[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-751-25":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":616},{"id":5,"name":6,"category":7,"favorite":8},751,"电气工程师发输变电专业","建筑工程",0,25,50,2670,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,225,237,249,261,273,285,296,308,320,332,344,356,367,379,391,403,415,427,439,451,463,475,486,498,510,522,534,546,558,570,582,594,604],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1022955,1,"单选题","某特大型水电厂装机6台，单机容量550MW、发电机出口装设断路器，发电机引出线及分支线均采用离相封闭母线，发电机与变压器组 6kV高压母线宜采用（）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","6kV为两个独立的单分段母线接线（由1号机一3号机一4号机一6号机分别形成），每个独立系统接一回外来电源；",false,{"key":24,"text":25,"correct":26},"B","上述接线的两个独立系统用断路器连接起来，形成单母线多分段接线；",true,{"key":28,"text":29,"correct":22},"C","6kV为两个独立的分段环形接线(由1号机一3号机和4号机一6号机分别形成），每个独立环形接线中接一回外来电源；",{"key":31,"text":32,"correct":22},"D","同上但两个环形用断路器连接起来。","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},1022956,"选择某水电厂厂用电变压器容量。 已知条件：1)选用三台厂用电变压器互为备用； 2)所有同时参加最大负荷运行时，负荷的额定功率总和为1233. 73kW； 3)厂用电负荷的综合系数取0.75。 每台厂用电变压器的额定容量宜为厂用电最大负荷的（）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"30%~40%；",{"key":24,"text":41,"correct":22},"40%~50%；",{"key":28,"text":43,"correct":26},"50%~60%；",{"key":31,"text":45,"correct":22},"60%~70%。",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},1022957,"选择某水电厂厂用电变压器容量。 已知条件：1)选用三台厂用电变压器互为备用； 2)所有同时参加最大负荷运行时，负荷的额定功率总和为1233. 73kW； 3)厂用电负荷的综合系数取0.75。 选择厂用电变压器容量的厂用电最大负荷的确定不宜选择的方法是（).",[50,52,54,56],{"key":20,"text":51,"correct":22},"综合系数法1；",{"key":24,"text":53,"correct":22},"综合系数法2；",{"key":28,"text":55,"correct":22},"综合系数法3；",{"key":31,"text":57,"correct":26},"负荷统计法。",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1022958,"某火力发电厂厂用电电压采用6kV、380V\u002F220V,高压厂用电采用金属封闭铠装手车式开关柜，低压厂用电采用抽屉式开关柜，在开关柜的布置中，回答下列问题。 髙压电动机及低压厂用变压器全部采用断路器对其供电，其中1号机组共有43块髙压开关柜，双列布置，假设开关柜尺寸为1800mmX1000mm，则配电室长度宜（）。",[62,64,66,68],{"key":20,"text":63,"correct":26},"不小于23m；",{"key":24,"text":65,"correct":22},"不小于24m；",{"key":28,"text":67,"correct":22},"不小于25m；",{"key":31,"text":69,"correct":22},"等于25m。",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},1022959,"某火力发电厂厂用电电压采用6kV、380V\u002F220V,高压厂用电采用金属封闭铠装手车式开关柜，低压厂用电采用抽屉式开关柜，在开关柜的布置中，回答下列问题。 低压配电盘采用双列布置，电源进线至盘后变压器室采用封闭母线桥，则盘后及盘前母线桥净髙应（)。",[74,76,78,80],{"key":20,"text":75,"correct":22},"不小于2.2m、不小于2.3m；",{"key":24,"text":77,"correct":22},"不小于2.2m、不小于1.9m；",{"key":28,"text":79,"correct":22},"等于2.2m、等于1.9m；",{"key":31,"text":81,"correct":26},"不小于1.9m、不小于2.2m。",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":28,"analysis":33},1022960,"某火力发电厂厂用电电压采用6kV、380V\u002F220V,高压厂用电采用金属封闭铠装手车式开关柜，低压厂用电采用抽屉式开关柜，在开关柜的布置中，回答下列问题。 