[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-751-33":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":614},{"id":5,"name":6,"category":7,"favorite":8},751,"电气工程师发输变电专业","建筑工程",0,33,50,2670,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,334,346,358,370,382,394,406,418,430,442,454,466,478,490,502,514,526,538,550,560,572,584,593,605],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1023357,1,"单选题","某大型发电厂采用500kV电压等级，并经两回输电线路（线路主要数据：2X350km,LGJ-4X400mm2,每公里电抗为0.28Ω）向较强的受端电力系统送电，为了缩短输电线路的电气距离，以提高线路的输电能力和电力系统稳定性，根据规划论证决定在该输电工程中采用串联电容器补偿技术。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","过多（或过高）的串联电容补偿会引起发电机空载时自励磁现象，在某种运行方式下还将产生次同步谐振。根据《电力系统电压和无功电力技术导则》一般宜选用串联电容器补偿度不宜大于（）。",true,{"key":24,"text":25,"correct":26},"B","50%；",false,{"key":28,"text":29,"correct":26},"C","60%； C90%；",{"key":31,"text":32,"correct":26},"D","70%。","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1023358,"某大型发电厂采用500kV电压等级，并经两回输电线路（线路主要数据：2X350km,LGJ-4X400mm2,每公里电抗为0.28Ω）向较强的受端电力系统送电，为了缩短输电线路的电气距离，以提高线路的输电能力和电力系统稳定性，根据规划论证决定在该输电工程中采用串联电容器补偿技术。 如不考虑其他因素影响，当串联电容器补偿度取50%时，串联电容器装置总容抗（Xc）是（）。",[38,40,42,44],{"key":20,"text":39,"correct":26},"98Ω；",{"key":24,"text":41,"correct":22},"49Ω；",{"key":28,"text":43,"correct":26},"55Ω；",{"key":31,"text":45,"correct":26},"65Ω。",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1023359,"已知某500kV受端地区系统，由于电源不足需要从外区经较长的500kV线路输入有功功率约1000MW,请分析回答以下问题： 受端系统无功设备配置原则，以下（）是不对的。",[50,52,54,56],{"key":20,"text":51,"correct":22},"应按输入有功功率由500kV电两配里无功补偿设备；",{"key":24,"text":53,"correct":26},"应按输入有功功率在受端系统相应配里无功补後设备；",{"key":28,"text":55,"correct":26},"应按输入有功功率的40%在受端系统相应配里无功补楼设备；",{"key":31,"text":57,"correct":26},"应按输入有功功率的50%在受端系统相应配置无功补偿设备。",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},1023360,"已知某500kV受端地区系统，由于电源不足需要从外区经较长的500kV线路输入有功功率约1000MW,请分析回答以下问题： 受端系统如果按输入有功功率相应配置的无功补偿设备，其安装地点应选择以下（）方案.",[62,64,66,68],{"key":20,"text":63,"correct":26},"安装在500kV变电所高压侧；",{"key":24,"text":65,"correct":26},"安装在500kV变电所220kV侧；",{"key":28,"text":67,"correct":26},"安装在受端系统某个220kV变电所；",{"key":31,"text":69,"correct":22},"分别安装在由其受端系统供电的220kV及以下变电所中。",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1023361,"已知某500kV受端地区系统，由于电源不足需要从外区经较长的500kV线路输入有功功率约1000MW,请分析回答以下问题： 受端系统应配置无功补偿设备总容量，下面（）不符合《电力系统电压和无功电力技术导则》（SD325—1989）要求。",[74,76,78,80],{"key":20,"text":75,"correct":22},"600Mvar；",{"key":24,"text":77,"correct":26},"450Mvar；",{"key":28,"text":79,"correct":26},"400Mvar；",{"key":31,"text":81,"correct":26},"500Mvar。",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},1023362,"某500kV输电线路根据电气计算分析：500kV断路器变电所侧和线路侧的工频过电压倍数为最高相电压的1.3倍和1.4倍以下，但潜供电流大于12A以上，不能满足快速单相重合闸要求，需要考虑装设500kV高压并联电抗器。 