[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-751-20":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":611},{"id":5,"name":6,"category":7,"favorite":8},751,"电气工程师发输变电专业","建筑工程",0,20,50,2670,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,334,346,358,370,382,394,406,416,428,440,452,464,476,488,500,512,524,533,541,553,565,575,587,599],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1022704,1,"单选题","对变压器相间短路后备保护，请回答下列问题。 复合电压启动的过电流保护，其负序电压继电器按躲过正常运行时出现的不平衡电压整定，一般取值为额定电压的（）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","0.02~004倍；",false,{"key":24,"text":25,"correct":26},"B","0.06~0.08倍；",true,{"key":28,"text":29,"correct":22},"C","0.2~0.4倍；",{"key":31,"text":32,"correct":22},"D","0.6~0.8倍。","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},1022705,"对变压器相间短路后备保护，请回答下列问题。 负序过电流和单相式低电压过电流保护，其负序电流继电器的动作电流一般粗约取值为额定电流的（）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"0.03~0.04倍；",{"key":24,"text":41,"correct":22},"0.05~0.06倍；",{"key":28,"text":43,"correct":22},"0.3~0.4倍；",{"key":31,"text":45,"correct":26},"0.5~0.6倍。",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},1022706,"电力系统承受大扰动。 在同级电压的双回线或多回线和环网中，下列大扰动不属于第一类安全稳定标准的是（）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"500kV线路发生单相瞬时接地短路；",{"key":24,"text":53,"correct":22},"500kV线路发生两相短路；",{"key":28,"text":55,"correct":22},"500kV线路发生两相接地短路；",{"key":31,"text":57,"correct":26},"500kV同杆并架双回线异名两相同时发生单相接地故障重合不成功，双回线三相同时跳开。",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1022707,"电力系统承受大扰动。 在同级电压的双回线或多回线和环两中，下列大扰动属于第二级安全稳定标准的是（）。",[62,64,66,68],{"key":20,"text":63,"correct":26},"任一段母线故障；",{"key":24,"text":65,"correct":22},"500kV线路发生三相杻路；",{"key":28,"text":67,"correct":22},"一台600MW发电机无故障跳闸；",{"key":31,"text":69,"correct":22},"直流榆电线路单极故障。",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1022708,"电力系统承受大扰动。 下列大扰动中不属于第三级安全稳定标准的是（）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"故障时断路器拒动；",{"key":24,"text":77,"correct":26},"直流输电线路双极故障；",{"key":28,"text":79,"correct":22},"一回500kV线路三相短路，另一回500kV线路保护误动跳闸；",{"key":31,"text":81,"correct":22},"失去一个大容量发电厂；",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":28,"analysis":33},1022709,"—个220kV变电所，经稳定计算220kV出线发生三相短路，必须快速切除故障，否则不能满足系统稳定要求。 以下配置的主保护正确的是（）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"每回220kV线路各配置一套全线速动的徵机高頻保护作为主保护；",{"key":24,"text":89,"correct":22},"每回线各配里一套微机阶段式相间距离和接地矩离作为主保护；",{"key":28,"text":91,"correct":26},"每回线各配置两套全线速动的微机高频保护作为主保护；",{"key":31,"text":93,"correct":22},"每回线各配置两套?阶段式相间距离和接地距离作为主保护，",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},1022710,"—个220kV变电所，经稳定计算220kV出线发生三相短路，必须快速切除故障，否则不能满足系统稳定要求。 