低压配电盘为单列布置，其盘后操作通道的最小宽赛应为（）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"0.8m；",{"key":24,"text":89,"correct":22},"1.0ms；",{"key":28,"text":91,"correct":26},"1.2m；",{"key":31,"text":93,"correct":22},"1.4m。",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},1022961,"水力发电厂低压厂用电系统，低压电器选择和组合原则如下，请进行判断。 以下分断能力校验，有误的是（）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"校验主配电盘，重要分配电盘低压电器的分断能力时，应计及容量大于20kW的电动机反馈电流；",{"key":24,"text":101,"correct":22},"低压保护电器分断能力校检应采用安装地点的预期短路电流（周期分量有效值），其值应不大于断路器額定短路分断能力；",{"key":28,"text":103,"correct":22},"315kVA及以下的变压器校验短路分断能力时可不计及低压电动机反馈电流；",{"key":31,"text":105,"correct":26},"短路分断能力的校验应采用三相短路电流，三相四线制系统宜采用单相接地短路电流。",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},1022962,"水力发电厂低压厂用电系统，低压电器选择和组合原则如下，请进行判断。 厂用电系统发生短路时，应保证其供电回路各级保护电器有选择动作。在下述的低压电器组合中’正确的是（）。",[110,112,114,116],{"key":20,"text":111,"correct":26},"当支线采用断路器作短路保护时，干线可釆用断路器作保护，此时，干线上的断路器应带延时动作；",{"key":24,"text":113,"correct":22},"当支线采用熔断器作短路保护时，干线也采用熔断器作保护，千线上的熔断器熔件应比支线熔断器熔件大一级级差；",{"key":28,"text":115,"correct":22},"当支线采用断路器作短路保护时，干线可采用熔断器作保护，干线上的熔断器熔断时间在考虑误差后应取断路器的分闸时间的1.3倍；",{"key":31,"text":117,"correct":22},"当支线采用熔断器作短路保护时，干线可采用断路器作保护，此时，干线上的断路器应帝延时时间应取考虑误差后的熔断器熔断时间的1.2倍。",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},1022963,"水力发电厂低压厂用电系统，低压电器选择和组合原则如下，请进行判断。 低压电器的动、热稳定校验，下述各项正确的是（）。",[122,124,126,128],{"key":20,"text":123,"correct":26},"用限流熔断器保护的电器和导体，可不校脸热稳定和动稳定；",{"key":24,"text":125,"correct":22},"额定电流为60A以下的熔断器保护的电器和导体，可不校检热稳定和动稳定；",{"key":28,"text":127,"correct":22},"当熔件额定电流不大于电缆额定载流量的2倍时，可不校验电缆的热穩定；",{"key":31,"text":129,"correct":22},"限流断路器保护的电器和导体，可不校验热稳定和动稳定。",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":28,"analysis":33},1022964,"水力发电厂低压厂用电系统，低压电器选择和组合原则如下，请进行判断。 \"△\"接线的低压电动机回路用有断相保护功皡的热继电器作断相保护的原因，叙述正确的是（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"电动机短路保护整定值太大，断相时保护不能启动；",{"key":24,"text":137,"correct":22},"断相时外电路线电流虽超过电动机额定电流，但普通热继电器不会动作；",{"key":28,"text":139,"correct":26},"只有断相保护功能的热继电器才能反映电动机断相运行情况；",{"key":31,"text":141,"correct":22},"断路器长延时脱扣器参照虽可反映断相运行，但无选择性，故不采用。",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":28,"analysis":33},1022965,"某火力发电厂装有2台600MW机组，发电机电压为22kV，以发电机变压器组接至500kV配电装置。高压厂用变压器从主变压器低压侧引接，请回答如下问题。 当发电机出口无断路器或负荷开关时，若发电机出口引接2台40\u002F25—25MVA高压厂用分裂变压器；为使分裂绕组額定容量为基准的半穿越阻抗电压不大于10.5%,变压器的半穿越阻抗电压U' dl-2可选择（）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"19%,",{"key":24,"text":149,"correct":22},"17%；",{"key":28,"text":151,"correct":26},"16.8%；",{"key":31,"text":153,"correct":22},"18%。",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":31,"analysis":33},1022966,"某火力发电厂装有2台600MW机组，发电机电压为22kV，以发电机变压器组接至500kV配电装置。高压厂用变压器从主变压器低压侧引接，请回答如下问题。 若高压厂用变压器高压侧三相短路电流为130k A，以分裂绕组额定容量为基准的半穿越阻抗电压为15%，6kV电动机反馈电流为13k A，6kV断路器开断电流可选择（）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"31.5kA；",{"key":24,"text":161,"correct":22},"40kA；",{"key":28,"text":163,"correct":22},"50kA；",{"key":31,"text":165,"correct":26},"A和B均可。",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":31,"analysis":33},1022967,"某火电厂装有4台300MW机组，发电机电压为20kV,每台发电机以发电机变压器组接入500kV系统，500kV采用3\u002F2断路器接线，出线2回。 