[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-751-24":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":620},{"id":5,"name":6,"category":7,"favorite":8},751,"电气工程师发输变电专业","建筑工程",0,24,50,2670,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,272,284,296,308,320,332,344,356,368,380,392,404,416,428,440,452,464,476,488,500,512,524,536,548,560,572,584,596,608],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1022905,1,"单选题","某电厂装有2台600MW机组，每台机组设有2段6kV厂用高压母线，向各厂用电负荷供电，6kV采用手车式开关柜。6kV厂用母线接有1台6300kW给水泵电动机。 6kV—段母线上接有1台6300kW电动给水泵，应选择开关柜上配置的保护与操作设备型式的型式有（）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","采用少油断路器；",false,{"key":24,"text":25,"correct":22},"B","采用F+C组合设备；",{"key":27,"text":28,"correct":22},"C","采用3F6断路器；",{"key":30,"text":31,"correct":32},"D","采用真空断路器。",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1022906,"某电厂装有2台600MW机组，每台机组设有2段6kV厂用高压母线，向各厂用电负荷供电，6kV采用手车式开关柜。6kV厂用母线接有1台6300kW给水泵电动机。 6kV厂用母线短路冲击电流为117k A，断路器动稳定保证值应选择（）。",[38,40,42,44],{"key":20,"text":39,"correct":32},"130kA；",{"key":24,"text":41,"correct":22},"110kA；",{"key":27,"text":43,"correct":22},"160kA；",{"key":30,"text":45,"correct":22},"180kA。",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1022907,"某电厂装有2台600MW机组，每台机组设有2段6kV厂用高压母线，向各厂用电负荷供电，6kV采用手车式开关柜。6kV厂用母线接有1台6300kW给水泵电动机。 6300kW6kV电动给水泵电动机，以下保护可不装设的有（）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"纵联差动保护及过电流保护；",{"key":24,"text":53,"correct":32},"电动机定子绕组匝间短路保护；",{"key":27,"text":55,"correct":22},"单相接地保护；",{"key":30,"text":57,"correct":22},"低电压保护。",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1022908,"某新建2X300MW火力发电厂为单元接线。厂用电系统采用6kV和380V两级电压，其中每台机组设 A、B两段6kV工作段，全厂设01 A、01B两段6kV公用段。 若每台机组设一台电动给水泵，其他6kV辅机和低压厂用变压器均成对设置，容量见表14-1。 考虑公用段（A段计算负荷约5400kV A、B段计算负荷约5500kV A)由1、2号机组6kV工作段供电，选择的分裂变压器容量宜为（）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"40\u002F20-20MVA；",{"key":24,"text":65,"correct":32},"40\u002F25-25MVA；",{"key":27,"text":67,"correct":22},"40\u002F20—25MVA；",{"key":30,"text":69,"correct":22},"50\u002F25—25MVA。",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1022909,"某新建2X300MW火力发电厂为单元接线。厂用电系统采用6kV和380V两级电压，其中每台机组设 A、B两段6kV工作段，全厂设01 A、01B两段6kV公用段。 经估算，6kV高压厂用电工作B段所连设备的电缆总电容单相值为2.13μF,该厂用电系统宜采用（）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"髙电阻接地；",{"key":24,"text":77,"correct":32},"低电阻接地；",{"key":27,"text":79,"correct":22},"消弧线圈接地（欠补偿）；",{"key":30,"text":81,"correct":22},"消弧线围接地（过补偿）。",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":30,"analysis":33},1022910,"某火力发电厂厂用电电压为6kV、380V,均采用中性点髙电阻接地方式。请回答如下问题。 高压厂用变压器采用双绕组油浸式，额定容量16MVA,Ydll接线。变压器接于发电机出口，低压侧向两个分段供电（电缆两端装设有断路器），应装设的继电保护是：①采用两相两继电器接线的过电流保护；②采用两相三继电器接线的过电流保护；③纵联差动保护；④速断保护；⑤瓦斯保护；⑥低压侧分支差动保护。可选择其中的（）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"①③④⑤",{"key":24,"text":89,"correct":22},"②③⑤⑥；",{"key":27,"text":91,"correct":22},"①②④⑤；",{"key":30,"text":93,"correct":32},"①③⑤⑥。",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":30,"analysis":33},1022911,"某火力发电厂厂用电电压为6kV、380V,均采用中性点髙电阻接地方式。