[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1024793":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},1024793,751,2,"多选题","300MW及以上的发电机中性点可采用的接地方式有（ ）.",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","不接地；",false,{"key":16,"text":17,"correct":18},"B","消弧线圈接地",true,{"key":20,"text":21,"correct":18},"C","高电阻接地；",{"key":23,"text":24,"correct":14},"D","避雷器接地。","BC","",{"id":6,"name":28,"category":29,"favorite":30},"电气工程师发输变电专业","建筑工程",0]