若每2台机组设1台启动\u002F备用变压器，全厂设2段公用段，由1、2号机组高压厂用变压器供电，下述有错的是（）。",[170,172,174,176],{"key":20,"text":171,"correct":22},"每台启动\u002F备用变压器高压侧设一台断路器；",{"key":24,"text":173,"correct":22},"两台启动\u002F备用变压器高压侧可共用一台断路器；",{"key":28,"text":175,"correct":22},"两台启动\u002F备用变压器容量各与1、2号机组，3、4号机组高压厂用变压器容量相同；",{"key":31,"text":177,"correct":26},"两台启动\u002F备用变压器采用相同的容量。",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":20,"analysis":33},1022968,"某火电厂装有4台300MW机组，发电机电压为20kV,每台发电机以发电机变压器组接入500kV系统，500kV采用3\u002F2断路器接线，出线2回。 若每台机组设两台汽动给水泵一台电动备用给水泵，全厂公用负荷由1、2号机组高压工作段供电，下述电动给水泵可行供电方式的是（）。",[182,184,186,188],{"key":20,"text":183,"correct":26},"由各机组6kV工作母线供电；",{"key":24,"text":185,"correct":22},"由全厂公用母线供电；",{"key":28,"text":187,"correct":22},"1,2号机組由6kV公用母线段供电，3、4号机组由4、3号机组6kV工作母线段供电；",{"key":31,"text":189,"correct":22},"1、2号机组由6kV工作母线段供电，3、4号机组由6kV公用母线段供电。",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":28,"analysis":33},1022969,"某火电厂装有4台300MW机组，发电机电压为20kV,每台发电机以发电机变压器组接入500kV系统，500kV采用3\u002F2断路器接线，出线2回。 若电厂江边取水泵房距电厂5km，有6kV取水泵数台，对其可能的供电方式是（）。",[194,196,198,200],{"key":20,"text":195,"correct":22},"由1号机组高压厂用工作母线经升压变压器引2回架空线路供电；",{"key":24,"text":197,"correct":22},"由3、4号机组各经升压器变压器引2回架空线路供电；",{"key":28,"text":199,"correct":26},"若公用段由1、2号启动\u002F备用变压器供电，也可由公用段经升压变压器引2回架空线路供电；",{"key":31,"text":201,"correct":22},"由厂内高压配电装置不同母线段引2回线路作工作电源和备用电源。",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":28,"analysis":33},1022970,"某电厂装设2X300MW汽轮发电机组，每台机组厂用高压6kV母线设2段母线，发电机电压为18kV，厂用工作变压器由发电机出口引接。 1、2号机组工作I A，IIA段计算负荷约为19730kVA,IB,IIB段母线计算负荷为1540kVA,2段6kV母线重复容量为3850kVA；若全厂公用负荷由启动\u002F备用变供电，设置2段母线，每段计算负荷各约5750kV A，6380kVA,则可选择的厂用髙压工作变压器形式和容量为（）。",[206,208,210,212],{"key":20,"text":207,"correct":22},"1台分裂变压器，容量40\u002F2020MVA；",{"key":24,"text":209,"correct":22},"2台双绕组变压器，容量均为20MVA；",{"key":28,"text":211,"correct":26},"1台分裂变压器，容量40\u002F2525MVA；",{"key":31,"text":213,"correct":22},"1台双绕组变压器，容量均为40MVA。",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":31,"analysis":33},1022971,"某电厂装设2X300MW汽轮发电机组，每台机组厂用高压6kV母线设2段母线，发电机电压为18kV，厂用工作变压器由发电机出口引接。 考虑高压厂用变压器高压侧为无穷大电源，且6kV工作母线最大电动机反馈电流为12.5kA,为使髙压厂用电系统采用轻型电器设备，若髙压厂用变压器采用40\u002F25—25MVA分裂变压器时，其中穿越阻抗电压U'dl-2最小可选（）。(精确到小数点后2位）",[218,220,221,223],{"key":20,"text":219,"correct":22},"16.5%；",{"key":24,"text":149,"correct":22},{"key":28,"text":222,"correct":22},"14.5%；",{"key":31,"text":224,"correct":26},"15%。",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":24,"analysis":33},1022972,"某电厂装设2X300MW汽轮发电机组，每台机组厂用高压6kV母线设2段母线，发电机电压为18kV，厂用工作变压器由发电机出口引接。 