[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1023965":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},1023965,751,2,"多选题","发电机中性点经高电阻接地的目的是（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","为发电机定子接地保护提供电源，便于检测；",true,{"key":16,"text":17,"correct":18},"B","限制长时间中性点位移电压不超过10%×Ue\u002F√3",false,{"key":20,"text":21,"correct":14},"C","限制接地故障电洗尽可能不超过10~15A；",{"key":23,"text":24,"correct":14},"D","限制接地故陣时，健全相的瞬时过电压不超过2.6倍的额定相电压。","ACD","",{"id":6,"name":28,"category":29,"favorite":30},"电气工程师发输变电专业","建筑工程",0]