请回答如下问题。 6kV系统可利用的中性点是（）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"高压厂用变压器的中性点；",{"key":24,"text":101,"correct":22},"—台YNynl2接线的低压厂用变压器一次侧的中性点；",{"key":27,"text":103,"correct":22},"一台YNydll接线的低压厂用变压器一次側的中性点；",{"key":30,"text":105,"correct":32},"专用的三相接地交压器，构成人为的中性点.",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":27,"analysis":33},1022912,"某火力发电厂厂用电电压为6kV、380V,均采用中性点髙电阻接地方式。请回答如下问题。 低压厂用电接地检测装置的构成宜用()。",[110,112,114,116],{"key":20,"text":111,"correct":22},"谐波电流；",{"key":24,"text":113,"correct":22},"馈线和电流；",{"key":27,"text":115,"correct":32},"零序电流；",{"key":30,"text":117,"correct":22},"接地设备上的零序电压。",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":30,"analysis":33},1022913,"某火力发电厂装有4台600MW发电机组，每台机组设一台高压厂用分裂变压器向除脱硫系统以外的厂用负荷供电，每两台机组设一台启动\u002F备用分裂变压器，电源从厂外220kV系统引接。 若全厂公用负荷由1、2号机组高压厂用变压器供电时，启动\u002F备用变压器电源接线方式应至少为（）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"一回线路，一台断路器；",{"key":24,"text":125,"correct":22},"一回线路，两台断路器；",{"key":27,"text":127,"correct":22},"两回线路，一台断路器；",{"key":30,"text":129,"correct":32},"两回线路，两台断路器。",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":27,"analysis":33},1022914,"某火力发电厂装有4台600MW发电机组，每台机组设一台高压厂用分裂变压器向除脱硫系统以外的厂用负荷供电，每两台机组设一台启动\u002F备用分裂变压器，电源从厂外220kV系统引接。 若高压厂用电为6kV，中性点采用高电阻接地方式，电动给水泵额定容量为5000kW,对其保护配置下述表述有错的是（）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"电动给水泵应配置纵联差动保护，保护采用两相两继电器接线；",{"key":24,"text":137,"correct":22},"当纵联差动保护利用电动机机端及中性点电流互感器时，应配置电流速断保护，瞬时动作于跳闸。作为差动保护的后备，还应配置过电流保护，可反时限动作于断路器跳闸。两种保护都可采用两相两继电器接线；",{"key":27,"text":139,"correct":32},"电动机回路（包括电动给水泵电动机）应装设接地检测装置，接地检测装里采用反映零序方向的元件构成，具有记忆瞬时接地性能，动作于信号；",{"key":30,"text":141,"correct":22},"电动给水泵应装设9~10s延时时眼的低电压保护。",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":27,"analysis":33},1022915,"某火力发电厂装有4台600MW发电机组，每台机组设一台高压厂用分裂变压器向除脱硫系统以外的厂用负荷供电，每两台机组设一台启动\u002F备用分裂变压器，电源从厂外220kV系统引接。 主厂房低压变压器额定容量为2000kV A，干式变压器，采用高电阻接地方式，对其保护配置，下述表述有错的是（）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"当电流速断保护灵敏度满足要求时，设置速断保护作主保护，以保护变压器绕组内及引出线的相间短路。保护采用两相三继电器接线，瞬时作用于各侧断路器跳闸；",{"key":24,"text":149,"correct":22},"配置温度保护，作用于信号和跳闸；",{"key":27,"text":151,"correct":32},"设里变压器单相接地短路保护，保护延时作用于各例断路器跳闸；",{"key":30,"text":153,"correct":22},"设置过电流保护，保护带时限作用于各例断路器跳闸。",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":27,"analysis":33},1022916,"某火力发电厂主厂房低压厂用电系统为中性点直接接地，设置两台低压厂用变压器，采用动力中心（P C)和电动机控制中心（MC C)供电方式。 若两台变压器为明备用，下述接钱方式正确的是（）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"两台低压厂用变压器宜手动切换；",{"key":24,"text":161,"correct":22},"动力中心和电动机控制中心宜成对设置，电动机控制中心由对应的动力中心单电源供电；",{"key":27,"text":163,"correct":32},"I类电动机和75kW及以上的II、III类电动机宜由动力中心供电；",{"key":30,"text":165,"correct":22},"对于单台的I、II类电动机应单独设立电动机控制中心，由不同的动力中心引接的双电源供电，凡接有I类负荷，双电源应自动切换。",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":30,"analysis":33},1022917,"某火力发电厂主厂房低压厂用电系统为中性点直接接地，设置两台低压厂用变压器，采用动力中心（P C)和电动机控制中心（MC C)供电方式。 