若采用25MVA双绕组变压器，其他条件同（2)，则变压器阻抗电压U4最小可选（）。",[229,231,233,235],{"key":20,"text":230,"correct":22},"14%；",{"key":24,"text":232,"correct":26},"10.5%；",{"key":28,"text":234,"correct":22},"9.2%；",{"key":31,"text":236,"correct":22},"9%.",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":28,"analysis":33},1022973,"某火电厂装设2X300MW汽轮发电机组，发电机电压18kV,以发电机变压器组接至220kV母线，220kV母线采用双母线双分段接线，电厂最终为4X300MW容量。电厂每台机组设2段6kV髙压母线，由1台40\u002F25—25MV A、18±2X2.3 6.3kV分裂变压器向二段6kV母线供电。试选择备用\u002F启动变压器。 启动\u002F备用变压器引接方式较合理的是（）。",[241,243,245,247],{"key":20,"text":242,"correct":22},"由厂外引220kV线路接厂用启动\u002F备用变压器；",{"key":24,"text":244,"correct":22},"由厂外110kV变电所引接厂用启动\u002F备用变压器；",{"key":28,"text":246,"correct":26},"由电厂220kV母线引接厂用启动\u002F备用变压器；",{"key":31,"text":248,"correct":22},"由发电机出口引接启动\u002F备用变压器。",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":28,"analysis":33},1022974,"某火电厂装设2X300MW汽轮发电机组，发电机电压18kV,以发电机变压器组接至220kV母线，220kV母线采用双母线双分段接线，电厂最终为4X300MW容量。电厂每台机组设2段6kV髙压母线，由1台40\u002F25—25MV A、18±2X2.3 6.3kV分裂变压器向二段6kV母线供电。试选择备用\u002F启动变压器。 高压启动\u002F备用变压器采用分裂变压器、若电源引接点电压波动超过±5%,启动\u002F备用变压器的变比应采用（）。",[253,255,257,259],{"key":20,"text":254,"correct":22},"242±2X2.5%\u002F6.3~6.3kV；",{"key":24,"text":256,"correct":22},"242±2X5%\u002F6.3~6.3kV；",{"key":28,"text":258,"correct":26},"242±8X1.25%\u002F6.3~6.3kV；",{"key":31,"text":260,"correct":22},"242±4X2.5\u002F6.3~6.3kV。",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":24,"analysis":33},1022975,"某火电厂装设2X300MW汽轮发电机组，发电机电压18kV,以发电机变压器组接至220kV母线，220kV母线采用双母线双分段接线，电厂最终为4X300MW容量。电厂每台机组设2段6kV髙压母线，由1台40\u002F25—25MV A、18±2X2.3 6.3kV分裂变压器向二段6kV母线供电。试选择备用\u002F启动变压器。 若全厂公用负荷的计算负荷为7640kV A，设置两段6kV公用段时，每段计算负荷O1A段为5600kVA,O1B段为6250kVA,则公用段的供电方式可以（）。",[265,267,269,271],{"key":20,"text":266,"correct":22},"启动\u002F备用变压器每个低压绕组共带一段公用段，1号机组高压厂用变压器作公用段的备用；",{"key":24,"text":268,"correct":26},"启动\u002F备用变压器每个低压绕组各带一段公用段，1、2号机组高压厂用变压器各作一段公用段的备用；",{"key":28,"text":270,"correct":22},"1号机组高压厂用变压器每个低压绕組各带一段公用段，启动\u002F备用变压器作公用段的备用；",{"key":31,"text":272,"correct":22},"2号机组高压厂用变压器每个低压绕组各带一段公用段，启动\u002F备用变压器作公用段的备用。",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":28,"analysis":33},1022976,"某火电厂设有2X125MW机组，2台机以发电机变压器组接至220kV母线，220kV为双母线接线，出线2回，发电机电压为13.8kV，每台机厂用电负荷计算选择18000kVA,采用20kVA双绕组髙压厂用变压器向6kV工作母线供电（每台机组分2段），厂用高压工作变压器考虑由发电机出口引接。 由发电机出口引接的厂用分支线可（）。",[277,279,281,283],{"key":20,"text":278,"correct":22},"装设不必满足动稳定要求的断路器；",{"key":24,"text":280,"correct":22},"装设断路器，若断路器开断电流不满足要求，但应采取措施仅允许在开断电流范围切除故障；",{"key":28,"text":282,"correct":26},"装设能满足动稳定要求的隔离开关或连接片；",{"key":31,"text":284,"correct":22},"B和C均可。",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":31,"analysis":33},1022977,"某火电厂设有2X125MW机组，2台机以发电机变压器组接至220kV母线，220kV为双母线接线，出线2回，发电机电压为13.8kV，每台机厂用电负荷计算选择18000kVA,采用20kVA双绕组髙压厂用变压器向6kV工作母线供电（每台机组分2段），厂用高压工作变压器考虑由发电机出口引接。 