以下配置的后备保护正确的是（）。",[98,100,102,104],{"key":20,"text":99,"correct":26},"每回线配里两套三段式相间、接地距离保护，零序方向电流保护作为后备保护，且每回线路的一套后备保护与一套主保护综合在一起；",{"key":24,"text":101,"correct":22},"每回线配里一套三段式相间、接地距离保护，零序方向电流保护作为后备保护，且主保护与后备保护互相独立；",{"key":28,"text":103,"correct":22},"每回线配里两套三段式相间、接地距离保护，零序方向电流保护作为后备保护，且每回线路的主保护与后备保护互相独立；",{"key":31,"text":105,"correct":22},"每回线配置一套三段式相间、接地距离保护，零序方向电流保护作为后备保护，且与一套主保护综合在一起。",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},1022711,"某220kV线路，当被保护线路中点附近发生两相短路时，请判断线路两端保护的动作行为。 故障线路中有（）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"正序电流和零序电流；",{"key":24,"text":113,"correct":26},"正序电流和负序电流；",{"key":28,"text":115,"correct":22},"负序电流和零序电流；",{"key":31,"text":117,"correct":22},"正序电流、负序电流和零序电流。",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":28,"analysis":33},1022712,"某220kV线路，当被保护线路中点附近发生两相短路时，请判断线路两端保护的动作行为。 线路两端配置的高频闭锁方向保护，保护启动元件动作向对侧保护发出（）信号.",[122,124,126,128],{"key":20,"text":123,"correct":22},"发出允许跳闸信号；",{"key":24,"text":125,"correct":22},"发出直接跳闸信号；",{"key":28,"text":127,"correct":26},"发出闭锁信号；",{"key":31,"text":129,"correct":22},"发出保护动作信号，",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},1022713,"某220kV线路，当被保护线路中点附近发生两相短路时，请判断线路两端保护的动作行为。 以下阶段式保护，保护的动作行为正确的是（）。",[134,136,138,140],{"key":20,"text":135,"correct":26},"相间距离一段动作跳闸；",{"key":24,"text":137,"correct":22},"相间距离二段动作跳闸；",{"key":28,"text":139,"correct":22},"相间距离三段动作跳闸；",{"key":31,"text":141,"correct":22},"接地矩离一段动作跳闸，",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":28,"analysis":33},1022714,"某220kV变电所，220kV主接线为双母线接线，请回答以下问题。 以下母线保护的配置原则中，（）是正确的。",[146,148,150,152],{"key":20,"text":147,"correct":22},"母线上连接元件大于4个时应装设母线保护；",{"key":24,"text":149,"correct":22},"母线上连接元件大于6个时应装设母线保护；",{"key":28,"text":151,"correct":26},"220kV母线应装设能快速有选择地切除故障的母线保护；",{"key":31,"text":153,"correct":22},"当系统稳定有要求时应装设母线保护。",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":31,"analysis":33},1022715,"某220kV变电所，220kV主接线为双母线接线，请回答以下问题。 以下对母线保护的要求中，（）是不正确的。",[158,160,162,164],{"key":20,"text":159,"correct":22},"母线保护宜适应一次各种运行方式来",{"key":24,"text":161,"correct":22},"能满足双母线同时故障及先后故障的动作要求；",{"key":28,"text":163,"correct":22},"母线保护动作时，应闭锁可能误动的横联保护；",{"key":31,"text":165,"correct":26},"母线保护应对线路具有保护的功能。",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":31,"analysis":33},1022716,"220~500kV电网中，配置断路器失灵保护时，请回答以下问题。 以下应配置断路器失灵保护的规定中，（）是不正确的。",[170,172,174,176],{"key":20,"text":171,"correct":22},"对220~500kV分相操作的断路器，可只考虑断路器单相拒动的情况；",{"key":24,"text":173,"correct":22},"线路的后备保护采用近后备方式；",{"key":28,"text":175,"correct":22},"如断路器与电流互感器之间发生故障不能由该回路主保护切除，而由其他线路和变压器后备保护切除又将扩大停电范围，并引起严重后果时；",{"key":31,"text":177,"correct":26},"未配置母线保护的厂、站应配置断路器失灵保护。",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":20,"analysis":33},1022717,"220~500kV电网中，配置断路器失灵保护时，请回答以下问题。 