在下列（）情况时不应该考虑装设髙压并联电抗器。",[86,88,90,92],{"key":20,"text":87,"correct":26},"线路断路器变电所侧和线路倒的工频过电压分别超过电网最高相电压的1.3倍和1.4倍时，需要采用快速单相重合闸保持系统稳定时；",{"key":24,"text":89,"correct":26},"发电厂和电网因无功平衡需要，而又不便装设低压并联电抗器时；",{"key":28,"text":91,"correct":26},"防止发电机自励磁和系统同期并列操作需要时；",{"key":31,"text":93,"correct":22},"限制电力系统短路电流需要时。",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},1023363,"某500kV输电线路根据电气计算分析：500kV断路器变电所侧和线路侧的工频过电压倍数为最高相电压的1.3倍和1.4倍以下，但潜供电流大于12A以上，不能满足快速单相重合闸要求，需要考虑装设500kV高压并联电抗器。 采用装设高压并联电抗器措施可以降低本500kV输电线路的潜供电流水平，以实现快速单相重合闸保持系统稳定，下面对髙压并联电抗器（）说法是正确的。",[98,100,102,104],{"key":20,"text":99,"correct":26},"应装设高压并联电抗器；",{"key":24,"text":101,"correct":26},"应装设中性点直接接地的高压并联电抗器；",{"key":28,"text":103,"correct":26},"应装设中性点经小电阻接地的高压并联电抗器；",{"key":31,"text":105,"correct":22},"应装设中性点经小电抗器接地并能补佳线路相间分布电容的高压并联电抗器。",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},1023365,"已知某发电厂220kV母线在正常运行方式下电压变动范围为（225. 5~237.6）kV,在事故运行方式下最低运行电压为214,5kV。 本电厂220kV母线在亊故运行方式到正常运行方式时实际电压偏差范围是（）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"-2.5%~+8.0%；",{"key":24,"text":113,"correct":26},"+2.5%~+8.0%；",{"key":28,"text":115,"correct":26},"-2.5%~+2.5%；",{"key":31,"text":117,"correct":26},"0%~+8,0%。",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":28,"analysis":33},1023366,"提高电力系统稳定水平的根本办法是合理加强电网结构，以及采用合适的提高系统稳定的措施。因此，在系统设计中应根据系统的不同特点，对电网结构建设提出要求，并采用合理的稳定措施以达到《电力系统安全稳定导则》（DL755—2001）、《电力系统设计技术规程》（SD131—1984试行）的要求。 合理的电网结构不应满足以下（）基本要求。",[122,124,126,128],{"key":20,"text":123,"correct":26},"具有一定的灵活性，并能适应系统发展的要求；",{"key":24,"text":125,"correct":26},"有较大的抗扰动能力；任一元件无故障断开，不致使其他元件超过规定的亊故过负荷和电压允许偏差的要求；",{"key":28,"text":127,"correct":22},"多重故障下不采用措施应能保持电力系统的稳定运行；",{"key":31,"text":129,"correct":26},"满足分层和分区的原则；能合理控制系统短路电流.",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":31,"analysis":33},1023367,"提高电力系统稳定水平的根本办法是合理加强电网结构，以及采用合适的提高系统稳定的措施。因此，在系统设计中应根据系统的不同特点，对电网结构建设提出要求，并采用合理的稳定措施以达到《电力系统安全稳定导则》（DL755—2001）、《电力系统设计技术规程》（SD131—1984试行）的要求。 以下控制系统短路电流的措施中，（）是不对的，",[134,136,138,140],{"key":20,"text":135,"correct":26},"将电网解环运行；",{"key":24,"text":137,"correct":26},"增大系统的零序阻抗；加大变压器的阻抗；提高电力系统的电压等级；",{"key":28,"text":139,"correct":26},"采用直流输电或直流联网；",{"key":31,"text":141,"correct":22},"装设高压并联电抗器。",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":31,"analysis":33},1023368,"提高电力系统稳定水平的根本办法是合理加强电网结构，以及采用合适的提高系统稳定的措施。因此，在系统设计中应根据系统的不同特点，对电网结构建设提出要求，并采用合理的稳定措施以达到《电力系统安全稳定导则》（DL755—2001）、《电力系统设计技术规程》（SD131—1984试行）的要求。 下面不是用来提高静态稳定的措施有（）。",[146,148,150,152],{"key":20,"text":147,"correct":26},"提髙输电线路的电压等级、输电线路釆用串联电容补偿装置；",{"key":24,"text":149,"correct":26},"采用紧凑型输电线路；",{"key":28,"text":151,"correct":26},"同步发电机采用强力式自动励磁调节装里，在输电线路受端及中间变电所装设调相机，采用可控电抗器和静止无功补偿装置；",{"key":31,"text":153,"correct":22},"减少电厂发电机开机台数。",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":20,"analysis":33},1023369,"无功容性补偿容量不足将不能满足无功负荷的需要，使无功电源和无功负荷处于低电压的平衡状态下运行，由于电力系统运行电压水平低，给电力系统带来了一系列危害。 