[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-751-32":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":589},{"id":5,"name":6,"category":7,"favorite":8},751,"电气工程师发输变电专业","建筑工程",0,32,50,2670,[13,34,46,58,70,82,90,101,112,123,134,143,152,161,171,181,191,203,213,225,237,249,257,269,281,293,305,317,329,341,353,365,377,389,401,413,425,437,449,461,473,485,497,509,521,533,541,553,565,577],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1023307,1,"单选题","送电线路的设计气象条件是根据沿线气象资料和附近地区已有线路的运行经验。按规定的重现期确定。 110~330kV线路\u002F大跨越规定的重现期为（）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","10年\u002F20年,；",false,{"key":24,"text":25,"correct":26},"B","15年\u002F30年；",true,{"key":28,"text":29,"correct":22},"C","20年\u002F40年；",{"key":31,"text":32,"correct":22},"D","0.25年\u002F50年.","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1023308,"某220kV线路的某耐张段，代表档距430m,γ1=3.4X1O-2 N\u002F（m?mm2）,已知导线最大弧垂发生在最高气温，其应力为60N\u002Fmm2。 平地，档距400m，两侧塔等高，通过非居民区，铁塔呼称髙（下横担对地高度）应不小于（）M。",[38,40,42,44],{"key":20,"text":39,"correct":22},"17；",{"key":24,"text":41,"correct":26},"21；",{"key":28,"text":43,"correct":22},"25；",{"key":31,"text":45,"correct":22},"29。",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1023309,"某220kV线路的某耐张段，代表档距430m,γ1=3.4X1O-2 N\u002F（m?mm2）,已知导线最大弧垂发生在最高气温，其应力为60N\u002Fmm2。 同上，两侧塔不等髙，呼称高相差8m,各应不小于（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":26},"17\u002F25；",{"key":24,"text":53,"correct":22},"13\u002F21；",{"key":28,"text":55,"correct":22},"21\u002F29；",{"key":31,"text":57,"correct":22},"25\u002F33。",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},1023310,"某220kV线路的某耐张段，代表档距430m,γ1=3.4X1O-2 N\u002F（m?mm2）,已知导线最大弧垂发生在最高气温，其应力为60N\u002Fmm2。 平地，档距300m，两侧塔等髙，但在档距中跨过髙1Om的配电线路，两侧铁塔呼称髙应不小于（）M。",[62,64,66,68],{"key":20,"text":63,"correct":22},"19；",{"key":24,"text":65,"correct":22},"23；",{"key":28,"text":67,"correct":26},"27；",{"key":31,"text":69,"correct":22},"31。",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1023311,"HEQ22髙频对称长途通信电缆与500kV输电线肿行接近，已知对称电缆远距离供电电压（简称远供）为270V，芯线对金属护套无人段试验电压为交流、1800V，试计算下列情况下该电信电缆危险影响允许值。 电信电缆远供采用“导线一大地\"制；电信电缆危险影响允许值为（）。",[74,76,78,80],{"key":20,"text":75,"correct":26},"1339V；",{"key":24,"text":77,"correct":22},"1080V；",{"key":28,"text":79,"correct":22},"1530V；",{"key":31,"text":81,"correct":22},"889V。",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":28,"analysis":33},1023312,"HEQ22髙频对称长途通信电缆与500kV输电线肿行接近，已知对称电缆远距离供电电压（简称远供）为270V，芯线对金属护套无人段试验电压为交流、1800V，试计算下列情况下该电信电缆危险影响允许值。 