若电动机控制中心接有如下表负荷，动力中心馈电干线和电动机控制中心负荷均采用NT型熔断器作保护时，本例动力中心电动机控制中心（不考虑成组自启动）馈电干线熔断器擦件额定电流应大于（）（电动机功率因数取0.8，启动电流倍数取6)。",[170,172,174,176],{"key":20,"text":171,"correct":22},"160A；",{"key":24,"text":173,"correct":22},"200A；",{"key":27,"text":175,"correct":22},"224A；",{"key":30,"text":177,"correct":32},"261A。",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":27,"analysis":33},1022918,"某火力发电厂装有2X25MW机组，设有发电机母线，以35kV电压与3km外的220kV变电站35kV母线连接。电网供电，现扩建装设2X600MW机组，以500kV接入系统，若扩建机组厂用电率（未统计脱硫系统负荷）估算为5.8%。毎台机组设一台引接于发电机出口的厂用分裂工作变压器（不含脱硫系统负荷），两台机组设一台启动\u002F备用分裂变压器。 启动\u002F备用电源的引接经济可行的方案是（）。",[182,184,186,188],{"key":20,"text":183,"correct":22},"从老厂发电机母线引接；",{"key":24,"text":185,"correct":22},"从老厂35kV母线引接；",{"key":27,"text":187,"correct":32},"外引220kV专用线供给；",{"key":30,"text":189,"correct":22},"从新厂500kV母线引接。",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":27,"analysis":33},1022919,"某火力发电厂装有2X25MW机组，设有发电机母线，以35kV电压与3km外的220kV变电站35kV母线连接。电网供电，现扩建装设2X600MW机组，以500kV接入系统，若扩建机组厂用电率（未统计脱硫系统负荷）估算为5.8%。毎台机组设一台引接于发电机出口的厂用分裂工作变压器（不含脱硫系统负荷），两台机组设一台启动\u002F备用分裂变压器。 经技术经济比较该工程确定外引专用220kV线路作启动\u002F备用电源，启动\u002F备用变压器的中性点应（）。",[194,196,198,200],{"key":20,"text":195,"correct":22},"经隔离开关接地；",{"key":24,"text":197,"correct":22},"隔离开关、避雷器及保护间隙并联接地；",{"key":27,"text":199,"correct":32},"直接接地；",{"key":30,"text":201,"correct":22},"B或C均可。",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":27,"analysis":33},1022920,"某火力发电厂装有2X25MW机组，设有发电机母线，以35kV电压与3km外的220kV变电站35kV母线连接。电网供电，现扩建装设2X600MW机组，以500kV接入系统，若扩建机组厂用电率（未统计脱硫系统负荷）估算为5.8%。毎台机组设一台引接于发电机出口的厂用分裂工作变压器（不含脱硫系统负荷），两台机组设一台启动\u002F备用分裂变压器。 髙压厂用电厂用6kV电压，设置两段母线，经估算母线段最大单相电容电流为6.5A,直接接于髙压厂用变压器中性点的接地电阻为500Ω，对其单相接地保护以下说法不对的是（）。",[206,208,210,212],{"key":20,"text":207,"correct":22},"厂用母线和厂用电源面路单相接地保护可利用通过接地电扭的零序电流实现；",{"key":24,"text":209,"correct":22},"厂用毋线和厂用电源回路单相接地保护可利用母线TV二次侧开口三角形的零序电压实现；",{"key":27,"text":211,"correct":32},"接地电流满足接地故障检测装里灵敏性要求，电动机回路应装设该装置，装置只能由反映零序方向的元件构成；",{"key":30,"text":213,"correct":22},"其他馈线回路接地保护只发信号。",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":27,"analysis":33},1022921,"某火力发电厂装有2X300MW机组，其低压厂用电采用380V，中性点经高电阻接地。 关于髙电阻接地方式特点的叙述，说法有错的是（）。",[218,220,222,224],{"key":20,"text":219,"correct":22},"可以避免单相接地时开关跳闸、电动机停运及两相运行，提高了系统运行可靠性；",{"key":24,"text":221,"correct":22},"交流操作的电动机回路需另设控制变压器；",{"key":27,"text":223,"correct":32},"可以简化厂用电接线；",{"key":30,"text":225,"correct":22},"电容性电流很小，应加入的电阻性电流较大，但应满足接地指示装置灵敏性的要求。",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":20,"analysis":33},1022922,"某火力发电厂装有2X300MW机组，其低压厂用电采用380V，中性点经高电阻接地。 低压厂用电系统采用髙电阻接地方式时，热控配电箱、照明及检修系统的供电方式应作改变，下述说法有错的是（）。",[230,232,234,236],{"key":20,"text":231,"correct":32},"为热控配电箱需在动力中心馈线间隔内装设隔离变压器，变压器二次侧中性点直接接地；",{"key":24,"text":233,"correct":22},"宜设专用照明变压器，照明变压器可由髙压、低压厂用电母线供电，二次侧中性点直接接地。从低压厂用电系统引接的380V\u002F220V照明变压器，也可设分散设置；",{"key":27,"text":235,"correct":22},"在主厂房，检修电源宜从动力中心引接，并在检修配电箱内设置380V\u002F220V检修变压器；",{"key":30,"text":237,"correct":22},"每台600MW机组也可从专门设置一台检修变压器作检修电源，检修变压器同时作照明变压器的备用。",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":27,"analysis":33},1022923,"某火力发电厂装有2X300MW机组，其低压厂用电采用380V，中性点经高电阻接地。 