无功电源不足对电力系统的危害不正确的说法是（）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"电力系统頻率降低；",{"key":24,"text":161,"correct":26},"设备功率不足，电力系统损耗増加；",{"key":28,"text":163,"correct":26},"电气设备损坏；",{"key":31,"text":165,"correct":26},"电力系统稳定度降低。",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":31,"analysis":33},1023370,"无功容性补偿容量不足将不能满足无功负荷的需要，使无功电源和无功负荷处于低电压的平衡状态下运行，由于电力系统运行电压水平低，给电力系统带来了一系列危害。 无功容性补偿容量不足会使电力系统稳定度降低，主要原因不对的（）。",[170,172,174,176],{"key":20,"text":171,"correct":26},"迫使发电机无功功率加大（一般距负荷中心较远的发电机）；",{"key":24,"text":173,"correct":26},"使送电线路受端系统运行电压被迫降低；",{"key":28,"text":175,"correct":26},"如送电线珞再发生故障时，受端系统因无功电源不足会使运行电压进一步降低，如果电压低到额定电压的70%以下，就可能引起电压崩溃亊故，造成大面积停电；",{"key":31,"text":177,"correct":22},"并联电抗器因运行电压水平低其消耗的无功功率増加。",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":31,"analysis":33},1023371,"电力系统的无功负荷（感性）和无功电源（容性），在电力负荷高峰和低谷运行时都应采用分层（电压）和分区（供电区）基本平衡的原则进行配置，满足无功负荷的需要，保持系统运行电压水平。 下列（）不是电力系统无功负荷。",[182,184,186,188],{"key":20,"text":183,"correct":26},"异步电动机及变压器和串、并联电抗器无功损耗；",{"key":24,"text":185,"correct":26},"高压直流输电换流装置无功消耗；",{"key":28,"text":187,"correct":26},"输电线珞无功损耗；",{"key":31,"text":189,"correct":22},"电阻性用电设备。",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":28,"analysis":33},1023372,"电力系统的无功负荷（感性）和无功电源（容性），在电力负荷高峰和低谷运行时都应采用分层（电压）和分区（供电区）基本平衡的原则进行配置，满足无功负荷的需要，保持系统运行电压水平。 变电所在确定无功容性补偿装置总容量时，原则上不考虑的是（）。",[194,196,198,200],{"key":20,"text":195,"correct":26},"变压器助磁“固定”空载无功损耗；",{"key":24,"text":197,"correct":26},"变压器统组可变有载无功损耗；",{"key":28,"text":199,"correct":22},"变压器绕组电阻中的无功损耗；",{"key":31,"text":201,"correct":26},"与变电所连接的电网线路部分的无功损耗。",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":31,"analysis":33},1023373,"已知某电厂发电机经220kV输电线路接于受端无限大系统母线，已归算到基准值的标么值参数如下（见图16-1）： δ——相量E与U之间的夹角（≤90°）。 系统的综合电抗标么值（XΣ）是（）。",[206,208,210,212],{"key":20,"text":207,"correct":26},"0.982；",{"key":24,"text":209,"correct":26},"1.120；",{"key":28,"text":211,"correct":26},"1.364；",{"key":31,"text":213,"correct":22},"1.486。",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":20,"analysis":33},1023374,"已知某电厂发电机经220kV输电线路接于受端无限大系统母线，已归算到基准值的标么值参数如下（见图16-1）： δ——相量E与U之间的夹角（≤90°）。 发电机电动势 （E）是（ ）。",[218,220,222,224],{"key":20,"text":219,"correct":22},"1.9725；",{"key":24,"text":221,"correct":26},"1.8000；",{"key":28,"text":223,"correct":26},"1.7000；",{"key":31,"text":225,"correct":26},"1.6000。",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":24,"analysis":33},1023375,"已知某电厂发电机经220kV输电线路接于受端无限大系统母线，已归算到基准值的标么值参数如下（见图16-1）： δ——相量E与U之间的夹角（≤90°）。 静稳定理想功率极限（Pm）计算时5取（）。",[230,232,234,236],{"key":20,"text":231,"correct":26},"80°；",{"key":24,"text":233,"correct":22},"90°；",{"key":28,"text":235,"correct":26},"85°；",{"key":31,"text":237,"correct":26},"75°。",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":28,"analysis":33},1023376,"已知某电厂发电机经220kV输电线路接于受端无限大系统母线，已归算到基准值的标么值参数如下（见图16-1）： δ——相量E与U之间的夹角（≤90°）。 