电信电缆无远供；电信电缆危险影响允许值为（）。",[86,87,88,89],{"key":20,"text":75,"correct":22},{"key":24,"text":77,"correct":22},{"key":28,"text":79,"correct":26},{"key":31,"text":81,"correct":22},{"id":91,"libraryId":5,"type":15,"typeLabel":16,"stem":92,"options":93,"answer":31,"analysis":33},1023313,"HEQ22髙频对称长途通信电缆与500kV输电线肿行接近，已知对称电缆远距离供电电压（简称远供）为270V，芯线对金属护套无人段试验电压为交流、1800V，试计算下列情况下该电信电缆危险影响允许值。",[94,96,97,99],{"key":20,"text":95,"correct":22},"电信电缆远供采用“导线一导线”制,电信电缆危险影响允许值为（）。",{"key":24,"text":75,"correct":22},{"key":28,"text":98,"correct":22},"1080V； C1530V；",{"key":31,"text":100,"correct":26},"1435V。",{"id":102,"libraryId":5,"type":15,"typeLabel":16,"stem":103,"options":104,"answer":31,"analysis":33},1023314,"送电线路与电信线路相对位置示意图及互感阻抗表如图15-1所示：请计算磁感应纵电动势（电磁综合屏蔽系数K 50=1）。 单相接地短路故障点在0点：最大磁感应纵电动势为（）。",[105,107,109,110],{"key":20,"text":106,"correct":22},"510V；",{"key":24,"text":108,"correct":22},"3090V；",{"key":28,"text":79,"correct":22},{"key":31,"text":111,"correct":26},"1039V。",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":24,"analysis":33},1023315,"送电线路与电信线路相对位置示意图及互感阻抗表如图15-1所示：请计算磁感应纵电动势（电磁综合屏蔽系数K 50=1）。 单相接地短路故障点在3点：最大磁感应纵电动势为（）。",[116,118,120,121],{"key":20,"text":117,"correct":22},"714V；",{"key":24,"text":119,"correct":26},"780V；",{"key":28,"text":79,"correct":22},{"key":31,"text":122,"correct":22},"510V。",{"id":124,"libraryId":5,"type":15,"typeLabel":16,"stem":125,"options":126,"answer":31,"analysis":33},1023316,"送电线路与电信线路相对位置示意图及互感阻抗表如图15-1所示：请计算磁感应纵电动势（电磁综合屏蔽系数K 50=1）。 单相接地短路故障点在6点：最大磁感应纵电动势为（ ）。",[127,129,131,132],{"key":20,"text":128,"correct":22},"1820V；",{"key":24,"text":130,"correct":22},"605V；",{"key":28,"text":79,"correct":22},{"key":31,"text":133,"correct":26},"824V。",{"id":135,"libraryId":5,"type":15,"typeLabel":16,"stem":136,"options":137,"answer":28,"analysis":33},1023317,"送电线路与电信线路相对位置示意图及互感阻抗表如图15-1所示：请计算磁感应纵电动势（电磁综合屏蔽系数K 50=1）。 比较以上各点短路计算，其最大磁感应纵电动势为（）。",[138,139,140,142],{"key":20,"text":128,"correct":22},{"key":24,"text":130,"correct":22},{"key":28,"text":141,"correct":26},"1030V；",{"key":31,"text":133,"correct":22},{"id":144,"libraryId":5,"type":15,"typeLabel":16,"stem":145,"options":146,"answer":31,"analysis":33},1023318,"送电线路与电信线路相对位置示意图如图15-2（电信线路系长途中继线、Ecd=1030V）,请按电信线路两端绝缘计算对地电压。 单相接地短路故障点在O点，C点对地电压为（）。",[147,148,149,150],{"key":20,"text":117,"correct":22},{"key":24,"text":119,"correct":22},{"key":28,"text":79,"correct":22},{"key":31,"text":151,"correct":26},"772.5V。",{"id":153,"libraryId":5,"type":15,"typeLabel":16,"stem":154,"options":155,"answer":28,"analysis":33},1023319,"送电线路与电信线路相对位置示意图如图15-2（电信线路系长途中继线、Ecd=1030V）,请按电信线路两端绝缘计算对地电压。 