本案例有关单相接地保护的叙述，正确的是（）。",[242,244,246,248],{"key":20,"text":243,"correct":22},"单相接地保护只能利用变压器中性点接地电阻上的零序电压实现，保护动作于信号；",{"key":24,"text":245,"correct":22},"高电阻接地的低压系统动力中心和电动机控制中心的馈线回路应装设单相接地检测装里，检测装置宜由反映零序电流的元件构成，动作于信号；",{"key":27,"text":247,"correct":32},"装有接地检测装置的馈线电缆上应套装零序电流互感器；",{"key":30,"text":249,"correct":22},"回路中若有两根及以上电缆，则每一根电缆上均应套装零序电流互感器，应将每个零序电流互感器的二次绕组并联后接入继电器。",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":27,"analysis":33},1022924,"装机容量2X300MW火力发电厂设计中，需进行厂用电系统短路电流、电压调整、电动机启动时的电压校验等计算，其中： 电压调整计算中采用公式：Rt=1.1xPt\u002FS2t =1.1xUd%\u002FS2t中的数字1.1是考虑（）。",[254,256,258,260],{"key":20,"text":255,"correct":22},"变压器阻抗的正误差；",{"key":24,"text":257,"correct":22},"根据运行经验取的系数；",{"key":27,"text":259,"correct":32},"变压器空载电压与设备額定电压的差异；",{"key":30,"text":261,"correct":22},"A+C。",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":20,"analysis":33},1022925,"装机容量2X300MW火力发电厂设计中，需进行厂用电系统短路电流、电压调整、电动机启动时的电压校验等计算，其中： 高压厂用电短路电流计算采用的公式：XT= (0.9XUdXSj)\u002F(100XSe B)中的系数0.9是考虑（）。",[266,268,269,271],{"key":20,"text":267,"correct":32},"变压器担抗的负误差；",{"key":24,"text":257,"correct":22},{"key":27,"text":270,"correct":22},"变压器阻抗的分教性；",{"key":30,"text":261,"correct":22},{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":27,"analysis":33},1022926,"装机容量2X300MW火力发电厂设计中，需进行厂用电系统短路电流、电压调整、电动机启动时的电压校验等计算，其中： 髙压厂用电短路电流计算应计及电动机反馈电流，则在短路冲击电流计算中，电动机反馈电流的峰值系数Kch.D应取（)。",[276,278,280,282],{"key":20,"text":277,"correct":22},"1.5；",{"key":24,"text":279,"correct":22},"1.6；",{"key":27,"text":281,"correct":32},"1.7；",{"key":30,"text":283,"correct":22},"1.85。",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":30,"analysis":33},1022927,"某水力发电厂装机4 X200MW，均担任峰荷，每台机组均以发电机变压器组单元接线接入厂内110kV升压站，110kV出线4回与两个不同的220kV变电所110kV母线连接。设计中，厂用电确定了如下原则，哪些有误？请进行判断。 厂用电采用两级电压，故厂用工作电源和备用电源的配置考虑（）。",[288,290,292,294],{"key":20,"text":289,"correct":22},"将机组厂用电和全厂公用负荷分别用不同变压器供电；",{"key":24,"text":291,"correct":22},"每台机組设一台自用变压器，自用变压器和公用变压器均从高压厂用电母线引接；",{"key":27,"text":293,"correct":22},"保留的施工变压器向电厂生活区供电；",{"key":30,"text":295,"correct":32},"设置柴油发电机作应急电源。",{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":30,"analysis":33},1022928,"某水力发电厂装机4 X200MW，均担任峰荷，每台机组均以发电机变压器组单元接线接入厂内110kV升压站，110kV出线4回与两个不同的220kV变电所110kV母线连接。设计中，厂用电确定了如下原则，哪些有误？请进行判断。 考虑相邻两台机组自用变压器互为备用，变压器容量应（）。",[300,302,304,306],{"key":20,"text":301,"correct":22},"每台自用变压器容量按两台机组全部I、II类负荷或短时满足最大负荷需要选择；",{"key":24,"text":303,"correct":22},"按带一台变压器正常运行负荷后，还应满足另一台变压器电动机自启动时的电压要求；",{"key":27,"text":305,"correct":22},"选择变压器容量时，不计温度修正系数的影响；",{"key":30,"text":307,"correct":32},"变压器的阻抗和容量选择庄满足空载自启动厂用母线电压不低于60%的要求。",{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":27,"analysis":33},1022929,"某装机2X300MW的火力发电厂，低压厂用电系统为中性点直接接地。每台机组设一台800kW的柴油发电机作交流保安电源。请对如下设计原则作出判断。 交流保安电源接线如下，其叙述不对的是（）。 A.