[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-751-26":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":611},{"id":5,"name":6,"category":7,"favorite":8},751,"电气工程师发输变电专业","建筑工程",0,26,50,2670,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,237,249,261,273,285,297,309,321,332,344,356,368,380,392,404,416,428,440,452,464,476,488,500,512,524,535,547,559,571,579,591,599],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1023005,1,"单选题","水电厂低压厂用电系统，采用双层辐射式供电时，在分配电屏的电源进线上应（）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","装保护电器；",false,{"key":24,"text":25,"correct":26},"B","装隔离电器；",true,{"key":28,"text":29,"correct":22},"C","不装任何电器；",{"key":31,"text":32,"correct":22},"D","装隔离电器和保护电器。","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1023006,"下列水电厂厂用电负荷，属于I类负荷的有（）。",[38,40,42,44],{"key":20,"text":39,"correct":26},"断路器操动机构；",{"key":24,"text":41,"correct":22},"隔离开关操动机构；",{"key":28,"text":43,"correct":22},"坝内廊道排水果；",{"key":31,"text":45,"correct":22},"當电池室通风机。",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},1023007,"设置检修专用变压器的前提是（）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"担任基、腰荷的大型水电厂；",{"key":24,"text":53,"correct":22},"担任调峰的大型水电厂；",{"key":28,"text":55,"correct":26},"检修负荷特别大的大型水电厂；",{"key":31,"text":57,"correct":22},"中型水电广。",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1023008,"水电厂20kW以下电动机回路的电缆长度大于（ ）时，宜校核电缆的电压损失。",[62,64,66,68],{"key":20,"text":63,"correct":22},"50m；",{"key":24,"text":65,"correct":26},"60m；",{"key":28,"text":67,"correct":22},"70m；",{"key":31,"text":69,"correct":22},"80m。",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":28,"analysis":33},1023009,"水电厂厂用电最大负荷的分析统计，（）方式可以不考虑，",[74,76,78,80],{"key":20,"text":75,"correct":22},"全部机组发电运行；",{"key":24,"text":77,"correct":22},"部分机组大修，其余机组发电运行；",{"key":28,"text":79,"correct":26},"部分机组小修，其余机组发电运行；",{"key":31,"text":81,"correct":22},"部分机组大修，一台机组调相，其余机组发电运行。",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},1023010,"布置在水电厂厂房内且为架空进线的厂用电变压器，选型错误的是（）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"加择絶缘的干式变压器；",{"key":24,"text":89,"correct":26},"干式变压器；",{"key":28,"text":91,"correct":22},"干式变压器，采取有效的防雷掛施；",{"key":31,"text":93,"correct":22},"油浸式变压器。",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},1023011,"水电厂厂用电变压器与离相封闭分支母线连接时，宜采用（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"三相油浸式变压器；",{"key":24,"text":101,"correct":22},"三相干式变压器；",{"key":28,"text":103,"correct":22},"单相油浸式变压器；",{"key":31,"text":105,"correct":26},"单相干式变压器。",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},1023012,"水电厂在正常的电源电压偏差和厂用电负荷波动的情况下，对仅接有电动机的厂用电各级母线的电压偏差可不超过額定电压的（）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"+10%和一7.5%；",{"key":24,"text":113,"correct":26},"额定电压+10%和一5%；",{"key":28,"text":115,"correct":22},"+7.5%和一7.5%；",{"key":31,"text":117,"correct":22},"额定电压+7.5%和一5%。",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":28,"analysis":33},1023013,"10kV级有载调压厂用电变压器的调压范围一般是（).",[122,124,126,128],{"key":20,"text":123,"correct":22},"±2X2.5%；.",{"key":24,"text":125,"correct":22},"±3X2.5%；",{"key":28,"text":127,"correct":26},"±4X2.5%；",{"key":