单相接地短路故障点在0点，D点对地电压为（）。",[156,157,158,160],{"key":20,"text":117,"correct":22},{"key":24,"text":119,"correct":22},{"key":28,"text":159,"correct":26},"257.5V；",{"key":31,"text":122,"correct":22},{"id":162,"libraryId":5,"type":15,"typeLabel":16,"stem":163,"options":164,"answer":24,"analysis":33},1023320,"已知光缆中带实芯锎线的直流试验电压为2000V,开通140Mb\u002Fs数字通信系统远供制式为“导线一导线”中性点接地制，且远供电压有300V或1300V两种电压，试计算光缆中各元件危险影响允许值。 有铜线光缆中，一般铜线的允许值为（）。",[165,167,169,170],{"key":20,"text":166,"correct":22},"1700V；",{"key":24,"text":168,"correct":26},"1200V；",{"key":28,"text":79,"correct":22},{"key":31,"text":122,"correct":22},{"id":172,"libraryId":5,"type":15,"typeLabel":16,"stem":173,"options":174,"answer":20,"analysis":33},1023321,"已知光缆中带实芯锎线的直流试验电压为2000V,开通140Mb\u002Fs数字通信系统远供制式为“导线一导线”中性点接地制，且远供电压有300V或1300V两种电压，试计算光缆中各元件危险影响允许值。 有铜线光缆中，远供回路（300V）锎线的允许值为（）。",[175,177,178,179],{"key":20,"text":176,"correct":26},"1094V；",{"key":24,"text":168,"correct":22},{"key":28,"text":79,"correct":22},{"key":31,"text":180,"correct":22},"1700V。",{"id":182,"libraryId":5,"type":15,"typeLabel":16,"stem":183,"options":184,"answer":28,"analysis":33},1023322,"已知光缆中带实芯锎线的直流试验电压为2000V,开通140Mb\u002Fs数字通信系统远供制式为“导线一导线”中性点接地制，且远供电压有300V或1300V两种电压，试计算光缆中各元件危险影响允许值。 有铜线光缆中，远供回路（1300V）铜线的允许值为（），",[185,186,187,189],{"key":20,"text":166,"correct":22},{"key":24,"text":168,"correct":22},{"key":28,"text":188,"correct":26},"740V；",{"key":31,"text":190,"correct":22},"1094V。",{"id":192,"libraryId":5,"type":15,"typeLabel":16,"stem":193,"options":194,"answer":28,"analysis":33},1023323,"有一双回路送电线路与电信线路平行接近，其单相接地短路电流如图15-3表中所示，请选取用于计算纵电动势的短路电流。 O点短路，下列短路电流中正确的是（）。",[195,197,199,201],{"key":20,"text":196,"correct":22},"1920A；",{"key":24,"text":198,"correct":22},"1090A；",{"key":28,"text":200,"correct":26},"1360A；",{"key":31,"text":202,"correct":22},"2460A。",{"id":204,"libraryId":5,"type":15,"typeLabel":16,"stem":205,"options":206,"answer":20,"analysis":33},1023324,"有一双回路送电线路与电信线路平行接近，其单相接地短路电流如图15-3表中所示，请选取用于计算纵电动势的短路电流。 6点短路，下列短路电流中正确的是（）。",[207,208,210,211],{"key":20,"text":200,"correct":26},{"key":24,"text":209,"correct":22},"2190A；",{"key":28,"text":196,"correct":22},{"key":31,"text":212,"correct":22},"1090A。",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":20,"analysis":33},1023325,"电力系统专业（一次）承担的主要设计工作范围，以下（）说法比较全面。",[217,219,221,223],{"key":20,"text":218,"correct":26},"电力发展规划、电力系统设计、电厂（站）接入系统、变电所按入系统、系统专題研究，以及本体工程设计系统配合等；",{"key":24,"text":220,"correct":22},"电力需求规划、目标电网设