择是（）。",[295,297,298,300],{"key":20,"text":296,"correct":26},"矩形铜导体4（125X10）；",{"key":24,"text":296,"correct":26},{"key":28,"text":299,"correct":26},"槽形铝导体175X80X8；",{"key":31,"text":301,"correct":22},"槽形铝导体200X90X10。",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":28,"analysis":33},1023483,"某燃煤发电厂，装机容量为4X125MW，以发电机一变压器组单元接线接入220kV及110kV配电装置。220kV送出线路共4回。110kV送出线路共8回，220kV及110kV断路器选用SF6柱式断路器， 发电机的额定功率因数均为0.85。 发电机出口电压为15.75kV。厂址内最热月平均最高温度为35℃。 电厂布置中，220kV架空线与110kV架空线出现交叉，220kV在上方，110kV在下方。220kV导线与110kV线路避雷线之间的垂直距离应大于（）。",[306,308,310,312],{"key":20,"text":307,"correct":26},"2m；",{"key":24,"text":309,"correct":26},"3m；",{"key":28,"text":311,"correct":22},"4m；",{"key":31,"text":313,"correct":26},"3.8m。",{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":28,"analysis":33},1023484,"某8X125MW燃煤机组设置有燃油系统，燃油系统及邻近区域电负荷如表1,所有电机的启动电流倍数均为7,功率因数均为0.8。 以上负荷均按II类负荷。",[318,320,322,324],{"key":20,"text":319,"correct":26},"如表中负荷设置2台暗备用变压器供电，则每台变压器的容量宜选择（）。",{"key":24,"text":321,"correct":26},"315kVA；",{"key":28,"text":323,"correct":22},"400kVA； C500kVA；",{"key":31,"text":325,"correct":26},"630kVA。",{"id":327,"libraryId":5,"type":15,"typeLabel":16,"stem":328,"options":329,"answer":31,"analysis":33},1023485,"某8X125MW燃煤机组设置有燃油系统，燃油系统及邻近区域电负荷如表1,所有电机的启动电流倍数均为7,功率因数均为0.8。 以上负荷均按II类负荷。 假定表中负荷不设置单独的变压器，而由附近的其他动力中心供电，供电方式为暗备用PC-MCC方式，在燃油区仅设置MCC。则该MCC电源回路的工作电流大致为（） （11项考虑接P C）。",[330,332,334,336],{"key":20,"text":331,"correct":26},"990A；",{"key":24,"text":333,"correct":26},"800A；",{"key":28,"text":335,"correct":26},"610A；",{"key":31,"text":337,"correct":22},"460A。",{"id":339,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":340,"answer":20,"analysis":33},1023486,[341,343,345,347],{"key":20,"text":342,"correct":22},"本部分电负荷的短路保护拟采用施耐德NS型塑壳式断路器（动作时间5ms），则表中轻油卸油泵的供电回路中，断路器过电流脱扣器整定电流不小于（）。",{"key":24,"text":344,"correct":26},"714A；",{"key":28,"text":346,"correct":26},"542A； C567A；",{"key":31,"text":348,"correct":26},"60A。",{"id":350,"libraryId":5,"type":15,"typeLabel":16,"stem":351,"options":352,"answer":24,"analysis":33},1023487,"某8X125MW燃煤机组设置有燃油系统，燃油系统及邻近区域电负荷如表1,所有电机的启动电流倍数均为7,功率因数均为0.8。 以上负荷均按II类负荷。 假定表中所有负荷的相间短路护均不能满足单相接地短路保护的灵敏性，应装设接地短路保护的电机为（）台。",[353,355,357,359],{"key":20,"text":354,"correct":26},"5；",{"key":24,"text":356,"correct":22},"8；",{"key":28,"text":358,"correct":26},"9；",{"key":31,"text":360,"correct":26},"24。",{"id":362,"libraryId":5,"type":15,"typeLabel":16,"stem":363,"options":364,"answer":24,"analysis":33},1023488,"某8X125MW燃煤机组设置有燃油系统，燃油系统及邻近区域电负荷如表1,所有电机的启动电流倍数均为7,功率因数均为0.8。 