静稳定理想功率极限（Pm）标么值为（）。",[242,244,246,248],{"key":20,"text":243,"correct":26},"1.500；",{"key":24,"text":245,"correct":26},"1.400；",{"key":28,"text":247,"correct":22},"1.327；",{"key":31,"text":249,"correct":26},"1.200。",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":20,"analysis":33},1023377,"某大区电力系统2010年规划有关数据如下： 最髙供电负荷（P G）：55500MW（控制月份12月，未计厂用电和线损） 各项备用率：取最高发电负荷的（％）值 负荷备用 2% 事故备用 10% 检修备用 8% 控制月份： 受阻容量（Psh）100MW 空闲容量（Pk）2000MW 厂用电、线损率（％）：7.5% 经过电力平衡计算，控制月份电力供需正好平衡。 该电力系统2010年最高发电负荷（Pf）是（ ）。",[254,256,258,260],{"key":20,"text":255,"correct":22},"60000MW,",{"key":24,"text":257,"correct":26},"65000MW；",{"key":28,"text":259,"correct":26},"55000MW；",{"key":31,"text":261,"correct":26},"70000MW.",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":31,"analysis":33},1023378,"某大区电力系统2010年规划有关数据如下： 最髙供电负荷（P G）：55500MW（控制月份12月，未计厂用电和线损） 各项备用率：取最高发电负荷的（％）值 负荷备用 2% 事故备用 10% 检修备用 8% 控制月份： 受阻容量（Psh）100MW 空闲容量（Pk）2000MW 厂用电、线损率（％）：7.5% 经过电力平衡计算，控制月份电力供需正好平衡。 该电力系统控制月份总备用容量（Pb）是（）。",[266,268,270,272],{"key":20,"text":267,"correct":26},"11000MW；",{"key":24,"text":269,"correct":26},"14000MW；",{"key":28,"text":271,"correct":26},"13000MW；",{"key":31,"text":273,"correct":22},"12000MW。",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":20,"analysis":33},1023379,"某大区电力系统2010年规划有关数据如下： 最髙供电负荷（P G）：55500MW（控制月份12月，未计厂用电和线损） 各项备用率：取最高发电负荷的（％）值 负荷备用 2% 事故备用 10% 检修备用 8% 控制月份： 受阻容量（Psh）100MW 空闲容量（Pk）2000MW 厂用电、线损率（％）：7.5% 经过电力平衡计算，控制月份电力供需正好平衡。 本电力系统控制月份总装机容量是（）。",[278,280,282,284],{"key":20,"text":279,"correct":22},"74100MW；",{"key":24,"text":281,"correct":26},"72100MW；",{"key":28,"text":283,"correct":26},"70000MW,",{"key":31,"text":285,"correct":26},"75000MW。",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":20,"analysis":33},1023380,"某500kV输变电工程建设主要数据假定如下： 工程总投资（Z）：30000万元（其中线路、变电所各50%） 工程经济使用年限（n）：25年 检修、维护费率：线路2.2%、变电所4.2% 电力工业投资回收率（i）：10% 方案年电能损失费用（u2）：1350万元 注：因本工程建设时间短，投资和年运行费用不霈要折算。 年检修维护费用（u1）是（）。",[290,292,294,296],{"key":20,"text":291,"correct":22},"960万元；",{"key":24,"text":293,"correct":26},"900万元；",{"key":28,"text":295,"correct":26},"850万元；",{"key":31,"text":297,"correct":26},"1000万元",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":24,"analysis":33},1023381,"某500kV输变电工程建设主要数据假定如下： 工程总投资（Z）：30000万元（其中线路、变电所各50%） 工程经济使用年限（n）：25年 检修、维护费率：线路2.2%、变电所4.2% 电力工业投资回收率（i）：10% 方案年电能损失费用（u2）：1350万元 注：因本工程建设时间短，投资和年运行费用不霈要折算。 年运行费用（u）是（）。",[302,304,306,308],{"key":20,"text":303,"correct":26},"2000万元；",{"key":24,"text":305,"correct":22},"2310万元；",{"key":28,"text":307,"correct":26},"2500万元；",{"key":31,"text":309,"correct":26},"1800万元。",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":28,"analysis":33},1023382,"某500kV输变电工程建设主要数据假定如下： 工程总投资（Z）：30000万元（其中线路、变电所各50%） 工程经济使用年限（n）：25年 检修、维护费率：线路2.2%、变电所4.2% 电力工业投资回收率（i）：10% 方案年电能损失费用（u2）：1350万元 注：因本工程建设时间短，投资和年运行费用不霈要折算。 投资（或资金）回收系数（。