计、电厂（站）接入系统、变电所接入系统、交直流输电专题研究，以及本体工程设计系统配合等；",{"key":28,"text":222,"correct":22},"C电源建设规划、无功规划设计、火电厂接入系统、变电所接入系统、联网专题研究，以及本体工程设计系统配合等；",{"key":31,"text":224,"correct":22},"能源供需规划、网络方案设计、水电站接入系统、变电所接A系统、输煤输电专題研究，以及本体工程设计系统配合等。",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":24,"analysis":33},1023326,"电力发展长期规划主要是研究（）。",[229,231,233,235],{"key":20,"text":230,"correct":22},"技术性问題；",{"key":24,"text":232,"correct":26},"战略性问题；",{"key":28,"text":234,"correct":22},"经济性问题；",{"key":31,"text":236,"correct":22},"可靠性问题。",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":20,"analysis":33},1023327,"电力发展长期规划主要内容包括（）。",[241,243,245,247],{"key":20,"text":242,"correct":26},"电力需求预測、动力资源开发、电源发展规划、电网发展规划、环境及社会影响分析，也要研究资全筹措等问题；",{"key":24,"text":244,"correct":22},"电力需求预测、煤炭资源开发、电源布局规划、电网延伸规划、环堍及社会影响分析，也要研究资金筹措等问題；",{"key":28,"text":246,"correct":22},"电力需求预测、水电资源开发、电源结构规划、电网完善规划、环境及社会影响分析，也要研究资金筹措等问題：",{"key":31,"text":248,"correct":22},"电力需求领测、风电资源开发、电源调峰规划、电网结构规划、环境及社会影响分析，也要研究资金筹措等问题。",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":24,"analysis":33},1023328,"电力系统电力平衡中的必需装机容量为（）。 A.工作容量+负荷备用容量； B工作容量+备用容量； C.工作容量+事故备用容量； D.工作容量+检修备用容量。",[253,254,255,256],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":26},{"key":28,"text":28,"correct":22},{"key":31,"text":31,"correct":22},{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":28,"analysis":33},1023329,"水、火电联合运行电力系统，一般选择（）代表设计水文年来进行电力电量平衡。",[261,263,265,267],{"key":20,"text":262,"correct":22},"特枯水年和设计平水年；",{"key":24,"text":264,"correct":22},"设计枯水年和设计丰水年；",{"key":28,"text":266,"correct":26},"设计枯水年和设计平水年；",{"key":31,"text":268,"correct":22},"特枯氷年和设计丰水年。",{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":28,"analysis":33},1023330,"电力系统总备用容量由负荷备用、事故备用和检修备用组成，在水、火电联合运行系统中，它们是按（）原则进行分配的。",[273,275,277,279],{"key":20,"text":274,"correct":22},"负荷备用一般由火电承担，亊故备用一般按水、火电厂装机容量的比例分配，检修备用按有关规程要求及具体情况而定；",{"key":24,"text":276,"correct":22},"负荷备用一般由水、火电承担，事故备用一般按水、火电厂装机容量的比例分配，检修备用按有关规程要求及具体情况而定；",{"key":28,"text":278,"correct":26},"负荷备用一般由水电承担，亊故备用一般按水、火电厂担负系统工作容量的比例分配，检修备用按有关规程要求及具体情况而定；",{"key":31,"text":280,"correct":22},"负荷备用一般由迳流水电承担，亊故备用一般按水、火电厂担负系统工作容量的比例分配，检修备用按有关规程要求及具体情况而定。",{"id":282,"libraryId":5,"type":15,"typeLabel":16,"stem":283,"options":284,"answer":28,"analysis":33},1023331,"电源规划设计的主要任务是寻求一个技术经济合理的电源规划建设方案，以下（）不是电源规划设计的主要内容。",[285,287,289,291],{"key":20,"text":286,"correct":22},"能源资源开发利用；",{"key":24,"text":288,"correct":22},"确定发电设备总容量、电源布局、电源结构；",{"key":28,"text":290,"correct":26},"确定电网输变电工程建设项目；",{"key":31