以下断路器失灵保护启动条件中，（）是不正确的：",[182,184,186,188],{"key":20,"text":183,"correct":26},"变压器的瓦斯保护宜启动失灵保护；",{"key":24,"text":185,"correct":22},"故障线路或设备的保护能瞬时复归的出口继电器动作后不返回；",{"key":28,"text":187,"correct":22},"断路器未断开的判别元件，可采用能够快速复归的相电流元件；",{"key":31,"text":189,"correct":22},"若主设备张护出口继电器返回时间不符合要求时，判别元件应双重化。",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":31,"analysis":33},1022718,"220~500kV电网中，配置断路器失灵保护时，请回答以下问题。 以下整定的断路器失灵保护动作时间，（）是不正确的。",[194,196,198,200],{"key":20,"text":195,"correct":22},"宜无时限再次动作于本断路器跳闸；",{"key":24,"text":197,"correct":22},"对双母线（或分段单母线））接线，以较短时限动作于断开母联或分段断路器；",{"key":28,"text":199,"correct":22},"再经一时限动作于断开与拒动断路器连接在同一母线上的所有有电源支路的断路器；",{"key":31,"text":201,"correct":26},"对线路断路器进行一次重合闸。",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":31,"analysis":33},1022719,"某220kV变电所，220kV主接线为双母线（I母和II母）带专用旁路断路器接线，装设有母线保护和断路器失灵保护，对母线保护和断路器失灵保护的动作行为进行分析判断。 当220kVI母线上的一条220kV线路发生三相短路时，以下母线保护的动作行为中，()是正确的。",[206,208,210,212],{"key":20,"text":207,"correct":22},"母线保护动作跳开I母线上的全部断路器；",{"key":24,"text":209,"correct":22},"母线保护动作跳开母联断路器，",{"key":28,"text":211,"correct":22},"母线保护动作跳开I母线上的全部断路器和母联断路器；",{"key":31,"text":213,"correct":26},"母线保护不动作。",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":20,"analysis":33},1022720,"某220kV变电所，220kV主接线为双母线（I母和II母）带专用旁路断路器接线，装设有母线保护和断路器失灵保护，对母线保护和断路器失灵保护的动作行为进行分析判断。 当220kV I母发生单相接地故障时，以下母线保护的动作行为中，（）是正确的。",[218,220,222,224],{"key":20,"text":219,"correct":26},"跳开母联并跳开I母上的全部断路器；",{"key":24,"text":221,"correct":22},"跳开I母上的全部断路器；",{"key":28,"text":223,"correct":22},"跳开母联和专用旁路断路器；",{"key":31,"text":225,"correct":22},"跳开母联断路器。",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":28,"analysis":33},1022721,"某220kV变电所，220kV主接线为双母线（I母和II母）带专用旁路断路器接线，装设有母线保护和断路器失灵保护，对母线保护和断路器失灵保护的动作行为进行分析判断。 当220kV I母上的一条220kV线路发生单相接地故障，本侧220kV线路断路器拒动，以下断路器失灵保护的动作行为中，正确的是（）。",[230,232,234,236],{"key":20,"text":231,"correct":22},"跳开母联断路器；",{"key":24,"text":233,"correct":22},"跳开I段母线上全部断路器；",{"key":28,"text":235,"correct":26},"以较短时限跳开母联，再经一时限跳开I段母线上全部断路器；",{"key":31,"text":237,"correct":22},"跳开母联断路器及II段母线上全部断路器。",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":28,"analysis":33},1022722,"请回答电力系统安全稳定控制技术中的以下问题， 以下安全稳定控制措施中；不属于第一道防线的控制措施的是（）。 A.发电机功率预防性控制；",[242,244,246,248],{"key":20,"text":243,"correct":22},"高压直流输电（HVD",{"key":24,"text":245,"correct":22},"功率调制；",{"key":28,"text":247,"correct":26},"当系统頻率下降时，进行切负荷控制；",{"key":31,"text":249,"correct":22},"并联和串联电容补偿控制。",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":31,"analysis":33},1022723,"请回答电力系统安全稳定控制技术中的以下问题， 以下安全稳定控制措施中，不属于第二道防线的控制措施的是（）。",[254,256,258,260],{"key":20,"text":255,"correct":22},"切除部分发电机；",{"key":24,"text":257,"correct":22},"汽轮机快控气门；",{"key":28,"text":259,"correct":22},"投入制动电阻；",{"key":31,"text":261,"correct":26},"发电机励磁附加控制。",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":20,"analysis":33},1022724,"请回答电力系统安全稳定控制技术中的以下问题， 