当发电机出口无断路器或负荷开关时，高压厂用变压器阻抗电压为（）。",[289,291,292,294],{"key":20,"text":290,"correct":22},"12%；",{"key":24,"text":230,"correct":22},{"key":28,"text":293,"correct":22},"15%；",{"key":31,"text":295,"correct":26},"10.5%。",{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":24,"analysis":33},1022978,"某火电厂设有2X125MW机组，2台机以发电机变压器组接至220kV母线，220kV为双母线接线，出线2回，发电机电压为13.8kV，每台机厂用电负荷计算选择18000kVA,采用20kVA双绕组髙压厂用变压器向6kV工作母线供电（每台机组分2段），厂用高压工作变压器考虑由发电机出口引接。 该变压器的调压方式、范围和级电压应为（）。",[300,302,304,306],{"key":20,"text":301,"correct":22},"13.8±8X1.25%\u002F6.3kV有载调压变压器；",{"key":24,"text":303,"correct":26},"13.8±2X2.5%\u002F6.3kV无励磁调压变压器；",{"key":28,"text":305,"correct":22},"13.8±2X5%\u002F6.3kV无励磁调厍变压器；",{"key":31,"text":307,"correct":22},"13.8±4X2.5\u002F6.3kV有载调压变压器。",{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":28,"analysis":33},1022979,"某火电厂装设2台600MW机组，高压厂用电每台机组设2段6kV工作母线，并设2段6kV公用母线。 主厂房汽机380V\u002F220V低压供电拟分成二段（A段及B段），计算负荷A段为893kVA,B段为1037kVA,重复负荷为601kV A，汽机低压工作变压器台数和容量为（）。",[312,314,316,318],{"key":20,"text":313,"correct":22},"选择1台1600kVA变压器供2段母线；",{"key":24,"text":315,"correct":22},"选择3台1250kVA变压器供2段母线；",{"key":28,"text":317,"correct":26},"选择2台1600kVA变压器分别供2段母线，互为备用；",{"key":31,"text":319,"correct":22},"选择1台1250kVA及1台1600kVA变压器分别供电2段母线。",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":24,"analysis":33},1022980,"某火电厂装设2台600MW机组，高压厂用电每台机组设2段6kV工作母线，并设2段6kV公用母线。 工作变压器引接方式正确的是（）。",[324,326,328,330],{"key":20,"text":325,"correct":22},"由2台机组的6kV工作母线分别各接1台变压器；",{"key":24,"text":327,"correct":26},"由本台机组的6kV工作母线（A及B段）对应各接1台本机组的汽机工作低压变珥器；",{"key":28,"text":329,"correct":22},"由6kV公用段各接1台汽机低压工作变压器；",{"key":31,"text":331,"correct":22},"由本台机组的6kV工作母线接1台变压器，另1台（或2台）接自6kV公用母线段。",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":24,"analysis":33},1022981,"某火电厂装设2台600MW机组，高压厂用电每台机组设2段6kV工作母线，并设2段6kV公用母线。 考虑一般低压电器对短路电流的承受能力，该低压厂用变压器阻抗电压宜选择(）。",[336,338,340,342],{"key":20,"text":337,"correct":22},"Ud=10%；",{"key":24,"text":339,"correct":26},"Ud=8%；",{"key":28,"text":341,"correct":22},"Ud=6%,",{"key":31,"text":343,"correct":22},"经计算应请制造厂提供专门的高阻抗变压器。",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":31,"analysis":33},1022982,"某火电厂装设600MW机组2台，动力中心为单母线接线；锅炉低压变压器380V\u002F220V2台动力中心为单母线接线。均为明备用接线方式。 每台机组根据计算保安负荷选择1台1100kW柴油发电机作为交流保安电源，以下各项说法不正确的有（）。 A.柴油发电机带负荷启动一台最大容量的电动机时，能承受150%Se (发电机额定容量kV",[348,350,352,354],{"key":20,"text":349,"correct":22},"时间为15s来校验；",{"key":24,"text":351,"correct":22},"发电机使用地点环境条件不同于标准使用条件时，应对柴油机的输出功率进行修正；",{"key":28,"text":353,"correct":22},"柴油机实际榆出功率与初始投入的起始功率（kW)之比应不小于2；",{"key":31,"text":355,"correct":26},"柴油发电机应采用应急塑，快速电自启动，失电后第一次自启动恢复供电时向应取10~15s。",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":20,"analysis":33},1022983,"某火电厂装设600MW机组2台，动力中心为单母线接线；锅炉低压变压器380V\u002F220V2台动力中心为单母线接线。均为明备用接线方式。 