,"text":292,"correct":22},"电源建设方案优化和提出电源建设项目表。",{"id":294,"libraryId":5,"type":15,"typeLabel":16,"stem":295,"options":296,"answer":20,"analysis":33},1023332,"我国国家电压等级标准是（）。",[297,299,301,303],{"key":20,"text":298,"correct":26},"3,6,10，35，（63），110,220，330，500,750kV；",{"key":24,"text":300,"correct":22},"3.45，6.9,11.5，40.25，（72.45）,126.5，253，363，550，825kV；",{"key":28,"text":302,"correct":22},"3.15，6.3，10.5，37，（66），115，230，345，525，787.5kV；",{"key":31,"text":304,"correct":22},"2.85，5.7，9.5,33.25，（60），104.5,209，313.5，475,712.5kV。",{"id":306,"libraryId":5,"type":15,"typeLabel":16,"stem":307,"options":308,"answer":20,"analysis":33},1023333,"我国目前电网设计仍采用常规方法（即按方案形成和方案检验两个阶段），用方案检验阶段潮流计算的结果来观察分析各方案是否能满足送电能力时，以下（）是不合理的。",[309,311,313,315],{"key":20,"text":310,"correct":26},"在事故运行方式下，各线路一般应接近线路的经济输电容量，",{"key":24,"text":312,"correct":22},"在正常运行方式下，各主变压器（包括联络变压器）的潮流应小于額定容量；",{"key":28,"text":314,"correct":22},"在N-1 （包括计划检修）的亊故运行方式下，输电线路不应超过持续允许的发热容量；",{"key":31,"text":316,"correct":22},"在N-1 （包括计划检修）的亊故运行方式下，主变压器应没有过负荷现象。",{"id":318,"libraryId":5,"type":15,"typeLabel":16,"stem":319,"options":320,"answer":31,"analysis":33},1023334,"关于电力系统短路电流计算的目的，以下（）说法是不够合理的。",[321,323,325,327],{"key":20,"text":322,"correct":22},"选择新増断路器的額定断流容量；",{"key":24,"text":324,"correct":22},"提出今后发展新型断路器的箱定断流容量；",{"key":28,"text":326,"correct":22},"研究限制短路电流的措施；",{"key":31,"text":328,"correct":26},"对现有大量断路器的額定断流容量不够时，首先应考虑更换新的断路器。",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":31,"analysis":33},1023335,"下面电力系统无功补偿原则中，（）是不对的。",[333,335,337,339],{"key":20,"text":334,"correct":22},"应满足电力系统各种运行方式下电压水平的需要；",{"key":24,"text":336,"correct":22},"无功分层分区的原則与电网分层分区的原则相同；",{"key":28,"text":338,"correct":22},"应使无功就地分房分区基本平衡，达到经济的效果；",{"key":31,"text":340,"correct":26},"应使远方电厂（站）发电机的无功电源得到充分利用。",{"id":342,"libraryId":5,"type":15,"typeLabel":16,"stem":343,"options":344,"answer":31,"analysis":33},1023336,"电力系统设置无功备用容量，是为了保证负荷集中地区电压稳定和正常供电。无功备用安排的原则，以下（）是不合理的。",[345,347,349,351],{"key":20,"text":346,"correct":22},"正常运行方式下，突然失去一回输电线路；",{"key":24,"text":348,"correct":22},"正常运行方式下，突然失去一台（组）最大容量无功补楼装至或该地区最大一台发电机（包括发电机失磁）；",{"key":28,"text":350,"correct":22},"在正常检修方式下，发生A项（或B项）事故，允许采取必要的措施（如切负荷、切并联电抗器等）；",{"key":31,"text":352,"correct":26},"在正常检修方式下，发生A项（或B项）事故，不应采取措施。",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":24,"analysis":33},1023337,"330kV、500kV母线在正常运行方式时，最高运行电压是（）。",[357,359,361,363],{"key":20,"text":358,"correct":22},"不得超过系统額定电压；",{"key":24,"text":360,"correct":26},"不得超过系统額定电压的10%；",{"key":28,"text":362,"