31,"text":129,"correct":22},"±5X2.5%。",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},1023014,"无励磁厂用电变压器的调压范围一般是（)。",[134,136,138,140],{"key":20,"text":135,"correct":22},"±2.5%；",{"key":24,"text":137,"correct":26},"±5%；",{"key":28,"text":139,"correct":22},"±7%",{"key":31,"text":141,"correct":22},"±10%。",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":28,"analysis":33},1023015,"高、低压厂用电变压器的阻抗值选择原则，不合适的是（）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"厂用电系统能采用轻型的电器设备；",{"key":24,"text":149,"correct":22},"满足电动机正常启动的电压水平；",{"key":28,"text":151,"correct":26},"厂用电系统的设备投资最少；",{"key":31,"text":153,"correct":22},"满足电动机成组自启动的电压水平。",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":28,"analysis":33},1023016,"水电厂不经常启动的电动机，正常启动时，所连接母线电压降应不大于（）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"25%；",{"key":24,"text":161,"correct":22},"20%；",{"key":28,"text":163,"correct":26},"15%；",{"key":31,"text":165,"correct":22},"10%。",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":31,"analysis":33},1023017,"满足鼠笼型电动机全压启动的条件中错误的是（）。",[170,172,174,176],{"key":20,"text":171,"correct":22},"电动机启动时，其端电压应保证有足够的启动力姖；",{"key":24,"text":173,"correct":22},"电动机所配的生产机械允许全压启动；",{"key":28,"text":175,"correct":22},"电动机启动时，所连接母线的电压应符合规范要求；",{"key":31,"text":177,"correct":26},"由变压器供电时，经常启动电动机启动时的总电流不超过变压器额定电流的5倍。",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":20,"analysis":33},1023018,"水电厂高压厂用电系统电器设备和导体选择的主要原则中，错误的是（）。",[182,184,186,188],{"key":20,"text":183,"correct":26},"导体截面应按经济电流密度选择；",{"key":24,"text":185,"correct":22},"选择高压断路器时，可不计短路电流非周期分量对断路器分断能力的影响；",{"key":28,"text":187,"correct":22},"符合现行的有关规程、规范；",{"key":31,"text":189,"correct":22},"电源回路电力电缆应采用铜芯电缆。",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":28,"analysis":33},1023019,"电厂选择低压电器（不含短路保护电器）的一般原则是（）；",[194,196,198,200],{"key":20,"text":195,"correct":22},"符合工作电压、电流、使用环境、使用类别，满足短路条件下的动热稳定；",{"key":24,"text":197,"correct":22},"符合工作电压、电流、使用环境、用途、使用类别；",{"key":28,"text":199,"correct":26},"符合工作电压、电流、频率、准确等级、使用环境、用途、使用类别、满足短路条件下的动热稳定；",{"key":31,"text":201,"correct":22},"符合工作电压、电流、满足短路条件下的动热稳定。",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":28,"analysis":33},1023020,"火力发电厂启动\u002F备用变压器分接开关调压范围和级电压的选择，下述说法正确的是（）。",[206,208,210,212],{"key":20,"text":207,"correct":22},"调压范围采用10%(以正分接到负分接），级电压采用2.5%；",{"key":24,"text":209,"correct":22},"调压范围采用15%(以正分接到负分接），级电压采用2.5%；",{"key":28,"text":211,"correct":26},"调压范围采用20% (以正分接到负分接），级电压采用1.25%；",{"key":31,"text":213,"correct":22},"调压范围采用20%（以正分接到负分接），级电压采用1.46%。",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":28,"analysis":33},1023021,"火力发电厂最大容量的电动机正常启动时，厂用母线的电压应不低于额定电压的()。",[218,220,222,224],{"key":20,"text":219,"correct":22},"70%,",{"key":24,"text":221,"correct":22},"90%,",{"key":28,"text":223,"correct":26},"80%；",{"key":31,"text":225,"correct":22},"60%。",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":24,"analysis":33},1023022,"火力发电厂电动机的功率（kW)为电源容量（kV A)的（ ）以上时，应验算正常启动时的电压水平。",[230,232,233,235],{"key":20,"text":231,"correct":22},"10%；",{"key":24,"text":161,"correct":26},{"key":28,"text":234,"correct":22},"30%,",{"key":31,"text":236,"correct":22},"15%。",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":24,"analysis":33},1023023,"火力发电厂在中性点直接接地的厂用低压系统中，断路器过流脱扣器的数量应选择().",[241,243,245,247],{"key":20,"text":242,"correct":22},"4个；",{"key":24,"text":244,"correct":26},"3个；",{"key":28,"text":246,"correct":22},"1个；",{"key":31,"text":248,"correct":22},"2个，",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":28,"analysis":33},1023024,"火力发电厂厂用低压电动机断路器的过电流脱扣器的整定电流应（）。",[253,255,257,259],{"key":20,"text":254,"correct":22},"按电动机回路运行最大电流时不误动计算；",{"key":24,"text":256,"correct":22},"按电动机回路短时最大电流时不误动计算；",{"key":28,"text":258,"correct":26},"按躲过电动机启动电流条件选择；",{"key":31,"text":260,"correct":22},"按1.3倍电动机額定电流计算选择.",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":28,"analysis":33},1023025,"火力发电厂低压厂用电系统电动机回路采用熔断器做短路保护，熔断器熔件额定电.流校验，下述正确的是（）。",[265,267,269,271],{"key":20,"text":266,"correct":22},"按回路工作电流正常运行时不熔断校验；",{"key":24,"text":268,"correct":22},"按回路工作电流乘以1.2可靠系数数值校验；",{"key":28,"text":270,"correct":26},"按躲开启动电流校验；",{"key":31,"text":272,"correct":22},"按电动机额定电流乘以1. 3可靠系数枝检。",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":24,"analysis":33},1023026,"低压断路器脱扣器整定电流选定后，脱扣器的灵敏系数校验应达到（Hh为脱扣器整定电流；r为电动机端部或MCCM线上的最小短路电流)。",[277,279,281,283],{"key":20,"text":278,"correct":22},"I\u002FIZ 1.2；",{"key":24,"text":280,"correct":26},"I\u002FIZ 1.5；",{"key":28,"text":282,"correct":22},"I\u002FIz l.8；",{"key":31,"text":284,"correct":22},"I\u002FIz 2.0。",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":28,"analysis":33},1023027,"当髙压厂用电压为6kV —级时，电动机的容量和电压选择原则的叙述正确的是（）。",[289,291,293,295],{"key":20,"text":290,"correct":22},"10OkW以上的电动机可采用6kV，10OkW以下者宜采用380V；",{"key":24,"text":292,"correct":22},"300kW以上的电动机可采用6kV，300kW以下者宜采用380V；",{"key":28,"text":294,"correct":26},"200kW以上的电动机可采用6kV,200kW以下者宜采用380V；",{"key":31,"text":296,"correct":22},"250kW以上的电动机可采用6kV，250kW以下者宜采用380V。",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":24,"analysis":33},1023028,"当高压厂用电电庄为10kV及3kV两级时，电动机容量和电压选择原则的叙述正确的是（）。",[301,303,305,307],{"key":20,"text":302,"correct":22},"10OOkW以上的电动机宜釆用10kV，200~10OOkW宜采用3kV,200kW以下宜采用380V；",{"key":24,"text":304,"correct":26},"1800kW以上的电动机宜采用10kV,200~1800kW宜采用3kV，200kW以下宜采用380V；",{"key":28,"text":306,"correct":22},"1500kW以上的电动机宜采用10kV,100~1500kW宜采用3kV；10OkW以下宜采用380V；",{"key":31,"text":308,"correct":22},"2000kW以上的电动机宜采用10kV，200~2000kW宜采用3kV；200kW以下宜采用380V。",{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":24,"analysis":33},1023029,"关于220kV及以上的变电所所用变压器是否选择有载调压变压器的叙述中正确的是（）。",[313,315,317,319],{"key":20,"text":314,"correct":22},"所用变压器一般不采用有载调压变压器；",{"key":24,"text":316,"correct":26},"在正常运行方式下，所用母线电压波动不超过额定值的土5%时，所用变压器可不采用有载调压变压器；",{"key":28,"text":318,"correct":22},"所用母线电压因高压电源波动使母线电压偏移超过±2.5%，应采用有载调压所用变压器；",{"key":31,"text":320,"correct":22},"对用变压器一般采用有载调压变压器。",{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":31,"analysis":33},1023030,"220kV及以上变电所当高压电源波动较大，经常使所用母线电压偏移，超过（）时，应采用有载调压所用变压器。",[325,327,328,330],{"key":20,"text":326,"correct":22},"±10%；",{"key":24,"text":135,"correct":22},{"key":28,"text":329,"correct":22},"±8%；",{"key":31,"text":331,"correct":26},"±5%。",