若厂用电380V\u002F220V系统为中性点直接接地，柴油发电机中性点接地方式应为（）。",[360,362,364,366],{"key":20,"text":361,"correct":26},"直接接地方式；",{"key":24,"text":363,"correct":22},"经高电阻接地方式；",{"key":28,"text":365,"correct":22},"不接地方式；",{"key":31,"text":165,"correct":22},{"id":368,"libraryId":5,"type":15,"typeLabel":16,"stem":369,"options":370,"answer":31,"analysis":33},1022984,"某火电厂装设600MW机组2台，动力中心为单母线接线；锅炉低压变压器380V\u002F220V2台动力中心为单母线接线。均为明备用接线方式。 不考虑脱硫系统，若每机组汽机、锅炉各设一段保安MC",[371,373,375,377],{"key":20,"text":372,"correct":22},"则每机组从汽机、锅炉动力中心各引保安MCC工作电源，每段保安MCC的工作电源（不含柴油发电机电源）回路数宜为（）。",{"key":24,"text":374,"correct":22},"5回； B4回；",{"key":28,"text":376,"correct":22},"3回；",{"key":31,"text":378,"correct":26},"2回。",{"id":380,"libraryId":5,"type":15,"typeLabel":16,"stem":381,"options":382,"answer":20,"analysis":33},1022985,"某500kV变电所装设2台750MV主变压器（由3台250MVA500kV单相三绕组自耦变压器组成），低压侧电压为35kV。 该变电所所用变压器宜装（）。",[383,385,387,389],{"key":20,"text":384,"correct":26},"3台；",{"key":24,"text":386,"correct":22},"2台；",{"key":28,"text":388,"correct":22},"1台；",{"key":31,"text":390,"correct":22},"A和B均可，",{"id":392,"libraryId":5,"type":15,"typeLabel":16,"stem":393,"options":394,"answer":28,"analysis":33},1022986,"某500kV变电所装设2台750MV主变压器（由3台250MVA500kV单相三绕组自耦变压器组成），低压侧电压为35kV。 关于所用变压器配置，所用电接线及负荷供电方式，下述有错的是（）。 A.两台所用变压器分别由两台主变压器低压侧引接，第3台所用变压器从临近变电所引接。",[395,397,399,401],{"key":20,"text":396,"correct":22},"所用电系统设两段母线，单母线接线，母线间设联络断路器。两段母线分别由两台主变压器低压侧供电，从所外引接的变压器作备用电源。",{"key":24,"text":398,"correct":22},"所用电负荷均从所用配电屏放射方式供电。两台主变压器B相冷却控制箱从1号所用电母线？1接两回电源，并设置电源自动切换装置，切换后各引1回电源至",{"key":28,"text":400,"correct":26},"C箱冷却控制箱。",{"key":31,"text":402,"correct":22},"配电装置断路器，隔离开关橾作及加热负荷采用环形供电方式，电源从两段所用电母线引接，环网中设刀开关，开环运行。",{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":28,"analysis":33},1022987,"某500kV变电所装设2台750MV主变压器（由3台250MVA500kV单相三绕组自耦变压器组成），低压侧电压为35kV。",[407,409,411,413],{"key":20,"text":408,"correct":22},"每相主变压器冷却用负荷为15.5kW,全所其他动力负荷约为500kW，照明负荷约为90kW，电热负荷约为40kW,若考虑所用变压器取相同的容量，则所用变压器容量为（）。",{"key":24,"text":410,"correct":22},"500kVA；",{"key":28,"text":412,"correct":26},"630kVA5 C800kVA；",{"key":31,"text":414,"correct":22},"1000kVA。",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":28,"analysis":33},1022988,"某新建2X300MW火力发电厂为单元接线。厂用电系统采用6kV和380V两级电压，其中每台机组设 A、B两段6kV工作段，全厂设01 A、01B两段6kV公用段。 若每台机组设两台6kV电动给水泵，每台给水泵设一台6kV前置泵，则电动给水泵B和前置菜B应分别由（）。",[419,421,423,425],{"key":20,"text":420,"correct":22},"电动给水泵B由6kV工作A段供电，前罝泵B由6kV工作8段供电；",{"key":24,"text":422,"correct":22},"电动给水泵B由6kV工作A段供电，前置泵B由6kV工作A段供电；",{"key":28,"text":424,"correct":26},"电动给水泵B由6kV工作B段供电，前置泵B由6kV工作B段供电；",{"key":31,"text":426,"correct":22},"电动给水泵B由6kV工作B段供电，前置泵B由6kV工作A段供电。",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":28,"analysis":33},1022989,"水电厂厂用电最大负荷计算应优先采用（）。",[431,433,435,437],{"key":20,"text":432,"correct":22},"换算系数法；",{"key":24,"text":434,"correct":22},"负荷统计法；",{"key":28,"text":436,"correct":26},"综合系数法；",{"key":31,"text":438,"