correct":22},"不得超过系统額定电压的5%；",{"key":31,"text":364,"correct":22},"不得超过系统額定电压的15%。",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":24,"analysis":33},1023338,"发电厂和500kV变电所220kV母线，在正常运行方式时，电压允许偏差是（）。",[369,371,373,375],{"key":20,"text":370,"correct":22},"为系统額定电压的0%；",{"key":24,"text":372,"correct":26},"为系统額定电压的0~+10%；",{"key":28,"text":374,"correct":22},"为系统額定电压的一5%；",{"key":31,"text":376,"correct":22},"为系统额定电压的+10%。",{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":24,"analysis":33},1023339,"330kV、500kV超髙压线路充电功率补偿原则，下面（）说法不够妥当。",[381,383,385,387],{"key":20,"text":382,"correct":22},"应按无功就地分层平衡的基本要求配里高、低压并联电抗器进行补偿；",{"key":24,"text":384,"correct":26},"充电功率是无功电源之一，原則上应该利用；",{"key":28,"text":386,"correct":22},"高、低压并联电抗器的总容量不宜低于线路充电功率的90%；",{"key":31,"text":388,"correct":22},"高、低压并联电抗器的容量分配和安装地点应按系统的条件和各自的特点经全面论证研究后决定。",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":31,"analysis":33},1023340,"升、降压变压器调压方式及调压范围选择要求，以下（）是不完全正确的。",[393,395,397,399],{"key":20,"text":394,"correct":22},"应满足发电厂母线电压盾量的要求；",{"key":24,"text":396,"correct":22},"应满足变电所母线电压质糞的要求；",{"key":28,"text":398,"correct":22},"应满足受电端用户电压质量的要求；",{"key":31,"text":400,"correct":26},"应满足电力发展五年规划要求。",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":31,"analysis":33},1023341,"330、500kV级升压变压器高压侧的额定电压最好以下面（）原则来选择。",[405,407,409,411],{"key":20,"text":406,"correct":22},"按1.15倍系统額定电压选择；",{"key":24,"text":408,"correct":22},"按1.10倍系统颏定电压选择；",{"key":28,"text":410,"correct":22},"按1.05倍系统額定电压选择；",{"key":31,"text":412,"correct":26},"按系统无功功率分层（电压）平衡要求经计算论证后确定。",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":28,"analysis":33},1023342,"220kV及以下电压等级升压变压器高压侧的额定电压宜按（）来选择。",[417,419,421,423],{"key":20,"text":418,"correct":22},"按1.00倍系统額定电压选择；",{"key":24,"text":420,"correct":22},"按1.05倍系统额定电压选择；",{"key":28,"text":422,"correct":26},"按1.10倍系统額定电压选择；",{"key":31,"text":424,"correct":22},"按1.15倍系统额定电压选择。",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":20,"analysis":33},1023343,"电力系统无功补偿设备应包括容性和感性两种，那么以下一般不作于无功补偿设备用的是（）。",[429,431,433,435],{"key":20,"text":430,"correct":26},"变压器；",{"key":24,"text":432,"correct":22},"并联电容器；",{"key":28,"text":434,"correct":22},"并联电抗器；",{"key":31,"text":436,"correct":22},"调相机和静止型动态无功补偿装置。",{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":31,"analysis":33},1023344,"电力系统无功电源是（）。",[441,443,445,447],{"key":20,"text":442,"correct":22},"发电机实际可调无功功率和额定进相无功功率；",{"key":24,"text":444,"correct":22},"输电线路无功损耗和充电功率；",{"key":28,"text":446,"correct":22},"无功补偿设备容性和感性无功容量；",{"key":31,