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":28,"analysis":33},1023031,"220kV及以上变动电所所用变压器的接线组别宜为（）。",[336,338,340,342],{"key":20,"text":337,"correct":22},"ygnl2；",{"key":24,"text":339,"correct":22},"Ddl2；",{"key":28,"text":341,"correct":26},"Dynll；",{"key":31,"text":343,"correct":22},"Ydll。",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":28,"analysis":33},1023032,"关于火力发电厂负荷计算原则’下述不正确的是（）。",[348,350,352,354],{"key":20,"text":349,"correct":22},"连续运行的设备，应全部计算；",{"key":24,"text":351,"correct":22},"不经食短时及不经常断续运行的设备不予计算，但电抗器供电的应全部计算；",{"key":28,"text":353,"correct":26},"不同电源供电的互为备用设备，只计算运行部分；",{"key":31,"text":355,"correct":22},"对分裂电抗器运行的设备应分别计算每一臂电通过的负荷，不经常短时及不经常断续的设备不予计算。",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":28,"analysis":33},1023033,"220kV及以上变电所，其所用电变压器容量S(kV A)的计算公式正确的是（）。 A.S≥ΣP1+ΣP2；",[360,362,364,366],{"key":20,"text":361,"correct":22},"S≥ΣP1+ΣP2",{"key":24,"text":363,"correct":22},"S≥K1ΣP1+ΣP2；",{"key":28,"text":365,"correct":26},"S≥ΣP1+ΣP2。",{"key":31,"text":367,"correct":22},"注：ΣP1为动力负荷和，kW；ΣP2为电热、照明负荷之和，kW；K1=0.85。",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":31,"analysis":33},1023034,"所用变压器高压侧选用熔断器作为保护电器的叙述中，错误的是（）。",[372,374,376,378],{"key":20,"text":373,"correct":22},"应按回路电压、电流断流容量徕护特性选择；",{"key":24,"text":375,"correct":22},"应按环垅温度，最大风速，污秽等级，海拔髙度及地震烈度等进行校验；",{"key":28,"text":377,"correct":22},"C应使熔体内通过变压器回路最大工作电流和通过变压器的励磁涌流时不误动；",{"key":31,"text":379,"correct":26},"可以不考虑保护范围外的短路电流及电动机自启动等引起的冲击电流的作用。",{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":31,"analysis":33},1023035,"保护35kV及以下电力变压器的高压熔断器，其焰体的額定电流Ire正确的选择是（)。 A. Ire≥Ibgm,Ibgm为变压器回路最大工作电流",[384,386,388,390],{"key":20,"text":385,"correct":22},"；",{"key":24,"text":387,"correct":22},"Ire≥3.OIbgm；",{"key":28,"text":389,"correct":22},"Ire≥4.0Ibgm；",{"key":31,"text":391,"correct":26},"Ire≥KIbgm不考虑电动机自启动时取1.1~1.3；应考虑电动机自启动时取1.5~2.0),",{"id":393,"libraryId":5,"type":15,"typeLabel":16,"stem":394,"options":395,"answer":24,"analysis":33},1023036,"所用低压电器和导体选择的叙述中，错误的是（）。",[396,398,400,402],{"key":20,"text":397,"correct":22},"应满足工作电流、工作电压、分断能力、动热稳定和环境要求，对于屏拒内电器额定电流的逸择，应考虑不利散热影响可按0.7~0.9修正；",{"key":24,"text":399,"correct":26},"保护电器的額定功率因数应大于短路功率因数，不满足时，分断能力应留有裕度；",{"key":28,"text":401,"correct":22},"当电源为下进线时，应考虑其对分断能力的影响；",{"key":31,"text":403,"correct":22},"用限流熔断器保护的电器和导体可不校检热稳定。",{"id":405,"libraryId":5,"type":15,"typeLabel":16,"stem":406,"options":407,"answer":28,"analysis":33},1023037,"火力发电厂低压配电装置室内裸导电部分与各部分的净距，正确的是（）。",[408,410,412,414],{"key":20,"text":409,"correct":22},"屏后通道裸导体的高度低于2.0m,应加遮护；",{"key":24,"text":411,"correct":22},"屏后通道裸导体的高度低于2.2m，应加遮护；",{"key":28,"text":413,"correct":26},"屏后通道裸导体的高度低于2.3m,应加以遮护；",{"key":31,"text":415,"correct":22},"屏前通道裸导体的高度低于2.3m，应加以遥护。",{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":28,"analysis":33},1023038,"火力发电厂厂用电系统中低压配电屏（柜）前后通道最小宽度确定，错误的是（）。 A.不受限制时双排对面布置情况： 固定分隔式：屏前2m，屏后维护1.0m，操作1.2m； 抽屉式：屏前2.3m，屏后维护1.0m，操作.1.2m。 B.不受限刹时，单排布置情况： 固定分隔式：屏前1.5m，屏后维护1.0m，操作1.2m； 抽屉式：屏前1.8m,屏后维护1.0m，操作1.2m。 C.