[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1024062":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},1024062,751,2,"多选题","发电厂、变电站电气设备接地线的连接，下列连接要求中正确的是（）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","接地线采用焊接连接；",true,{"key":16,"text":17,"correct":14},"B","当利用穿线的钢管作接地线时，引向电气设备的钢管与电气设备之间，应有可靠的电气连接；",{"key":19,"text":20,"correct":14},"C","接地线与电气设备的连接，可用螺栓连接或焊接；",{"key":22,"text":23,"correct":24},"D","当单个电气设备接地部分与接地母线较远时，宜采用多个设备串接后与接地母线连接。",false,"ABC","",{"id":6,"name":28,"category":29,"favorite":30},"电气工程师发输变电专业","建筑工程",0]