是（）。",[314,316,318,320],{"key":20,"text":315,"correct":26},"0.13；",{"key":24,"text":317,"correct":26},"0.10；",{"key":28,"text":319,"correct":22},"0.11；",{"key":31,"text":321,"correct":26},"0.12。",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":20,"analysis":33},1023383,"某500kV输变电工程建设主要数据假定如下： 工程总投资（Z）：30000万元（其中线路、变电所各50%） 工程经济使用年限（n）：25年 检修、维护费率：线路2.2%、变电所4.2% 电力工业投资回收率（i）：10% 方案年电能损失费用（u2）：1350万元 注：因本工程建设时间短，投资和年运行费用不霈要折算。 方案年费用 （F）是（）。",[326,328,330,332],{"key":20,"text":327,"correct":22},"5610万元；",{"key":24,"text":329,"correct":26},"5200万元；",{"key":28,"text":331,"correct":26},"5000万元；",{"key":31,"text":333,"correct":26},"6000万元。",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":31,"analysis":33},1023384,"电压是电能质量的重要指标。电压质量对电力系统的安全和经济运行，对保证用户安全生产和产品质量以及电气设备的安全和寿命有重要的影响。根据《电力系统设计技术规程》，回答220kV及以上电网的电压质量标准有关问题。 枢纽变电所二次侧母线的运行电压水平不应按（）要求来控制。",[338,340,342,344],{"key":20,"text":339,"correct":26},"变电所的（地理）位里；",{"key":24,"text":341,"correct":26},"电网額定电压的1.0~1.1倍；在日最大、最小负荷情况下其运行电压控制水平的波动范围（或波动幅度）应不超过10%；",{"key":28,"text":343,"correct":26},"亊故后不应低于电网頦定电压的0.95倍；",{"key":31,"text":345,"correct":22},"电网短路电流水平的大小。",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":31,"analysis":33},1023385,"电压是电能质量的重要指标。电压质量对电力系统的安全和经济运行，对保证用户安全生产和产品质量以及电气设备的安全和寿命有重要的影响。根据《电力系统设计技术规程》，回答220kV及以上电网的电压质量标准有关问题。 电网任一点的运行电压水平控制不合理的是（）。",[350,352,354,356],{"key":20,"text":351,"correct":26},"在任何情况下严禁超过电网最高工作电压；",{"key":24,"text":353,"correct":26},"变电所一次例（注：一般指高压例）母线的运行电压正常情况下不应低于电网額定电压的0.95~1.00倍；",{"key":28,"text":355,"correct":26},"处于电网受电终端的变电所可取“B\"项的低值；",{"key":31,"text":357,"correct":22},"在电力系统特殊运行方式下可超过电网最高工作电压。",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":24,"analysis":33},1023386,"变电所装有两台及以上主变压器，当其中一台事故停运后，其余主变压器的容量应保证该变电所全部负荷（％值）的（）。",[362,364,366,368],{"key":20,"text":363,"correct":26},"80%；",{"key":24,"text":365,"correct":22},"70%；",{"key":28,"text":367,"correct":26},"60%；",{"key":31,"text":369,"correct":26},"50%。",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":24,"analysis":33},1023387,"直流输电技术有很多优点，目前我国已开始积极推广使用。以下关于直流输电主要优点中（）是不对的。",[374,376,378,380],{"key":20,"text":375,"correct":26},"直流线路造价低；",{"key":24,"text":377,"correct":22},"换流站造价较便宜；",{"key":28,"text":379,"correct":26},"没有系统德定问題，功率供节调节快速、运行可靠；",{"key":31,"text":381,"correct":26},"可限制短路电流。",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":28,"analysis":33},1023388,"架空线路在正常运行方式下的最大输电容量符合经济电流密度要求，铝导线在最大负荷年利用小时5000h以上的经济电流密度应选（）。",[386,388,390,392],{"key":20,"text":387,"correct":26},"1.65A\u002Fmm2；",{"key":24,"text":389,"correct":26},"1.15A\u002Fmm2；",{"key":28,"text":391,"correct":22},"0.90A\u002Fmm2；",{"key":31,"text":393,"correct":26},"3.00A\u002Fmm2。",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":31,"analysis":33},1023389,"以下是电力系统规划设计方案经济比较主要原则之一，其中（）是不对的。",[398,400,402,404],{"key":20,"text