"text":448,"correct":26},"发电机实际可调无功功率、输电线路充电功率、无功补偿设备等全部容性无功容量。",{"id":450,"libraryId":5,"type":15,"typeLabel":16,"stem":451,"options":452,"answer":28,"analysis":33},1023345,"电力系统无功补偿容量指的是（）。",[453,455,457,459],{"key":20,"text":454,"correct":22},"无功补偿设备的全部并联电容器容量；",{"key":24,"text":456,"correct":22},"无功尝设备的全部低压并联电抗器容量；",{"key":28,"text":458,"correct":26},"无功补偿设备的全部容性无功和感性无功容量；",{"key":31,"text":460,"correct":22},"无功补楼设备的并联电容器和并联电抗器全部容量。",{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":31,"analysis":33},1023346,"电力系统承受大扰动能力的安全稳定标准分为三级，下列（）不是。",[465,467,469,471],{"key":20,"text":466,"correct":22},"正常方式，单一故障，不采取稳定措施，必须保持稳定运行和电网的正常供电；",{"key":24,"text":468,"correct":22},"当系统不能保持稳定运行时，必须采取措施，防止系统崩溃并尽量减小负荷损失；",{"key":28,"text":470,"correct":22},"正常方式，较严重故障，允许采取稳定掛施，应能保持稳定运行，但允许损失部分负荷；",{"key":31,"text":472,"correct":26},"因多重故障导致电力系统稳定破坏时，为防止系统崩溃，必须采取播施并尽量减少负荷用电。",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":28,"analysis":33},1023347,"以下（）不是电力系统静态稳定计算分析的目的。",[477,479,481,483],{"key":20,"text":478,"correct":22},"确定电力系统稳定性；",{"key":24,"text":480,"correct":22},"确定输电线的输送功率极限；",{"key":28,"text":482,"correct":26},"核算振荡电流水平；",{"key":31,"text":484,"correct":22},"检验在给定运行方式下实际的静稳定储备。",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":20,"analysis":33},1023348,"下面四项中不能作为暂态稳定的判据是（）。",[489,491,493,495],{"key":20,"text":490,"correct":26},"作同步的增幅振荡；",{"key":24,"text":492,"correct":22},"第一或笫二个振荡同期不失步；",{"key":28,"text":494,"correct":22},"作同步的衰减抵荡；",{"key":31,"text":496,"correct":22},"系统中枢点电压逐渐恢复。",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":20,"analysis":33},1023349,"对具有串联电容器装置补偿输电线路采用强行补偿措施可以提髙暂态稳定水平，具体的鰣是（）。",[501,503,505,507],{"key":20,"text":502,"correct":26},"串联电容器补偿装罝内切除部分并联电容器；",{"key":24,"text":504,"correct":22},"串联电容器补偿装置内切除部分串联电容器；",{"key":28,"text":506,"correct":22},"串联电容器补偿装置内切除全郜电容器；",{"key":31,"text":508,"correct":22},"串联电容器补偿装置内短接全部电容器，",{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":28,"analysis":33},1023350,"为避免电力系统内线路发生永久性故障时系统失步可来用切发电机和切负荷，具体来说一般应该采用以下（）措施。",[513,515,517,519],{"key":20,"text":514,"correct":22},"在功率多余地区切除部分发电机，在功率不足地区不切除部分负荷；",{"key":24,"text":516,"correct":22},"在功率多余地区不切除发电机，在功率不足地区切除部分负荷；",{"key":28,"text":518,"correct":26},"在功率多余地区切除部分发电机，在功率不足地区切除部分负荷；",{"key":31,"text":520,"correct":22},"在功率多余地区投入部分发电机，在功率不足地区不切除部分负荷。",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":24,"analysis":33},1023351,"以下用系统额定电压（％值）表示的允许电压偏移值，属于逆调压方式的是（）。",[525,527,529,531],{"key":20,"text":526,"correct":22},"最大负荷时+10%、最小负荷时+5%；",{"key":24,"text":528,"correct":26},"最大负荷时+5%、最小负荷时0%；",{"key":28,"text":530,"correct":22},"最大负荷时+2.5%、最小负荷时+2.5%；",{"key":31,"text":532,"correct":22},"最大负荷时+2.5%、最小负荷时+7.5%。",{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":24,"analysis":33},1023352,"下面（）运行工况为发电机的进相运行方式。 