以下安全稳定控制措施中，第三道防线的控制措施是（）。",[266,268,270,272],{"key":20,"text":267,"correct":26},"系统解列；",{"key":24,"text":269,"correct":22},"串联或并联电容强行补偿；",{"key":28,"text":271,"correct":22},"集中切负荷；",{"key":31,"text":273,"correct":22},"发电机励磁紧急控制，",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":24,"analysis":33},1022725,"安全稳定控制系统中，提出对远方传送信息设备的要求。 采用数字式传送设备，传送直跳式（无就地启动判据）命令，传输时间要求为（）。",[278,280,282,284],{"key":20,"text":279,"correct":22},"≤5ms；",{"key":24,"text":281,"correct":26},"≤1Oms：",{"key":28,"text":283,"correct":22},"≤15ms；",{"key":31,"text":285,"correct":22},"≤20ms。",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":31,"analysis":33},1022726,"安全稳定控制系统中，提出对远方传送信息设备的要求。 采用数字式传输设备，传送实时数据和重要准实时数据时，对数据完整性等级的要求为（）。",[290,292,294,296],{"key":20,"text":291,"correct":22},"10；",{"key":24,"text":293,"correct":22},"11；",{"key":28,"text":295,"correct":22},"12；",{"key":31,"text":297,"correct":26},"13。",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":24,"analysis":33},1022727,"对发电机定子绕组的单相接地故障。 与10. 5kV母线直接连接发电机（不考虑消弧线困的作用），()应装有选择性的接地保护装置，",[302,304,306,308],{"key":20,"text":303,"correct":22},"当单相接地故障电流大于2A时；",{"key":24,"text":305,"correct":26},"当单相接地故障电流大于3A时；",{"key":28,"text":307,"correct":22},"当单相接地故障电流大于4A时；",{"key":31,"text":309,"correct":22},"当单相接地故障电流大于5A时。",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":28,"analysis":33},1022728,"对发电机定子绕组的单相接地故障。 对（）容量机组应装保护区为100%的定子接地保护。",[314,316,318,320],{"key":20,"text":315,"correct":22},"12~25MW的发电机；",{"key":24,"text":317,"correct":22},"50MW及以上的发电机；",{"key":28,"text":319,"correct":26},"100MW及以上的发电机；",{"key":31,"text":321,"correct":22},"200MW及以上的发电机。",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":20,"analysis":33},1022729,"某220kV变电所，220kV电气主接线为双母线，有多回220kV出线，配置有母线保护（含断路器失灵保护)，每回220kV线路配置了一套高频闭锁方向保护和一套高频闭锁距离保护作为线路的主保护，每套主保护中还有完整的阶段式后备保护，分析保护的动作行为。 当1号线路出口发生单相接地短路，以下动作的保护正确的是（)。",[326,328,330,332],{"key":20,"text":327,"correct":26},"1号线路的高频闭锁方向保护动作；",{"key":24,"text":329,"correct":22},"2号线路的髙频闭锁距离保护动作；",{"key":28,"text":331,"correct":22},"1号线路的相间距离一段动作；",{"key":31,"text":333,"correct":22},"2号线路的接地距离一段动作。",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":31,"analysis":33},1022730,"某220kV变电所，220kV电气主接线为双母线，有多回220kV出线，配置有母线保护（含断路器失灵保护)，每回220kV线路配置了一套高频闭锁方向保护和一套高频闭锁距离保护作为线路的主保护，每套主保护中还有完整的阶段式后备保护，分析保护的动作行为。 