correct":22},"轴功率法。",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":28,"analysis":33},1022990,"水电厂电动机的外壳防护等级选择，在水轮机室等潮湿环境外壳防护等级宜达到().",[443,445,447,449],{"key":20,"text":444,"correct":22},"IP23,",{"key":24,"text":446,"correct":22},"IP32；",{"key":28,"text":448,"correct":26},"IP44；",{"key":31,"text":450,"correct":22},"IP54。",{"id":452,"libraryId":5,"type":15,"typeLabel":16,"stem":453,"options":454,"answer":28,"analysis":33},1022991,"水电厂厂用电电气设备布置中，质量大于（）电气设备，应在其所在位置上部设置吊环。",[455,457,459,461],{"key":20,"text":456,"correct":22},"500kg；",{"key":24,"text":458,"correct":22},"800kg；",{"key":28,"text":460,"correct":26},"10OOkg；",{"key":31,"text":462,"correct":22},"1500kg.",{"id":464,"libraryId":5,"type":15,"typeLabel":16,"stem":465,"options":466,"answer":24,"analysis":33},1022992,"水电厂两台干式变压器之间最小距离为（）。",[467,469,471,473],{"key":20,"text":468,"correct":22},"800mm；",{"key":24,"text":470,"correct":26},"10OOmm；",{"key":28,"text":472,"correct":22},"1200mm；",{"key":31,"text":474,"correct":22},"1500mm.",{"id":476,"libraryId":5,"type":15,"typeLabel":16,"stem":477,"options":478,"answer":28,"analysis":33},1022993,"容量为（）以上变压器400V出线端子与其引接电缆间宜设置过渡母线。",[479,481,483,484],{"key":20,"text":480,"correct":22},"315kVA；",{"key":24,"text":482,"correct":22},"400kVA；",{"key":28,"text":410,"correct":26},{"key":31,"text":485,"correct":22},"630kVA。",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":28,"analysis":33},1022994,"水电厂设计中，标称电压超过（）容易被触及的裸带电体必须设置遮护物，其防护等级不应低于IP2x。",[490,492,494,496],{"key":20,"text":491,"correct":22},"6V；",{"key":24,"text":493,"correct":22},"12V；",{"key":28,"text":495,"correct":26},"24V；",{"key":31,"text":497,"correct":22},"36V。",{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":20,"analysis":33},1022995,"水电厂低压厂用电系统，校验主配电屏及重要分配电屏低压电器的分断能力时，应计及（）以上电动机反馈电流，",[502,504,506,508],{"key":20,"text":503,"correct":26},"20kW,",{"key":24,"text":505,"correct":22},"30kW；",{"key":28,"text":507,"correct":22},"45kW；",{"key":31,"text":509,"correct":22},"55kW。",{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":28,"analysis":33},1022996,"水电厂当炼体的额定电流不大于电缆允许载流量的（），且供电回路末端的最小短路电流大于熔体额定电流的（）时，可不校验电缆的热稳定。",[514,516,518,520],{"key":20,"text":515,"correct":22},"2.5倍，4倍；",{"key":24,"text":517,"correct":22},"2.5倍，5倍；",{"key":28,"text":519,"correct":26},"3倍，4倍；",{"key":31,"text":521,"correct":22},"3倍，5倍。",{"id":523,"libraryId":5,"type":15,"typeLabel":16,"stem":524,"options":525,"answer":28,"analysis":33},1022997,"水电厂厂用电设计的要求是（）。",[526,528,530,532],{"key":20,"text":527,"correct":22},"采用新技术和新设备；",{"key":24,"text":529,"correct":22},"满足业主的要求；",{"key":28,"text":531,"correct":26},"技术先进、经济合理、安全满发；",{"key":31,"text":533,"correct":22},"投资最省，",{"id":535,"libraryId":5,"type":15,"typeLabel":16,"stem":536,"options":537,"answer":31,"analysis":33},1022998,"()高压母线上引接水电厂厂