柴油发电机电压和中性点接地方式与低压厂用电系统一致；",[312,314,316,318],{"key":20,"text":313,"correct":22},"交流保安电源母线采用单母线接线；",{"key":24,"text":315,"correct":22},"低压厂用电系统变压器为1600kV",{"key":27,"text":317,"correct":32},"明备用方式接线，单母线接线，变压器接于对应母线，两段母线各引一回电缆与保安电源连接；",{"key":30,"text":319,"correct":22},"考虑机组脱硫保安负荷由机組保安电源供电。",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":24,"analysis":33},1022930,"某装机2X300MW的火力发电厂，低压厂用电系统为中性点直接接地。每台机组设一台800kW的柴油发电机作交流保安电源。请对如下设计原则作出判断。 柴油发电机组型式和容量选择中，下面的说法不正确的是（）。 A.柴油发电机组应选择快选自启动的应急型，保安电濛母线失电后第一次启动并恢1母线供电时间取15~20s，应具有自动启动3次成功投入运行的性能;",[324,326,328,330],{"key":20,"text":325,"correct":22},"发电机的容量选择的负荷计算方法采用换算系数法，换算系数K取0.7；",{"key":24,"text":327,"correct":32},"发电机组应进行1h运行输出功率校验，其允许承受的负载能力应不小于aPe\u002Fη",{"key":27,"text":329,"correct":22},"式中a为柴油发电机组功率配合系数，Pc为计算负荷的有功功率，ηG先为发电机的效率；",{"key":30,"text":331,"correct":22},"柴油机的启动方式宜采用电启动。",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":24,"analysis":33},1022931,"某装机2X300MW的火力发电厂，低压厂用电系统为中性点直接接地。每台机组设一台800kW的柴油发电机作交流保安电源。请对如下设计原则作出判断。 柴油发电机组保护及自动装置下述配置不正确的是（ ）。",[336,338,340,342],{"key":20,"text":337,"correct":22},"发电机中性点各相引出线上装设两段式过电流保护；",{"key":24,"text":339,"correct":32},"发电机组及保安电源馈线装设接地检测装里；",{"key":27,"text":341,"correct":22},"在柴油发电机房内装设就地同期装置；",{"key":30,"text":343,"correct":22},"保安段的工作电源和柴油发电杌之间采用串联断电切换。",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":24,"analysis":33},1022932,"某500kV变电所装有两台主变压器，所用电设计确定了如下主要原则和内容，请判断其正确性。 所用电接线主要原则如下，下述各项有误的是（）。",[348,350,352,354],{"key":20,"text":349,"correct":22},"所用电变压器采用双绕组变压器，设置两台，分别从主变最低电压侧引接，主变压器采用有载调压，所用变压器采用无载谪压变庄器；",{"key":24,"text":351,"correct":32},"所用电采用380V\u002F220V中性点直接接地系统，采用单母线分段接线，两台所用变压器分接于两段母线上；",{"key":27,"text":353,"correct":22},"设置一台专用所用备用变压器，电源从35kV系统引接，采用有载调压变压器；",{"key":30,"text":355,"correct":22},"根接远动要求，变电所设置一套UPS装置。",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":30,"analysis":33},1022933,"某500kV变电所装有两台主变压器，所用电设计确定了如下主要原则和内容，请判断其正确性。 关于所用电负荷连接，下面的说法不正确的是（）。",[360,362,364,366],{"key":20,"text":361,"correct":22},"拟将所用电中动力负荷和照明负荷合用一个电源。互为备用的两台设备，分别从不同的两个电源供电；",{"key":24,"text":363,"correct":22},"因主变压器采用单相变压器；故在A相主变压器风冷控制箱内设里双电源A动切换装置，从自动切换装里后各引一回供电电缆分别接至B相、C相风冷控制箱；",{"key":27,"text":365,"correct":22},"在控制楼内设置专用配电盘，由所用电引双回电源；",{"key":30,"text":367,"correct":32},"500kV配电装置断路器係离开关操动机构、端子箱设单回路环行供电线路，每个间隔设隔离开关，正常时开环运行。",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":20,"analysis":33},1022934,"某500kV变电所装有两台主变压器，所用电设计确定了如下主要原则和内容，请判断其正确性。 负荷统计和变压器容量选择中，下列说法错误的是（）。",[372,374,376,378],{"key":20,"text":373,"correct":32},"负荷计算采用换算系数法，动力负荷的换算系数K取0.8；",{"key":24,"text":375,"correct":22},"两台互为备用的设备其负荷在选择变压器容量时应全部计算；",{"key":27,"text":377,"correct":22},"连续运行的设备应全部计算；",{"key":30,"text":379,"correct":22},"备用变压器的容量应与工作变压器容量相同。",{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":27,"analysis":33},1022935,"高压厂用电系统采用高电阻接地，在中性点设备选择中，有如下问题值得研究。 