":399,"correct":26},"符合我国能源和电力建设的方针政策；",{"key":24,"text":401,"correct":26},"方案技术上可行，具有可比性；",{"key":28,"text":403,"correct":26},"一般宜考虑时间因素；",{"key":31,"text":405,"correct":22},"不计算电能损失费。",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":31,"analysis":33},1023390,"选择电力系统事故备用容量的原则是（）。",[410,412,414,416],{"key":20,"text":411,"correct":26},"系统最大发电负荷的10%左右；",{"key":24,"text":413,"correct":26},"不小于系统一台最大的单机容量；",{"key":28,"text":415,"correct":26},"应小于系统一台最大的单机容量；",{"key":31,"text":417,"correct":22},"系统最大发电负荷的10%左右，但不小于系统一台最大的单机容量，",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":20,"analysis":33},1023391,"电网测酣的主要内容不包括（）。",[422,424,426,428],{"key":20,"text":423,"correct":22},"电源建设方案论证；",{"key":24,"text":425,"correct":26},"确定输电方式；",{"key":28,"text":427,"correct":26},"选择电网电压等级；",{"key":31,"text":429,"correct":26},"确定变电所布局和规模、确定电网结构。",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":24,"analysis":33},1023392,"下面表示电力系统装机容量的组成中，不对的是（）。",[434,436,438,440],{"key":20,"text":435,"correct":26},"装机容量=系统中各类发电厂发电机额定容量的总和；",{"key":24,"text":437,"correct":22},"装机容量=必须容量+工作容量+重复容量+受阻容量；",{"key":28,"text":439,"correct":26},"装机容量=必须容量+重复容量+受阻容量；",{"key":31,"text":441,"correct":26},"装机容量=工作容量+备用容量+重复容量+受阻容量。",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":20,"analysis":33},1023393,"某省在进行电力发展“十五”规划中，经调查收集到国民经济历史统计资料（国内生产总值GDP、1990年价格〉如下： ①1990年为260亿元f②1990~1995年平均增长率为8.5%；③2000年为600亿元；④2001年比2000年增长9.0%；⑤2000~2003年平均增长率为9.5%。 1995年实际国内生产总值是（）。",[446,448,450,452],{"key":20,"text":447,"correct":22},"391亿元；",{"key":24,"text":449,"correct":26},"370亿元；",{"key":28,"text":451,"correct":26},"420亿元；",{"key":31,"text":453,"correct":26},"450亿元。",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":24,"analysis":33},1023394,"某省在进行电力发展“十五”规划中，经调查收集到国民经济历史统计资料（国内生产总值GDP、1990年价格〉如下： ①1990年为260亿元f②1990~1995年平均增长率为8.5%；③2000年为600亿元；④2001年比2000年增长9.0%；⑤2000~2003年平均增长率为9.5%。 2001年实际国内生产总值是（）。",[458,460,462,464],{"key":20,"text":459,"correct":26},"674亿元；",{"key":24,"text":461,"correct":22},"654亿元；",{"key":28,"text":463,"correct":26},"634亿元；",{"key":31,"text":465,"correct":26},"614亿元。",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":31,"analysis":33},1023395,"某省在进行电力发展“十五”规划中，经调查收集到国民经济历史统计资料（国内生产总值GDP、1990年价格〉如下： ①1990年为260亿元f②1990~1995年平均增长率为8.5%；③2000年为600亿元；④2001年比2000年增长9.0%；⑤2000~2003年平均增长率为9.5%。 2003年实际国内生产总值是（）。",[470,472,474,476],{"key":20,"text":471,"correct":26},"828亿元；",{"key":24,"text":473,"correct":26},"808亿元；",{"key":28,"text":475,"correct":26},"768亿元；",{"key":31,"text":477,"correct":22},"788亿元。",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":20,"analysis":33},1023396,"某省在进行电力发展“十五”规划中，经调查收集到国民经济历史统计资料（国内生产总值GDP、1990年价格〉如下： ①1990年为260亿元f②1990~1995年平均增长率为8.5%；③2000年为600亿元；④2001年比2000年增长9.0%；⑤2000~2003年平均增长率为9.5%。 