以上负荷均按II类负荷。 经计算，PC上向MCC供电的回路的工作电流为500 A，采用框架式断路器，断路器额定电流In=630 A，其短路短延时整定电流值可为In的2、3、4、6、8、10倍，MCC上引接的最大电机为55kW，MCC电源进线处短路时的短路电流为4k A，框架断路器的短路短延时整定值倍数选择（）。",[365,367,369,371],{"key":20,"text":366,"correct":26},"2、3、4倍均可；",{"key":24,"text":368,"correct":22},"3、4倍均可；",{"key":28,"text":370,"correct":26},"3、4、6倍均可；",{"key":31,"text":372,"correct":26},"3~10倍均可。",{"id":374,"libraryId":5,"type":15,"typeLabel":16,"stem":375,"options":376,"answer":28,"analysis":33},1023489,"某8X125MW燃煤机组设置有燃油系统，燃油系统及邻近区域电负荷如表1,所有电机的启动电流倍数均为7,功率因数均为0.8。 以上负荷均按II类负荷。 大电流回路拟选用YJV型电力电缆，其电缆载流量选用《电力工程电缆设计规范》（GB50217—1994）的附表，则表中重油供油荥电机回路的电缆截面应选择（）。电缆采用架空桥架（托盘式）无间距敷设，电缆桥架的最上层装有盖板，每层桥架内动力电缆按单层布置，每层桥架内控制电缆可敷设3层，环境温度45℃。",[377,379,381,383],{"key":20,"text":378,"correct":26},"3X50；",{"key":24,"text":380,"correct":26},"3X70；",{"key":28,"text":382,"correct":22},"3X95；",{"key":31,"text":384,"correct":26},"3X120。",{"id":386,"libraryId":5,"type":15,"typeLabel":16,"stem":387,"options":388,"answer":28,"analysis":33},1023490,"某水电厂装机容量为3X50MW,选用了3台厂用变压器，且互为备用，发电机电压无直配线。 所有同时运行的最大负荷的额定功率总和为1233kW；厂用电负荷的综合系数取0.75,则厂用变压器容量选（）最合适。",[389,390,392,394],{"key":20,"text":321,"correct":26},{"key":24,"text":391,"correct":26},"400kVA；",{"key":28,"text":393,"correct":22},"500kVA；",{"key":31,"text":325,"correct":26},{"id":396,"libraryId":5,"type":15,"typeLabel":16,"stem":397,"options":398,"answer":24,"analysis":33},1023491,"某水电厂装机容量为3X50MW,选用了3台厂用变压器，且互为备用，发电机电压无直配线。 调速器油泵电机由主屏直接供电，电缆长180m，电动机功率37kW。该回路如逸用铜芯电缆，则截面应为（）（电缆的综合修正系数取1.0，COSφ=O.8,聚氯乙烯绝缘。",[399,401,403,405],{"key":20,"text":400,"correct":26},"3X16；",{"key":24,"text":402,"correct":22},"3X25；",{"key":28,"text":404,"correct":26},"3X35；",{"key":31,"text":406,"correct":26},"3X50。",{"id":408,"libraryId":5,"type":15,"typeLabel":16,"stem":409,"options":410,"answer":31,"analysis":33},1023492,"某水电厂装机容量为3X50MW,选用了3台厂用变压器，且互为备用，发电机电压无直配线。 上述调速油泵电机启动时间约8s,其供电回路设计时采用RTO型熔断器作短路保护，电机的启动电流倍数为6.5,则熔件额定电流宜选择（）。",[411,413,415,417],{"key":20,"text":412,"correct":26},"80A；",{"key":24,"text":414,"correct":26},"100A；",{"key":28,"text":416,"correct":26},"200A；",{"key":31,"text":418,"correct":22},"250A。",{"id":420,"libraryId":5,"type":15,"typeLabel":16,"stem":421,"options":422,"answer":28,"analysis":33},1023493,"某水电厂装机容量为3X50MW,选用了3台厂用变压器，且互为备用，发电机电压无直配线。 