当发生以上（1)中的故障，且断路器拒动，以下动作行为正确的是（）。",[338,340,342,344],{"key":20,"text":339,"correct":22},"母线保护动作断开母联断路器；",{"key":24,"text":341,"correct":22},"母线保护动作断开1号线路所在母线上的所有连接元件的断路器；",{"key":28,"text":343,"correct":22},"失灵保护动作无时限断开母联断路器及1号线路所在母线上的所有连接元件的断路器；",{"key":31,"text":345,"correct":26},"失灵保护动作无时限以较短时限断开母联断路器；再经一时眼断开1号线路所在母线上的所有连接元件的断路器。",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":24,"analysis":33},1022731,"125MW、13.8kV、cosφ抗浮0.85的发电机，若采用WFB—800系列微机保护装置时，该装置纵联差动为比率制原理，其最小动作电流整定值一般为（）。",[350,352,354,356],{"key":20,"text":351,"correct":22},"200~500A；",{"key":24,"text":353,"correct":26},"615~1845A；",{"key":28,"text":355,"correct":22},"2150~2350A；",{"key":31,"text":357,"correct":22},"2500A。",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":24,"analysis":33},1022732,"50MW、10.5kV、cosφ=0.8的发电机定子绕组过负荷的整定。 定时限对称过负荷保护动作电流为（）。",[362,364,366,368],{"key":20,"text":363,"correct":22},"5000A；",{"key":24,"text":365,"correct":26},"4249A；",{"key":28,"text":367,"correct":22},"2820A；",{"key":31,"text":369,"correct":22},"3510.5A。",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":24,"analysis":33},1022733,"50MW、10.5kV、cosφ=0.8的发电机定子绕组过负荷的整定。 定时限负序过负荷保护动作电流为（）。",[374,376,378,380],{"key":20,"text":375,"correct":22},"172A,",{"key":24,"text":377,"correct":26},"344A；",{"key":28,"text":379,"correct":22},"510A；",{"key":31,"text":381,"correct":22},"588A,",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":20,"analysis":33},1022734,"200MW、15.75kV的发电机，其逆功率保护。 保护动作功率为（）。",[386,388,390,392],{"key":20,"text":387,"correct":26},"2.O~6.OMW；",{"key":24,"text":389,"correct":22},"8.0~10.OMW；",{"key":28,"text":391,"correct":22},"12MW；",{"key":31,"text":393,"correct":22},"15MW。",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":31,"analysis":33},1022735,"200MW、15.75kV的发电机，其逆功率保护。 经汽轮机允许的逆功率时间（），动作于解列。",[398,400,402,404],{"key":20,"text":399,"correct":22},"1.0s；",{"key":24,"text":401,"correct":22},"1.5s；",{"key":28,"text":403,"correct":22},"50~80s；",{"key":31,"text":405,"correct":26},"60~180s动作于解列灭磁。",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":33,"analysis":33},1022736,"200MW、15.75kV、cosφ=0.85发电机选用BCH—2型继电器作为主保护时（假设发电机外部三相短路时流经保护的最大短路电流Id.max=61200 A，机端两相金属性短路时I d.min=18.56A,TA变比为12000\u002F5)。 保护动作电流为（）。 A.3500A；",[410,412,414],{"key":20,"text":411,"correct":22},"5086A,",{"key":24,"text":413,"correct":22},"8060A；",{"key":28,"text":415,"correct":22},"11213",{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":31,"analysis":33},1022737,"200MW、15.75kV、cosφ=0.85发电机选用BCH—2型继电器作为主保护时（假设发电机外部三相短路时流经保护的最大短路电流Id.max=61200 A，机端两相金属性短路时I d.min=18.56A,TA变比为12000\u002F5)。 继电器动作电流为（）。",[420,422,424,426],{"key":20,"text":421,"correct":22},"4.OA,",{"key":24,"text":423,"correct":22},"4.25A；",{"key":28,"text":425,"correct":22},"5.615A；",{"key":31,"text":427,"correct":26},"5.OA。",{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":24,"analysis":33},1022738,"200MW、15.75kV、cosφ=0.85发电机选用BCH—2型继电器作为主保护时（假设发电机外部三相短路时流经保护的最大短路电流Id.max=61200 A，机端两相金属性短路时I d.min=18.56A,TA变比为12000\u002F5)。 