1995~2000年国内生产总值平均增长率是（）。",[482,484,486,488],{"key":20,"text":483,"correct":22},"8.9%；",{"key":24,"text":485,"correct":26},"8.5%；",{"key":28,"text":487,"correct":26},"9.5%；",{"key":31,"text":489,"correct":26},"8.0%。",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":20,"analysis":33},1023397,"为了编制“十一五”期电力发展规划，某电力公司提供的“八五”、“九五”期和“十五”期前三年该省电力系统资料如下，请分析计算有关数据。 ①1990年全社会用电量（注：以发电量表示，以下同）为91亿kWh，最髙发电负荷为1400MW； ②1995年全社会用电量为160亿kWh，年最高发电负荷利用小时数为6400h； ③1995~2000年平均增长率电量为9. 5%,电力为10%； ④2000~2003年平均增长率电量为11. 5%，电力为12.0%。 1990年最高发电负荷利用小时数是（）。",[494,496,498,500],{"key":20,"text":495,"correct":22},"6500h；",{"key":24,"text":497,"correct":26},"6000h；",{"key":28,"text":499,"correct":26},"5500h；",{"key":31,"text":501,"correct":26},"7000h。",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":28,"analysis":33},1023398,"为了编制“十一五”期电力发展规划，某电力公司提供的“八五”、“九五”期和“十五”期前三年该省电力系统资料如下，请分析计算有关数据。 ①1990年全社会用电量（注：以发电量表示，以下同）为91亿kWh，最髙发电负荷为1400MW； ②1995年全社会用电量为160亿kWh，年最高发电负荷利用小时数为6400h； ③1995~2000年平均增长率电量为9. 5%,电力为10%； ④2000~2003年平均增长率电量为11. 5%，电力为12.0%。 1995年最高发电负荷是（）。",[506,508,510,512],{"key":20,"text":507,"correct":26},"2300MW；",{"key":24,"text":509,"correct":26},"2400MW；",{"key":28,"text":511,"correct":22},"2500MW；",{"key":31,"text":513,"correct":26},"2600MW。",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":31,"analysis":33},1023399,"为了编制“十一五”期电力发展规划，某电力公司提供的“八五”、“九五”期和“十五”期前三年该省电力系统资料如下，请分析计算有关数据。 ①1990年全社会用电量（注：以发电量表示，以下同）为91亿kWh，最髙发电负荷为1400MW； ②1995年全社会用电量为160亿kWh，年最高发电负荷利用小时数为6400h； ③1995~2000年平均增长率电量为9. 5%,电力为10%； ④2000~2003年平均增长率电量为11. 5%，电力为12.0%。 2000年全社会用电量和最高发电负荷是（）。",[518,520,522,524],{"key":20,"text":519,"correct":26},"270亿kWh和4320MW；",{"key":24,"text":521,"correct":26},"260亿kWh和4160MW；",{"key":28,"text":523,"correct":26},"245亿kWh和3920MW；",{"key":31,"text":525,"correct":22},"252亿kWh和4026MW。",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":20,"analysis":33},1023400,"为了编制“十一五”期电力发展规划，某电力公司提供的“八五”、“九五”期和“十五”期前三年该省电力系统资料如下，请分析计算有关数据。 ①1990年全社会用电量（注：以发电量表示，以下同）为91亿kWh，最髙发电负荷为1400MW； ②1995年全社会用电量为160亿kWh，年最高发电负荷利用小时数为6400h； ③1995~2000年平均增长率电量为9. 5%,电力为10%； ④2000~2003年平均增长率电量为11. 5%，电力为12.0%。 2003年最高发电负荷利用率δ是（）。",[530,532,534,536],{"key":20,"text":531,"correct":22},"0.70；",{"key":24,"text":533,"correct":26},"0.80；",{"key":28,"text":535,"correct":26},"0.65；",{"key":31,"text":537,"correct":26},"0.60。",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":20,"analysis":33},1023401,"已知某统调电力系统2000年全社会用电量为500亿kWh, 2010年前电量平均增长率取7.2%,国内生产总值平均增长率取8%,电力弹性系数取0.9。 按电量平均增长率预测2010年全社会用电量是（）。",[542,544,546,548],{"key":20,"text":543,"correct":22},"1002亿kWh；",{"key":24,"text":545,"correct":26},"1050亿kWh；",{"key":28,"text":547,"correct":26},"1100亿kWh；",{"key":31,"text":549,"correct":26},"952亿kWh。",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":28,"analysis":33},1023402,"已知某统调电力系统2000年全社会用电量为500亿kWh, 2010年前电量平均增长率取7.2%,国内生产总值平均增长率取8%,电力弹性系数取0.9。 