A.发出有功功率、发出无功功率； B.发出有功功率、吸收无功功率； C.不发出有功功率、吸收无功功率； D：不发出有功功率、发出无功功率。",[537,538,539,540],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":26},{"key":28,"text":28,"correct":22},{"key":31,"text":31,"correct":22},{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":20,"analysis":33},1023353,"下列关于电力系统产生工频过电压的原因，错误的是（）。",[545,547,549,551],{"key":20,"text":546,"correct":26},"雷电；",{"key":24,"text":548,"correct":22},"长线电容效应；",{"key":28,"text":550,"correct":22},"不对称接地故障；",{"key":31,"text":552,"correct":22},"甩负荷。",{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":31,"analysis":33},1023354,"（）情况下发电厂单《行时要验算（核算）自励磁过电压。",[557,559,561,563],{"key":20,"text":558,"correct":22},"带长线路；",{"key":24,"text":560,"correct":22},"带轻载长线路；",{"key":28,"text":562,"correct":22},"带重载长线路；",{"key":31,"text":564,"correct":26},"带空载长线路。",{"id":566,"libraryId":5,"type":15,"typeLabel":16,"stem":567,"options":568,"answer":31,"analysis":33},1023355,"某煤电联营坑口火力发电厂，采用交流500kV电压等级、二回出线将电厂电力送到受端负荷中心变电所，送电线路长度（L）250km,每公里电容 （C）0.0126336 F，为限制工頻过电压和潜供电流要在每条500kV线路受端侧装设150Mvar髙压并联电抗器。请分析和计算以下问题。 受端500kV变电所装设的低压并联电抗器容量是（）。",[569,571,573,575],{"key":20,"text":570,"correct":22},"360Mvar；",{"key":24,"text":572,"correct":22},"300Mvar；",{"key":28,"text":574,"correct":22},"180Mvar；",{"key":31,"text":576,"correct":26},"240Mvar。",{"id":578,"libraryId":5,"type":15,"typeLabel":16,"stem":579,"options":580,"answer":31,"analysis":33},1023356,"某大型发电厂采用500kV电压等级，并经两回输电线路（线路主要数据：2X350km,LGJ-4X400mm2,每公里电抗为0.28Ω）向较强的受端电力系统送电，为了缩短输电线路的电气距离，以提高线路的输电能力和电力系统稳定性，根据规划论证决定在该输电工程中采用串联电容器补偿技术。 对发电厂至受端电力系统之间输电线路的基本要求（或基本原则或基本条件）是（）。",[581,583,585,587],{"key":20,"text":582,"correct":22},"今后要“II”进中间变电所；",{"key":24,"text":584,"correct":22},"今后要“II”进中间并关所；",{"key":28,"text":586,"correct":22},"今后要“II”进换流站；",{"key":31,"text":588,"correct":26},"今后不再“II”进中间变电所。",[590,593,596,599,602,605],{"id":15,"name":591,"category":7,"favorite":592},"领导干部任职前廉政法规知识测试题",92,{"id":594,"name":595,"category":7,"favorite":15},595,"建筑结构与设备",{"id":597,"name":598,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":600,"name":601,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":603,"name":604,"category":7,"favorite":8},534,"BIM工程师",{"id":606,"name":604,"category":7,"favorite":8},535]