灵敏系数为（）。",[432,434,436,438],{"key":20,"text":433,"correct":22},"2；",{"key":24,"text":435,"correct":26},"3.71；",{"key":28,"text":437,"correct":22},"5.02；",{"key":31,"text":439,"correct":22},"4.5.",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":24,"analysis":33},1022739,"200MW、15.75kV汽轮发电机宜装过电压保护。 保护动作电压整定值为（）。",[444,446,448,450],{"key":20,"text":445,"correct":22},"17.325kV；",{"key":24,"text":447,"correct":26},"20.475kV,",{"key":28,"text":449,"correct":22},"22.05kV；",{"key":31,"text":451,"correct":22},"23.625kV。",{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":28,"analysis":33},1022740,"200MW、15.75kV汽轮发电机宜装过电压保护。 保护动作时限一般取()。",[456,458,460,462],{"key":20,"text":457,"correct":22},"O.2s；",{"key":24,"text":459,"correct":22},"0.4s；",{"key":28,"text":461,"correct":26},"O.5s；",{"key":31,"text":463,"correct":22},"0.6s?",{"id":465,"libraryId":5,"type":15,"typeLabel":16,"stem":466,"options":467,"answer":24,"analysis":33},1022741,"240MV A、500\u002F220kV联络自耦变压器，差动保护动作电流为（）。",[468,470,472,474],{"key":20,"text":469,"correct":22},"70.5~75A；",{"key":24,"text":471,"correct":26},"78.4~90.5A；",{"key":28,"text":473,"correct":22},"95.3~105A；",{"key":31,"text":475,"correct":22},"105.5~110.8A。",{"id":477,"libraryId":5,"type":15,"typeLabel":16,"stem":478,"options":479,"answer":20,"analysis":33},1022742,"150MV A、220\u002F110\u002F13.8kV三绕组变压器各侧过负荷保护整定计算。 220kV侧对称过负荷保护的动作电流Idr为（）。",[480,482,484,486],{"key":20,"text":481,"correct":26},"466A；",{"key":24,"text":483,"correct":22},"480A；",{"key":28,"text":485,"correct":22},"500A；",{"key":31,"text":487,"correct":22},"510A。",{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":28,"analysis":33},1022743,"150MV A、220\u002F110\u002F13.8kV三绕组变压器各侧过负荷保护整定计算。 110kV侧对称过负荷保护的动作电流为（）。",[492,494,496,498],{"key":20,"text":493,"correct":22},"915A；",{"key":24,"text":495,"correct":22},"928A；",{"key":28,"text":497,"correct":26},"931.5AS",{"key":31,"text":499,"correct":22},"936A。",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":28,"analysis":33},1022744,"150MV A、220\u002F110\u002F13.8kV三绕组变压器各侧过负荷保护整定计算。 13.8kV侧对称过负荷保护的动作电流为（）。",[504,506,508,510],{"key":20,"text":505,"correct":22},"7500A；",{"key":24,"text":507,"correct":22},"7600A；",{"key":28,"text":509,"correct":26},"7752A；",{"key":31,"text":511,"correct":22},"7832A。",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":20,"analysis":33},1022745,"某工程的主变压器容量为240MVA, XB=15%，高压侧为330kV，其最短线路的长度L=50km，X1=0.34Ω·m。 保护装于变压器高压侧时，阻抗保护整定值为（）。",[516,518,520,522],{"key":20,"text":517,"correct":26},"5.93Ω；",{"key":24,"text":519,"correct":22},"4.1Ω；",{"key":28,"text":521,"correct":22},"6.2Ω",{"key":31,"text":523,"correct":22},"4.5Ω。",{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":24,"analysis":33},1022746,"某工程的主变压器容量为240MVA, XB=15%，高压侧为330kV，其最短线路的长度L=50km，X1=0.34Ω·m。 