[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1024561":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},1024561,751,2,"多选题","各类杆塔的正常运行情况的荷载组合为（）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","最大覆冰，相应风速及气温，无断线；",true,{"key":16,"text":17,"correct":14},"B","最大风速，无冰，无断线；",{"key":19,"text":20,"correct":14},"C","最低气温，无冰，无风，无断线（转角及终端杆塔）；",{"key":22,"text":23,"correct":24},"D","年平均气温，无冰，无风，无断线。",false,"ABC","",{"id":6,"name":28,"category":29,"favorite":30},"电气工程师发输变电专业","建筑工程",0]