受限制时，双排对面布里情况：",[420,422,424,426],{"key":20,"text":421,"correct":22},"固定分隔式：屏前1.8m,屏后维护0.8m,操作1.2m；",{"key":24,"text":423,"correct":22},"抽屋式：屏前1.8m,屏后维护0.8m,操作1.2m。",{"key":28,"text":425,"correct":26},"受限制，单排布置：",{"key":31,"text":427,"correct":22},"固定分隔式：屏前1.3m，屏后维护0.8m，操作1.2m；抽屉式：屏前1.6m，屏后维护0.8m，操作1.2m。",{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":24,"analysis":33},1023039,"火力发电厂髙压厂用配电装置室开关柜的设备双列布置操作通道、背面维护通道、侧面维护通道的常用尺寸，正确的是（）。",[432,434,436,438],{"key":20,"text":433,"correct":22},"固定式 2.Om, 手车式2.5m；1.Om；.1.0m；",{"key":24,"text":435,"correct":26},"固定式 2.3m，手车式3.0m；0.8m；1.0m；",{"key":28,"text":437,"correct":22},"固定发 1.6m,手车式2.0m；0.8m；1.0m；",{"key":31,"text":439,"correct":22},"固定式 2.5m，手车式3.5m；0.8m；1.0m。",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":20,"analysis":33},1023040,"火力发电厂厂用配电装置室，搬运设备门的宽度应按最大设备外形宽度再附加一定尺寸，但最小宽度不小于900mm?下述各项为附加尺寸，有错误的是（）。",[444,446,448,450],{"key":20,"text":445,"correct":26},"10Omm；",{"key":24,"text":447,"correct":22},"200mm；",{"key":28,"text":449,"correct":22},"300mm；",{"key":31,"text":451,"correct":22},"400mm。",{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":20,"analysis":33},1023041,"水电厂对低压电动机回路的磁力启动器，是否装设带断相保护的热继电器，说法正确的是（）。",[456,458,460,462],{"key":20,"text":457,"correct":26},"电动机定子为三角形接线的回路要装；",{"key":24,"text":459,"correct":22},"电动机定子为星形接线的回路要装；",{"key":28,"text":461,"correct":22},"电动机用断路器作短路保护的回路要装；",{"key":31,"text":463,"correct":22},"一般的回路均不装。",{"id":465,"libraryId":5,"type":15,"typeLabel":16,"stem":466,"options":467,"answer":28,"analysis":33},1023042,"火力发电厂厂用配电装置室的出口设置要求，正确的是（）。",[468,470,472,474],{"key":20,"text":469,"correct":22},"厂用配电装置室大于10m时应有两个出口；对超过60m时，_宜増加一个出口；",{"key":24,"text":471,"correct":22},"厂用配电装置室大于6m时应有两个出口；对超过40m时，宜増加一个出口；",{"key":28,"text":473,"correct":26},"C厂用配电装置室大于7m时应有两个出口；对超过60m时，宜増加一个出口；",{"key":31,"text":475,"correct":22},"厂用配电装里室大于8m时应有两个出口；对超过50m时，宜增加一个出口。",{"id":477,"libraryId":5,"type":15,"typeLabel":16,"stem":478,"options":479,"answer":28,"analysis":33},1023043,"水电厂的厂用电系统由（）供电，应根据厂用电负荷大小、枢纽布置、坝区负荷等条件经技术经济比较确定。",[480,482,484,486],{"key":20,"text":481,"correct":22},"低压一级电压：",{"key":24,"text":483,"correct":22},"高压一级电压；",{"key":28,"text":485,"correct":26},"高、低压两级电压；",{"key":31,"text":487,"correct":22},"低压一级或高、低压两级电压。",{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":28,"analysis":33},1023044,"水力发电厂厂用电系统，在下列（ ）方式下，厂用分支可采用髙压熔断器保护。",[492,494,496,498],{"key":20,"text":493,"correct":22},"装机容量200MW以下、单机容量100MW及以下、厂用变容量800kVA以上；",{"key":24,"text":495,"correct":22},"装机容量200MW及以上、单机容责100MW及以下、厂用变容量800kVA以下；",{"key":28,"text":497,"correct":26},"装杌容量200MW以下、单机容量100MW及以下、厂用变容量800kVA以下；",{"key":31,"text":499,"correct":22},"装机容量200MW以下、单机容量100MW及以下、厂用变容量500kVA以下。",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":28,"analysis":33},1023045,"水电厂配电室屏后通道上裸带电导体距地面距离不小于（ ）时，可不考虑架防护措施.",[504,506,508,510],{"key":20,"text":505,"correct":22},"2.3m；",{"key":24,"text":507,"correct":22},"2.2m；",{"key":28,"text":509,"correct":26},"2.Om；",{"key":31,"text":511,"correct":22},"1.9m。",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":28,"analysis":33},1023046,"水电厂厂用配电装置室低压配电屏背面维护通道最小距离是（）。",[516,518,520,522],{"key":20,"text":517,"correct":22},"500mm；",{"key":24,"text":519,"correct":22},"600mm；",{"key":28,"text":521,"correct":26},"800mm；",{"key":31,"text":523,"correct":22},"1000mm.",{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":28,"analysis":33},1023047,"水电厂低压电动机空载或失压成组自启动时’厂用低压母线电压不应低于（）。",[528,529,531,533],{"key":20,"text":223,"correct":22},{"key":24,"text":530,"correct":22},"70%；",{"key":28,"text":532,"correct":26},"65%；",{"key":31,"text":534,"correct":22},"55%。",{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":24,"analysis":33},1023048,"水电厂鼠笼型电动机的降压启动方式，宜苜选（ ）。",[539,541,543,545],{"key":20,"text":540,"correct":22},"软启动器启动；",{"key":24,"text":542,"correct":26},"星一三角降压启动；",{"key":28,"text":544,"correct":22},"延边三角形降压启动；",{"key":31,"text":546,"correct":22},"自耦变压器降压启动。",{"id":548,"libraryId":5,"type":15,"typeLabel":16,"stem":549,"options":550,"answer":20,"analysis":33},1023049,"水电厂厂用电系统电器设备选择时，用（）以下熔断器保护的电器可不校验动热稳定.",[551,553,555,557],{"key":20,"text":552,"correct":26},"60A；",{"key":24,"text":554,"correct":22},"63A；",{"key":28,"text":556,"correct":22},"80A；",{"key":31,"text":558,"correct":22},"100A。",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":28,"analysis":33},1023050,"水电厂厂用变压器容量选择，当装设三台厂用电电源变压器互为备用或其中一台为明备用时，每台的额定容量宜为最大厂用的（）。",[563,565,567,569],{"key":20,"text":564,"correct":22},"60%~65%；",{"key":24,"text":566,"correct":22},"60%~70%；",{"key":28,"text":568,"correct":26},"50%~60%；",{"key":31,"text":570,"correct":22},"50%~70%。",{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":20,"analysis":33},1023051,"水电厂厂用变压器容量选择，满足需要自启动的电动机的最低母线电压为（）。",[575,576,577,578],{"key":20,"text":564,"correct":26},{"key":24,"text":566,"correct":22},{"key":28,"text":568,"correct":22},{"key":31,"text":570,"correct":22},{"id":580,"libraryId":5,"type":15,"typeLabel":16,"stem":581,"options":582,"answer":28,"analysis":33},1023052,"火力发电厂的厂用电，按运行方式分类可分为（）。",[583,585,587,589],{"key":20,"text":584,"correct":22},"4种；",{"key":24,"text":586,"correct":22},"5种；",{"key":28,"text":588,"correct":26},"6种；",{"key":31,"text":590,"correct":22},"7种。",{"id":592,"libraryId":5,"type":15,"typeLabel":16,"stem":593,"options":594,"answer":31,"analysis":33},1023053,"低压厂用电设备选择中，对馈电干线，按启动条件校验熔件额定电流的算式之一是Ie≥SIq\u002Fa2中，熔件选择系数a2应取（）。 A.1.25； B.1.35； C1.4； D.1.5。",[595,596,597,598],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":22},{"key":28,"text":28,"correct":22},{"key":31,"text":31,"correct":26},{"id":600,"libraryId":5,"type":15,"typeLabel":16,"stem":601,"options":602,"answer":31,"analysis":33},1023054,"低压厂用电设备选择中，对单台电动机回路，断路器过电流脱扣器整定值算式Ie KIQ中，对动作时间大于0.02s的断路器，可靠系数K应取（）。",[603,605,607,609],{"key":20,"text":604,"correct":22},"1.15；",{"key":24,"text":606,"correct":22},"1.25；",{"key":28,"text":608,"correct":22},"1.3；",{"key":31,"text":610,"correct":26},"1.35。",[612,615,618,621,624,627],{"id":15,"name":613,"category":7,"favorite":614},"领导干部任职前廉政法规知识测试题",92,{"id":616,"name":617,"category":7,"favorite":15},595,"建筑结构与设备",{"id":619,"name":620,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":622,"name":623,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":625,"name":626,"category":7,"favorite":8},534,"BIM工程师",{"id":628,"name":626,"category":7,"favorite":8},535]