系统中性点的确定，叙述有误的是（）。",[384,386,388,390],{"key":20,"text":385,"correct":22},"系统中性点应首先选择髙压厂用变压器负载侧的中性点；",{"key":24,"text":387,"correct":22},"高压厂用变压器负载侧中性点无法引出时，可设专用的三相接地变压器，构成人为的中性点；",{"key":27,"text":389,"correct":32},"可利用一台高压厂用电供电的低压厂用变压器高压侧的中性点，接线可采用Ynyn12；",{"key":30,"text":391,"correct":22},"利用低压厂用变压器高压側的中性点时，变压器的容量宜大于100倍接地设备的容量。",{"id":393,"libraryId":5,"type":15,"typeLabel":16,"stem":394,"options":395,"answer":27,"analysis":33},1022936,"高压厂用电系统采用高电阻接地，在中性点设备选择中，有如下问题值得研究。 若设专用的三相接地变压器，构成人为的中性点时，变压器采用Ynd接线，二次侧为开口三角形。变压器一次绕组绝缘需按线电压设计，其原因是（）。",[396,398,400,402],{"key":20,"text":397,"correct":22},"系统单相接地时，绕组短时承受的过电压约为2. 6倍额定电压，故需使变压器绝缘有一定裕度；",{"key":24,"text":399,"correct":22},"根据经验；",{"key":27,"text":401,"correct":32},"单相接地时，变压器绕组将长时间承受系统的线电压；",{"key":30,"text":403,"correct":22},"单相接地时，中性点偏移为相电压，考虑非金属接地，绕组承受的电压大于相电压。",{"id":405,"libraryId":5,"type":15,"typeLabel":16,"stem":406,"options":407,"answer":30,"analysis":33},1022937,"高压厂用电系统采用高电阻接地，在中性点设备选择中，有如下问题值得研究。 若6kV髙压厂用电系统母线段最大单相接地电容电流为7A,电阻接于单相变压器二次侧经单相变压器接入系统的中性点\u002F其电阻值为2Ω，电动机馈线回路装设接地故瘅检测装置，则单相接地变压器容量宜为（）。",[408,410,412,414],{"key":20,"text":409,"correct":22},"22kVA；",{"key":24,"text":411,"correct":22},"23kVA；",{"key":27,"text":413,"correct":22},"24kVA；",{"key":30,"text":415,"correct":32},"25kVA。",{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":27,"analysis":33},1022938,"DL\u002FT5153-2002《火力发电厂厂用电设计技术规定》对短路电流计算和设备选择计算均做出了规定，请对下述各项作出判断。 主保护动作时间与断路器固有分闸时间之和（）时，可不考虑高压厂用电短路电流非周期分量影响。",[420,422,424,426],{"key":20,"text":421,"correct":22},"大于0.11s；",{"key":24,"text":423,"correct":22},"0.11~0.15s之间；",{"key":27,"text":425,"correct":32},"大于0.15s；",{"key":30,"text":427,"correct":22},"不小于0.15s。",{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":30,"analysis":33},1022939,"DL\u002FT5153-2002《火力发电厂厂用电设计技术规定》对短路电流计算和设备选择计算均做出了规定，请对下述各项作出判断。 髙压限流熔断器串真空接触器选择要点，下述说法不对的是（）。",[432,434,436,438],{"key":20,"text":433,"correct":22},"高压熔断器应根据被保护设备的特性进行选择，高庄熔断器一般不并联使用；",{"key":24,"text":435,"correct":22},"熔断器的额定开断电流应大于系统预期最大短路电流周期分量有效值；",{"key":27,"text":437,"correct":22},"在架空线和变压器架空线路组回路中，不宜采用高压眼流熔断器串真空接触器作操作保护设备；",{"key":30,"text":439,"correct":32},"为使绝缘有一定裕度，6kV系统推荐采用额定电压为7.2kV的限流型熔断器。",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":27,"analysis":33},1022940,"DL\u002FT5153-2002《火力发电厂厂用电设计技术规定》对短路电流计算和设备选择计算均做出了规定，请对下述各项作出判断。 低压厂用电系统短路电流计算应考虑的下述原则中，有误的是（）。",[444,446,448,450],{"key":20,"text":445,"correct":22},"应计及系统中的电阻；",{"key":24,"text":447,"correct":22},"低压厂用变压器高压側视为无穷大电源；",{"key":27,"text":449,"correct":32},"在动力中心的馈线短路时，应计及锖线回路阻抗，计及该馈线回路连接的异步电动机的反馈电流；",{"key":30,"text":451,"correct":22},"在动力中心和电动机控制中心内发生短路时，应计及连接在母线上的电动机反馈电流。",{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":20,"analysis":33},1022941,"火力发电厂高、低压电动机应采用高效、节能的交流电动机，下述关于电动机选择叙述中’请进行判断。 关于电动机型式选择，说法错误的是（）。",[456,458,460,462],{"key":20,"text":457,"correct":32},"厂用交流电动机应采用鼠笼式，启动力钜大的设备，电动机应采用深槽式或双鼠笼式；",{"key":24,"text":459,"correct":22},"对200—及以上机组的大容量辅批，可采用双速电动机；",{"key":27,"text":461,"correct":22},"在潮湿、多灰尘的车间，外壳防护等级要达到IP54的要求；",{"key":30,"text":463,"correct":22},"对反复、重载启动或需要小范围调速的机械，电动机可采用绕线式。",{"id":465,"libraryId":5,"type":15,"typeLabel":16,"stem":466,"options":467,"answer":30,"analysis":33},1022942,"火力发电厂高、低压电动机应采用高效、节能的交流电动机，下述关于电动机选择叙述中’请进行判断。 