如发电机单机容量为150MW,发电机内部发生单相接地故瘅不要求瞬时切机。经计算，发电机电压回路及升压变压器低压卷的电容电流总计为2.5 A，发电机中性点宜采用的接地方式为（）。",[423,425,427,429],{"key":20,"text":424,"correct":26},"中性点不接地；",{"key":24,"text":426,"correct":26},"中性点直接接地；",{"key":28,"text":428,"correct":22},"中性点经消弧线圈接地（欠补偿方式）；",{"key":31,"text":430,"correct":26},"中性点经消弧线圈接地（过补偿方式）。",{"id":432,"libraryId":5,"type":15,"typeLabel":16,"stem":433,"options":434,"answer":28,"analysis":33},1023494,"某300MW机组6kV设 A、B两段，分别接有电动机总功率17900、22300kW,其中I类电动机容量占80%。电动给水泵为5000kW，给水泵启动前厂用母线已带负荷S1为18000kVA,给水泵参数：启动电流倍数K Q=6，额定效率如=0.97，额定功率因数cosφ=0.9；高压厂用变压器参数：容量40\u002F25—25MV A，电压20±2X2.5%\u002F6.3—6.3kV。厂用电选择开断水平40k A、动稳定1OOkA的标准开关设备，并配置有效的快速切换装置，高压厂用变压器髙压侧按无穷大电源系统考虑，试确定高压厂用变压器的半穿越电抗X DL-2’ %的取值，开断水平按Os计算。 髙压厂用变压器的半穿越电抗X DL-2’ %最小可取为（）。",[435,437,439,441],{"key":20,"text":436,"correct":26},"10.5；",{"key":24,"text":438,"correct":26},"17.02；",{"key":28,"text":440,"correct":22},"18.53；",{"key":31,"text":442,"correct":26},"20.13。",{"id":444,"libraryId":5,"type":15,"typeLabel":16,"stem":445,"options":446,"answer":24,"analysis":33},1023495,"某300MW机组6kV设 A、B两段，分别接有电动机总功率17900、22300kW,其中I类电动机容量占80%。电动给水泵为5000kW，给水泵启动前厂用母线已带负荷S1为18000kVA,给水泵参数：启动电流倍数K Q=6，额定效率如=0.97，额定功率因数cosφ=0.9；高压厂用变压器参数：容量40\u002F25—25MV A，电压20±2X2.5%\u002F6.3—6.3kV。厂用电选择开断水平40k A、动稳定1OOkA的标准开关设备，并配置有效的快速切换装置，高压厂用变压器髙压侧按无穷大电源系统考虑，试确定高压厂用变压器的半穿越电抗X DL-2’ %的取值，开断水平按Os计算。 高压厂用变压器的半穿越电抗X DL-2’ %最大可取为（）。",[447,449,451,453],{"key":20,"text":448,"correct":26},"40.14；",{"key":24,"text":450,"correct":22},"21.75；",{"key":28,"text":452,"correct":26},"20.13；",{"key":31,"text":454,"correct":26},"18.53,",{"id":456,"libraryId":5,"type":15,"typeLabel":16,"stem":457,"options":458,"answer":24,"analysis":33},1023496,"某300MW机组6kV设 A、B两段，分别接有电动机总功率17900、22300kW,其中I类电动机容量占80%。电动给水泵为5000kW，给水泵启动前厂用母线已带负荷S1为18000kVA,给水泵参数：启动电流倍数K Q=6，额定效率如=0.97，额定功率因数cosφ=0.9；高压厂用变压器参数：容量40\u002F25—25MV A，电压20±2X2.5%\u002F6.3—6.3kV。厂用电选择开断水平40k A、动稳定1OOkA的标准开关设备，并配置有效的快速切换装置，高压厂用变压器髙压侧按无穷大电源系统考虑，试确定高压厂用变压器的半穿越电抗X DL-2’ %的取值，开断水平按Os计算。 6kVA段（假定B段同A段）所有6kV电缆均采用ZR-YJV22—6\u002F6—3X70型，电缆总长约5.1km则该高压厂用电系统的中性点接地方式应选用（）。",[459,461,463,465],{"key":20,"text":460,"correct":26},"高电阻接地；",{"key":24,"text":462,"correct":22},"低电阻接地；",{"key":28,"text":464,"correct":26},"直接接地；",{"key":31,"text":466,"correct":26},"经消弧线圈接地。",{"id":468,"libraryId":5,"type":15,"typeLabel":16,"stem":469,"options":470,"answer":24,"analysis":33},1023497,"某火力发电厂电气主接线如图2所示。 