[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1024064":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},1024064,751,2,"多选题","发电厂控制室的控制方式有()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","单机容量为10OMW的发电厂应采用主控制室控制方式；",false,{"key":16,"text":17,"correct":18},"B","单机容量为125MW的发电厂宜采用单元控制室控制方式；",true,{"key":20,"text":21,"correct":18},"C","单机容量为200MW及以上的发电厂应采用单元控制室控制方式；",{"key":23,"text":24,"correct":18},"D","单机容量为100MW及以下的发电厂宜采用主控制室控制方式，","BCD","",{"id":6,"name":28,"category":29,"favorite":30},"电气工程师发输变电专业","建筑工程",0]