[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1024286":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},1024286,751,2,"多选题","水电厂厂用电变压器容量的选择和校验要考虑（）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","满足在各种运行方式下，可能出现的最大负荷；",true,{"key":16,"text":17,"correct":14},"B","一台厂用电变压器计划检修或故障，其余厂用电变压器应能担负I、n类厂用电负荷或短时担负厂用电最大负荷；",{"key":19,"text":20,"correct":21},"C","一台厂用电变压器计划检修时，另一台厂用变压器故障，其余厂用电变压器应能担负I、II类厂用电负荷；",false,{"key":23,"text":24,"correct":14},"D","保证需要自启动的电动机在故障消除后电动机启动时母线电压不低于规范的要求。","ABD","",{"id":6,"name":28,"category":29,"favorite":30},"电气工程师发输变电专业","建筑工程",0]