[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1024105":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},1024105,751,2,"多选题","35~110kV无人值班变电所电气二次设备室正确的布S方法是（）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","电气二次设备室的位里选择主要取决于运行管理是否方便；",false,{"key":16,"text":17,"correct":14},"B","电气二次设备室的展位数量主要考虑本期建设需要，适当考虑部分预留屏位，远期屏位不在本期建设规划范围之内；",{"key":19,"text":20,"correct":21},"C","电气二次设备室设施应简化、布里应紧凑；",true,{"key":23,"text":24,"correct":21},"D","电气二次设备室不适宜作为长期有人值班的监控场所，但其面积应满足设备布置和定期巡視维护的要求。","CD","",{"id":6,"name":28,"category":29,"favorite":30},"电气工程师发输变电专业","建筑工程",0]