为节约线路走廊，出线1和出线2为同塔双回送出，出线3和出线4也为同塔双回送出。 配电装置采用屋外敞开式普通中型配电装置，断路器单列式布置，间隔宽度15m，母线采用支持式铝管母线，管母外径150mm，两组母线间距为5m。 发电机额定容量均为300MW，最大连续容量为395MV A，母线穿越容量为800MVA。 220kV最大短路电流为40k A，短路切除时间为0.3s.每台机厂用负荷为32MVA。 图2中隔离开关的配置错误的有（）处。",[471,473,475,477],{"key":20,"text":472,"correct":26},"3；",{"key":24,"text":474,"correct":22},"4；",{"key":28,"text":476,"correct":26},"7；",{"key":31,"text":478,"correct":26},"10。",{"id":480,"libraryId":5,"type":15,"typeLabel":16,"stem":481,"options":482,"answer":28,"analysis":33},1023498,"某火力发电厂电气主接线如图2所示。 为节约线路走廊，出线1和出线2为同塔双回送出，出线3和出线4也为同塔双回送出。 配电装置采用屋外敞开式普通中型配电装置，断路器单列式布置，间隔宽度15m，母线采用支持式铝管母线，管母外径150mm，两组母线间距为5m。 发电机额定容量均为300MW，最大连续容量为395MV A，母线穿越容量为800MVA。 220kV最大短路电流为40k A，短路切除时间为0.3s.每台机厂用负荷为32MVA。 如220kV主接线更改为断路器接线，所有进出线均不装进出线隔离开关，则220kV主接线中需要（）组隔离开关。所有隔离开关均为双柱水平断口型。并绘制出接线示意图，图中应画出母线、断路器、隔离开关、电流互感器、电压互感器及避雷器。",[483,485,487,489],{"key":20,"text":484,"correct":26},"20；",{"key":24,"text":486,"correct":26},"22；",{"key":28,"text":488,"correct":22},"24；",{"key":31,"text":490,"correct":26},"27。",{"id":492,"libraryId":5,"type":15,"typeLabel":16,"stem":493,"options":494,"answer":24,"analysis":33},1023499,"某火力发电厂电气主接线如图2所示。 为节约线路走廊，出线1和出线2为同塔双回送出，出线3和出线4也为同塔双回送出。 配电装置采用屋外敞开式普通中型配电装置，断路器单列式布置，间隔宽度15m，母线采用支持式铝管母线，管母外径150mm，两组母线间距为5m。 发电机额定容量均为300MW，最大连续容量为395MV A，母线穿越容量为800MVA。 220kV最大短路电流为40k A，短路切除时间为0.3s.每台机厂用负荷为32MVA。 按照图2中接线，以下关于接地开关配置的说法中，正确的是（）。",[495,497,499,501],{"key":20,"text":496,"correct":26},"每组母线应配1~2组接地开关；",{"key":24,"text":498,"correct":22},"主变压器髙压側各配置1组接地开关；",{"key":28,"text":500,"correct":26},"母线隔离开关的断路器侧均应配里1组接地开关；",{"key":31,"text":502,"correct":26},"母线隔离开关的母线侧均应配置1组接地开关。",{"id":504,"libraryId":5,"type":15,"typeLabel":16,"stem":505,"options":506,"answer":28,"analysis":33},1023500,"某火力发电厂电气主接线如图2所示。 为节约线路走廊，出线1和出线2为同塔双回送出，出线3和出线4也为同塔双回送出。 配电装置采用屋外敞开式普通中型配电装置，断路器单列式布置，间隔宽度15m，母线采用支持式铝管母线，管母外径150mm，两组母线间距为5m。 发电机额定容量均为300MW，最大连续容量为395MV A，母线穿越容量为800MVA。 220kV最大短路电流为40k A，短路切除时间为0.3s.每台机厂用负荷为32MVA。 图示双母线接线如采用GIS设备，至少需配置（）快速接地开关。",[507,509,511,513],{"key":20,"text":508,"correct":26},"9组；",{"key":24,"text":510,"correct":26},"7组；",{"key":28,"text":512,"correct":22},"4组；",{"key":31,"text":514,"correct":26},"3组。",{"id":516,"libraryId":5,"type":15,"typeLabel":16,"stem":517,"options":518,"answer":28,"analysis":33},1023501,"某火力发电厂电气主接线如图2所示。 