电动机在冷态启动或在热态启动条件下，定子导体温度不应超过A级绝缘200X：或B级绝缘220 C，其冷态和热态启动次数应是（）。",[468,470,472,474],{"key":20,"text":469,"correct":22},"1次，1次；",{"key":24,"text":471,"correct":22},"2次，2次；",{"key":27,"text":473,"correct":22},"1次，2次；",{"key":30,"text":475,"correct":32},"2次，1次。",{"id":477,"libraryId":5,"type":15,"typeLabel":16,"stem":478,"options":479,"answer":27,"analysis":33},1022943,"火力发电厂高、低压电动机应采用高效、节能的交流电动机，下述关于电动机选择叙述中’请进行判断。 厂用电动机安装地点的环境最高温度随海拔高度增高而递减且满足式：（A —1000)X△Q\u002F100-(40-Q) 0时，电动机的额定功率不变。公式所指海拔高度范围是（）。",[480,482,484,486],{"key":20,"text":481,"correct":22},"1000~3000m；",{"key":24,"text":483,"correct":22},"1000~3500m；",{"key":27,"text":485,"correct":32},"1000~4000m；",{"key":30,"text":487,"correct":22},"1000~4500m,",{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":30,"analysis":33},1022944,"关于火电厂高压厂用变压器容量和阻抗选择，下述各项叙述了选择的原则，请对其正确性进行判断。 高压变压器阻抗选择，应使变压器阻抗满足一定的要求，下述有误的是（）。",[492,494,496,498],{"key":20,"text":493,"correct":22},"应使厂用电系统能采用轻型的设备；",{"key":24,"text":495,"correct":22},"应满足厂用电动机正常启动和在各种自启动时的母线电压水平；",{"key":27,"text":497,"correct":22},"在正常电源电压偏移和厂用负荷波动的情况下，变压器的阻抗选择应满足厂用电各级母线电压偏移不超过士",{"key":30,"text":499,"correct":32},"应考虑变压器阻抗对电缆热穗定和动稳定的影响，",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":27,"analysis":33},1022945,"关于火电厂高压厂用变压器容量和阻抗选择，下述各项叙述了选择的原则，请对其正确性进行判断。 选择高压厂用变压器阻抗时应根据各厂具体情况确定，但对装于发电机出口的髙压厂用变压器，其电源电压波动范围应按（）考虑。",[504,506,508,510],{"key":20,"text":505,"correct":22},"—10%~+5%；",{"key":24,"text":507,"correct":22},"-5%~+5%；",{"key":27,"text":509,"correct":32},"0~+5%；",{"key":30,"text":511,"correct":22},"+5%~+10%。",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":24,"analysis":33},1022946,"关于火电厂高压厂用变压器容量和阻抗选择，下述各项叙述了选择的原则，请对其正确性进行判断。 容量为2MW及以下的高压电动机可不校验正常启动时的电压水平，电动机功率(kW)与变压器额定容量（kV A)比率为（）时也可不校验正常启动时的高压厂用电电压水平。",[516,518,520,522],{"key":20,"text":517,"correct":22},"小于20%；",{"key":24,"text":519,"correct":32},"不大于20%；",{"key":27,"text":521,"correct":22},"小于30%；",{"key":30,"text":523,"correct":22},"不大于30%.",{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":27,"analysis":33},1022947,"水电厂厂用电具有厂用负荷较小、供电范围较大、电厂建设周期较长要便于过渡等特点，为适应这些特点，厂用电电源应满足以下条件。 不符合厂用电电源基本要求的是（）。",[528,530,532,534],{"key":20,"text":529,"correct":22},"电源相对独立；",{"key":24,"text":531,"correct":22},"满足各种运行方式下的厂用电负荷需要并保证供电；",{"key":27,"text":533,"correct":32},"投资最少；",{"key":30,"text":535,"correct":22},"当一个电源故障时，另一电源应能自动或远方操作切换投入。",{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":24,"analysis":33},1022948,"水电厂厂用电具有厂用负荷较小、供电范围较大、电厂建设周期较长要便于过渡等特点，为适应这些特点，厂用电电源应满足以下条件。 厂用电电源基本要求之一是电源相对独立，下列观点正确的是（）。",[540,542,544,546],{"key":20,"text":541,"correct":22},"厂用电变压器电源侧装有断路器的称独立电源；",{"key":24,"text":543,"correct":32},"若干厂用电电源中，任一电源发生故障，在继电保护正常动作情况下，不致使其他电源同时失掉，均称独立电源；",{"key":27,"text":545,"correct":22},"发电机电压母线上接有一台厂用电变压器、在该段母线上引出的供电线路上\"T”接另一台厂用电变压器，这两台厂用电变压器均称独立电源；",{"key":30,"text":547,"correct":22},"从联合扩大单元两台主变压器低压侧各接一台厂用电变压器，这两台厂用电变压器称独立电源。",{"id":549,"libraryId":5,"type":15,"typeLabel":16,"stem":550,"options":551,"answer":30,"analysis":33},1022949,"水电厂厂用电具有厂用负荷较小、供电范围较大、电厂建设周期较长要便于过渡等特点，为适应这些特点，厂用电电源应满足以下条件。 