保护装于发电机机端出口时，阻抗保护整定值为（）。",[528,529,530,532],{"key":20,"text":517,"correct":22},{"key":24,"text":519,"correct":26},{"key":28,"text":531,"correct":22},"6.2Ω；",{"key":31,"text":523,"correct":22},{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":20,"analysis":33},1022747,"阻抗元件的整定值为（）。",[537,538,539,540],{"key":20,"text":20,"correct":26},{"key":24,"text":24,"correct":22},{"key":28,"text":28,"correct":22},{"key":31,"text":31,"correct":22},{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":28,"analysis":33},1022748,"电压元件的整定值为（）。",[545,547,549,551],{"key":20,"text":546,"correct":22},"50~60V；",{"key":24,"text":548,"correct":22},"60~69V；",{"key":28,"text":550,"correct":26},"70—80V;",{"key":31,"text":552,"correct":22},"85~95V。",{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":24,"analysis":33},1022749,"闭锁元件一励磁低电压继电器的动作电压整定值为（）。",[557,559,561,563],{"key":20,"text":558,"correct":22},"180V；",{"key":24,"text":560,"correct":26},"183.3V；",{"key":28,"text":562,"correct":22},"185.5V；",{"key":31,"text":564,"correct":22},"190.1V。",{"id":566,"libraryId":5,"type":15,"typeLabel":16,"stem":567,"options":568,"answer":24,"analysis":33},1022750,"闭锁元件一负序电流动作值为（）。 A. 0.10~0.16A；",[569,571,573],{"key":20,"text":570,"correct":22},"0.18~0. 21 A；",{"key":24,"text":572,"correct":26},"0. 25~0. 30A；",{"key":28,"text":574,"correct":22},"0. 32~0. 36",{"id":576,"libraryId":5,"type":15,"typeLabel":16,"stem":577,"options":578,"answer":31,"analysis":33},1022751,"闭锁元件一负序电压动作值为",[579,581,583,585],{"key":20,"text":580,"correct":22},"1~2V；",{"key":24,"text":582,"correct":22},"2.1~3V；",{"key":28,"text":584,"correct":22},"3~4V；",{"key":31,"text":586,"correct":26},"5~6V。",{"id":588,"libraryId":5,"type":15,"typeLabel":16,"stem":589,"options":590,"answer":28,"analysis":33},1022752,"灭磁电阻的选择。 QFS—50—2发电机转子灭磁电阻1km值为（）。",[591,593,595,597],{"key":20,"text":592,"correct":22},"0.4Ω；",{"key":24,"text":594,"correct":22},"0.56Ω；",{"key":28,"text":596,"correct":26},"0.8Ω；",{"key":31,"text":598,"correct":22},"1.1Ω。",{"id":600,"libraryId":5,"type":15,"typeLabel":16,"stem":601,"options":602,"answer":20,"analysis":33},1022753,"灭磁电阻的选择。",[603,605,607,609],{"key":20,"text":604,"correct":26},"励磁机灭磁电阻2km值为（）。",{"key":24,"text":606,"correct":22},"126Ω；",{"key":28,"text":608,"correct":22},"135Ω； C140Ω；",{"key":31,"text":610,"correct":22},"150Ω。",[612,615,618,621,624,627],{"id":15,"name":613,"category":7,"favorite":614},"领导干部任职前廉政法规知识测试题",92,{"id":616,"name":617,"category":7,"favorite":15},595,"建筑结构与设备",{"id":619,"name":620,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":622,"name":623,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":625,"name":626,"category":7,"favorite":8},534,"BIM工程师",{"id":628,"name":626,"category":7,"favorite":8},535]