为节约线路走廊，出线1和出线2为同塔双回送出，出线3和出线4也为同塔双回送出。 配电装置采用屋外敞开式普通中型配电装置，断路器单列式布置，间隔宽度15m，母线采用支持式铝管母线，管母外径150mm，两组母线间距为5m。 发电机额定容量均为300MW，最大连续容量为395MV A，母线穿越容量为800MVA。 220kV最大短路电流为40k A，短路切除时间为0.3s.每台机厂用负荷为32MVA。 以下关于主变压器选择的说法中，正确的是（）。 A.该主变压器宜采用自耦变压器；",[519,521,523,525],{"key":20,"text":520,"correct":26},"该主变压器额定容量宜为400MV",{"key":24,"text":522,"correct":26},"且变压器绕组的平均温升在标准环境温度下不超过65℃；",{"key":28,"text":524,"correct":22},"该主变压器可采用额定分接电压为242kV、正分接为+1X2.5%、负分接为—2X2.的无助磁调压变压器；",{"key":31,"text":526,"correct":26},"该主变压器的联结組别是Dynll。",{"id":528,"libraryId":5,"type":15,"typeLabel":16,"stem":529,"options":530,"answer":20,"analysis":33},1023502,"某火力发电厂电气主接线如图2所示。 为节约线路走廊，出线1和出线2为同塔双回送出，出线3和出线4也为同塔双回送出。 配电装置采用屋外敞开式普通中型配电装置，断路器单列式布置，间隔宽度15m，母线采用支持式铝管母线，管母外径150mm，两组母线间距为5m。 发电机额定容量均为300MW，最大连续容量为395MV A，母线穿越容量为800MVA。 220kV最大短路电流为40k A，短路切除时间为0.3s.每台机厂用负荷为32MVA。 以下关于本电厂220kV断路器的描述中，错误的是（）。",[531,533,535,537],{"key":20,"text":532,"correct":22},"宜选择额定电压为220kV的SF6断路器；",{"key":24,"text":534,"correct":26},"如厂址基本地震烈度为9度，則不宜采用瓷柱式断路器；",{"key":28,"text":536,"correct":26},"断路器的额定雷电冲击耐压可选950kV （峰值），额定短时工频耐压可选395kV（有效值）；",{"key":31,"text":538,"correct":26},"断路器的额定开断能力不仅要校验三相短路的情况，还要校验单相短路的情况。",{"id":540,"libraryId":5,"type":15,"typeLabel":16,"stem":541,"options":542,"answer":24,"analysis":33},1023503,"某配电装置的母联间隔如图3所示，请依据此图回答回题。 如果图示为220kV电压等级的断面面，试根据以下条件确定最合适的挂线点标髙X和母线构架的高度y。母线隔离开关为GW10—252D型垂直伸缩式隔离开关，其底座下边沿至母线中心线的距离为6991mm,上层导线最大弧垂fmax=2000mm,母线支柱绝缘子ZSW—252高2300mm,经10号槽钢（立放）安装在母线梁上，管母线托架髙90mm,管母线滑动线夹髙155mm管母线T型线夹髙270mm。则应选择（）。",[543,545,547,549],{"key":20,"text":544,"correct":26},"Y=6.821m,X=13.500m；",{"key":24,"text":546,"correct":22},"Y=6.846m,X=14.500m；",{"key":28,"text":548,"correct":26},"Y=6.846m,X=13.500m；",{"key":31,"text":550,"correct":26},"Y=6.846m,X=16.500m。",{"id":552,"libraryId":5,"type":15,"typeLabel":16,"stem":553,"options":554,"answer":28,"analysis":33},1023504,"某配电装置的母联间隔如图3所示，请依据此图回答回题。 已知，每相导线（包括绝缘子串）在不同条件下的风偏为：大气过电压时风偏500mm,内过电压时风德750mm，最大工作电压时风偏1380mm，假定进出线无偏角，跳线、跨线风偏相同。则构架（门型架）的宽度宜取（）。",[555,557,559,561],{"key":20,"text":556,"correct":26},"12.50m；",{"key":24,"text":558,"correct":26},"11.80m；",{"key":28,"text":560,"correct":22},"13.00m；",{"key":31,"text":562,"correct":26},"14.00m。",{"id":564,"libraryId":5,"type":15,"typeLabel":16,"stem":565,"options":566,"answer":31,"analysis":33},1023505,"某配电装置的母联间隔如图3所示，请依据此图回答回题。 