按电力弹性系数法预测2010年全社会用电量是（）。",[554,556,557,558],{"key":20,"text":555,"correct":26},"952亿kWh；",{"key":24,"text":547,"correct":26},{"key":28,"text":543,"correct":22},{"key":31,"text":559,"correct":26},"1050亿kWh。",{"id":561,"libraryId":5,"type":15,"typeLabel":16,"stem":562,"options":563,"answer":20,"analysis":33},1023403,"某电力系统2010年丰水期最髙发电负荷20000MW，届时系统实际装机容量水电15000MW、火电10000MW、最大单机容量1000MW，负荷备用率取3%、事故备用率10%,经过电力平衡计算其工作容量由水电承担13000MW、火电承担7000MW。 你认为负荷备用应该是（）。",[564,566,568,570],{"key":20,"text":565,"correct":22},"600MW；",{"key":24,"text":567,"correct":26},"450MW；",{"key":28,"text":569,"correct":26},"750MW；",{"key":31,"text":571,"correct":26},"300MW。",{"id":573,"libraryId":5,"type":15,"typeLabel":16,"stem":574,"options":575,"answer":24,"analysis":33},1023404,"某电力系统2010年丰水期最髙发电负荷20000MW，届时系统实际装机容量水电15000MW、火电10000MW、最大单机容量1000MW，负荷备用率取3%、事故备用率10%,经过电力平衡计算其工作容量由水电承担13000MW、火电承担7000MW。 事故备用容量（）是正确的。",[576,578,580,582],{"key":20,"text":577,"correct":26},"1500MW；",{"key":24,"text":579,"correct":22},"2000MW；",{"key":28,"text":581,"correct":26},"1000MW；",{"key":31,"text":583,"correct":26},"2500MW。",{"id":585,"libraryId":5,"type":15,"typeLabel":16,"stem":586,"options":587,"answer":20,"analysis":33},1023405,"某电力系统2010年丰水期最髙发电负荷20000MW，届时系统实际装机容量水电15000MW、火电10000MW、最大单机容量1000MW，负荷备用率取3%、事故备用率10%,经过电力平衡计算其工作容量由水电承担13000MW、火电承担7000MW。 火电厂所承担的负荷备用容量一般该选（）。",[588,590,591,592],{"key":20,"text":589,"correct":22},"0MW；",{"key":24,"text":565,"correct":26},{"key":28,"text":567,"correct":26},{"key":31,"text":571,"correct":26},{"id":594,"libraryId":5,"type":15,"typeLabel":16,"stem":595,"options":596,"answer":24,"analysis":33},1023406,"某电力系统2010年丰水期最髙发电负荷20000MW，届时系统实际装机容量水电15000MW、火电10000MW、最大单机容量1000MW，负荷备用率取3%、事故备用率10%,经过电力平衡计算其工作容量由水电承担13000MW、火电承担7000MW。 水电站承担的事故备用容量是（）。",[597,599,601,603],{"key":20,"text":598,"correct":26},"1200MW；",{"key":24,"text":600,"correct":22},"1300MW；",{"key":28,"text":602,"correct":26},"800MW；",{"key":31,"text":604,"correct":26},"700MW。",{"id":606,"libraryId":5,"type":15,"typeLabel":16,"stem":607,"options":608,"answer":28,"analysis":33},1023407,"某地区电力系统远景规划预测的最髙发电负荷为15000MW,负荷备用率取2%、事故备用率取10%、计划检修按8%，在扣除200MW受阻装机容量后，经电力平衡初步计算为供需平衡，可满足用电要求。 本系统总备用容量是（）。",[609,610,611,613],{"key":20,"text":598,"correct":26},{"key":24,"text":577,"correct":26},{"key":28,"text":612,"correct":22},"3000MW；",{"key":31,"text":571,"correct":26},[615,618,621,624,627,630],{"id":15,"name":616,"category":7,"favorite":617},"领导干部任职前廉政法规知识测试题",92,{"id":619,"name":620,"category":7,"favorite":15},595,"建筑结构与设备",{"id":622,"name":623,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":625,"name":626,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":628,"name":629,"category":7,"favorite":8},534,"BIM工程师",{"id":631,"name":629,"category":7,"favorite":8},535]