用电源’不需进行技术经济比较论证。",[538,540,542,544],{"key":20,"text":539,"correct":22},"500kV；",{"key":24,"text":541,"correct":22},"220kV；",{"key":28,"text":543,"correct":22},"110kV；",{"key":31,"text":545,"correct":26},"35kV。",{"id":547,"libraryId":5,"type":15,"typeLabel":16,"stem":548,"options":549,"answer":28,"analysis":33},1022999,"大型水电厂全厂机组运行时，所连接的厂用电电源的数量应不少于（）。",[550,552,554,556],{"key":20,"text":551,"correct":22},"1个；",{"key":24,"text":553,"correct":22},"2个；",{"key":28,"text":555,"correct":26},"3个；",{"key":31,"text":557,"correct":22},"4个。",{"id":559,"libraryId":5,"type":15,"typeLabel":16,"stem":560,"options":561,"answer":20,"analysis":33},1023000,"水电厂厂用电系统采用高、低两级电压供电还是一级低压供电，与（)无关。",[562,564,566,568],{"key":20,"text":563,"correct":26},"简化供电接线；",{"key":24,"text":565,"correct":22},"厂用电负荷大小；",{"key":28,"text":567,"correct":22},"有无高压电动机；",{"key":31,"text":569,"correct":22},"厂用电负荷分布情况。",{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":24,"analysis":33},1023001,"装机容量为200MW以下，单机容量在100MW及以下且发电机引出线未采用离相封闭母线的水电厂，厂用变压器容量在（）以下时，厂用变压器高压侧可采用高压熔断器或高压限流熔断器组合保护装置保护（分断能力满足要求前提下）。",[574,576,578,580],{"key":20,"text":575,"correct":22},"10OOkVA；",{"key":24,"text":577,"correct":26},"800kVA；",{"key":28,"text":579,"correct":22},"630kVA；",{"key":31,"text":581,"correct":22},"500kVA。",{"id":583,"libraryId":5,"type":15,"typeLabel":16,"stem":584,"options":585,"answer":20,"analysis":33},1023002,"中型水电厂厂用电变压器与近区用电变压器的供电方式宜选用（.）。",[586,588,590,592],{"key":20,"text":587,"correct":26},"厂用电变压器与近区用电变压器的高压側分别装设断路器；",{"key":24,"text":589,"correct":22},"厂用电变压器与近区用电变压器的高压例合用一组断路器；",{"key":28,"text":591,"correct":22},"厂用电变压器与近区用电变压器以三绕组变压器供电；",{"key":31,"text":593,"correct":22},"厂用电变压器“T”接在近区供电线路上。",{"id":595,"libraryId":5,"type":15,"typeLabel":16,"stem":596,"options":597,"answer":24,"analysis":33},1023003,"对有紧急泄洪要求的大坝闸门启闭机，其中特别重要的泄洪设施又无法以手动方式开启闸门，为满足泄洪要求，经论证可设()电源。",[598,600,601,602],{"key":20,"text":599,"correct":22},"4个；",{"key":24,"text":555,"correct":26},{"key":28,"text":553,"correct":22},{"key":31,"text":603,"correct":22},"1个。",{"id":605,"libraryId":5,"type":15,"typeLabel":16,"stem":606,"options":607,"answer":24,"analysis":33},1023004,"水电厂用低压断路器保护的回路，短路电流不应小于断路器瞬时或短延时过电流脱扣器整定电流的（）。",[608,610,612,614],{"key":20,"text":609,"correct":22},"1.2倍；",{"key":24,"text":611,"correct":26},"1.3倍；",{"key":28,"text":613,"correct":22},"1.4倍；",{"key":31,"text":615,"correct":22},"1.5倍。",[617,620,623,626,629,632],{"id":15,"name":618,"category":7,"favorite":619},"领导干部任职前廉政法规知识测试题",92,{"id":621,"name":622,"category":7,"favorite":15},595,"建筑结构与设备",{"id":624,"name":625,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":627,"name":628,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":630,"name":631,"category":7,"favorite":8},534,"BIM工程师",{"id":633,"name":631,"category":7,"favorite":8},535]