图3中配电装置的型式为（ ）。",[567,569,571,573],{"key":20,"text":568,"correct":26},"高型配电装里；",{"key":24,"text":570,"correct":26},"半高型配电装置；",{"key":28,"text":572,"correct":26},"普通中型配电装里；",{"key":31,"text":574,"correct":22},"分相中型配电装置。",{"id":576,"libraryId":5,"type":15,"typeLabel":16,"stem":577,"options":578,"answer":20,"analysis":33},1023506,"某配电装置的母联间隔如图3所示，请依据此图回答回题。 如该配电装置所在区域的海拔为1800m，图中Z值应为（）。",[579,581,583,585],{"key":20,"text":580,"correct":22},"3.96m；",{"key":24,"text":582,"correct":26},"3.80m；",{"key":28,"text":584,"correct":26},"4.16m；",{"key":31,"text":586,"correct":26},"4.04m。",{"id":588,"libraryId":5,"type":15,"typeLabel":16,"stem":589,"options":590,"answer":28,"analysis":33},1023507,"某电厂为220kV送出，220kV单相短路电流最大，为46.449kA,此时入地短路电流为28.345k A，短路的等效持续时间为0.2s，接地网为复合接地网，水平接地极为镀锌扁钢，垂直接地极为50X50X5的角钢。厂区土壤比较潮湿。 接地网总面积：S=406010m2, 水平接地体埋深：h=1.Om； 接地网边缘边线总长：L0=3820m； 水平接地体总长：L=22900m, 雷季中无雨水时，实测土壤电阻率：ρ0=55.4Ω?m； 季节系数为1.2~1.45，土壤较银时取大值； 地网设计寿命30年。 该接地网的接地电阻值是（）（以简化公式计算）。",[591,593,595,597],{"key":20,"text":592,"correct":26},"0.043Ω；",{"key":24,"text":594,"correct":26},"0.054Ω；",{"key":28,"text":596,"correct":22},"0.063Ω；",{"key":31,"text":598,"correct":26},"0.071Ω。",{"id":600,"libraryId":5,"type":15,"typeLabel":16,"stem":601,"options":602,"answer":31,"analysis":33},1023508,"某电厂为220kV送出，220kV单相短路电流最大，为46.449kA,此时入地短路电流为28.345k A，短路的等效持续时间为0.2s，接地网为复合接地网，水平接地极为镀锌扁钢，垂直接地极为50X50X5的角钢。厂区土壤比较潮湿。 接地网总面积：S=406010m2, 水平接地体埋深：h=1.Om； 接地网边缘边线总长：L0=3820m； 水平接地体总长：L=22900m, 雷季中无雨水时，实测土壤电阻率：ρ0=55.4Ω?m； 季节系数为1.2~1.45，土壤较银时取大值； 地网设计寿命30年。 假定该电厂升压站区域接地网的接地电阻值为0.12Ω,其余区域接地网的接地电阻为0.2Ω，计算用的最大接触电位差系数为Kmax=O.15，试计算升压站区域接地网地表面的最大接触电位差应为（）。",[603,605,607,609],{"key":20,"text":604,"correct":26},"1361V；",{"key":24,"text":606,"correct":26},"850V；",{"key":28,"text":608,"correct":26},"510V；",{"key":31,"text":610,"correct":22},"319V。",[612,615,618,621,624,627],{"id":15,"name":613,"category":7,"favorite":614},"领导干部任职前廉政法规知识测试题",92,{"id":616,"name":617,"category":7,"favorite":15},595,"建筑结构与设备",{"id":619,"name":620,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":622,"name":623,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":625,"name":626,"category":7,"favorite":8},534,"BIM工程师",{"id":628,"name":626,"category":7,"favorite":8},535]