厂用电电源基本要求之一是供电可靠，要做到这点，厂用电电源首先考虑从（）引接。",[552,554,556,558],{"key":20,"text":553,"correct":22},"电厂升高电压主母线；",{"key":24,"text":555,"correct":22},"柴油发电机组；",{"key":27,"text":557,"correct":22},"地区电网；",{"key":30,"text":559,"correct":32},"本厂机组。",{"id":561,"libraryId":5,"type":15,"typeLabel":16,"stem":562,"options":563,"answer":27,"analysis":33},1022950,"某水电厂装4台单机容量为40MW的水轮发电机组，采用2个扩大单元接线，发电机电压10.5kV，试回答该电厂厂用供电系统如何考虑。 厂用电电源的数量应不少于(）。",[564,566,568,570],{"key":20,"text":565,"correct":22},"4个；",{"key":24,"text":567,"correct":22},"3个；",{"key":27,"text":569,"correct":32},"2个；",{"key":30,"text":571,"correct":22},"1个。",{"id":573,"libraryId":5,"type":15,"typeLabel":16,"stem":574,"options":575,"answer":24,"analysis":33},1022951,"某水电厂装4台单机容量为40MW的水轮发电机组，采用2个扩大单元接线，发电机电压10.5kV，试回答该电厂厂用供电系统如何考虑。 厂用电电源引接方案宜选用（）。",[576,578,580,582],{"key":20,"text":577,"correct":22},"从两段10.5kV母线上各引接一个电源；",{"key":24,"text":579,"correct":32},"从两段10.5kv母线上各引接一个电源，再从地区电网引接一个电源；",{"key":27,"text":581,"correct":22},"从升高电压主母线上和地区电网各引接一个电源；",{"key":30,"text":583,"correct":22},"从地区电网引接一个电源，再装设柴油发电机组。",{"id":585,"libraryId":5,"type":15,"typeLabel":16,"stem":586,"options":587,"answer":30,"analysis":33},1022952,"某水电厂装4台单机容量为40MW的水轮发电机组，采用2个扩大单元接线，发电机电压10.5kV，试回答该电厂厂用供电系统如何考虑。 厂用电电压和接线方式，选用合适（）。",[588,590,592,594],{"key":20,"text":589,"correct":22},"由髙、低两级电压供电，低压采用单层辐射式供电方式；",{"key":24,"text":591,"correct":22},"由髙、低两级电压供电，低压采用双展辐射式供电方式；",{"key":27,"text":593,"correct":22},"由一级低压供电，采用单层辐射式供电方式；",{"key":30,"text":595,"correct":32},"由一级低压供电，采用双层辐射式供电方式。",{"id":597,"libraryId":5,"type":15,"typeLabel":16,"stem":598,"options":599,"answer":27,"analysis":33},1022953,"某特大型水电厂装机6台，单机容量550MW、发电机出口装设断路器，发电机引出线及分支线均采用离相封闭母线，发电机与变压器组合采用单元接线，试考虑该水电厂高压厂用电系统的设置。 外来电源宜从（）引接。",[600,602,604,606],{"key":20,"text":601,"correct":22},"地区35kV网络；",{"key":24,"text":603,"correct":22},"地方小水电；",{"key":27,"text":605,"correct":32},"施工变电所6kV母线；",{"key":30,"text":607,"correct":22},"550kV主母线。",{"id":609,"libraryId":5,"type":15,"typeLabel":16,"stem":610,"options":611,"answer":30,"analysis":33},1022954,"某特大型水电厂装机6台，单机容量550MW、发电机出口装设断路器，发电机引出线及分支线均采用离相封闭母线，发电机与变压器组 每台机组出口分支线上装有一台厂用电变压器，该变压器髙压侧宜装（）。",[612,614,616,618],{"key":20,"text":613,"correct":22},"断路器；",{"key":24,"text":615,"correct":22},"隔离开关；",{"key":27,"text":617,"correct":22},"负荷开关；",{"key":30,"text":619,"correct":32},"连接片。",[621,624,627,630,633,636],{"id":15,"name":622,"category":7,"favorite":623},"领导干部任职前廉政法规知识测试题",92,{"id":625,"name":626,"category":7,"favorite":15},595,"建筑结构与设备",{"id":628,"name":629,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":631,"name":632,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":634,"name":635,"category":7,"favorite":8},534,"BIM工程师",{"id":637,"name":635,"category":7,"favorite":8},535]