[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1023769":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1023769,751,1,"单选题","某开关站有500kV出线9回，其中电源进线4回，负荷出线5回。 此开关站的站用电源的方式为（），并最终经比较论证确定。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","设置柴油发电机或由附近较低电压引取；",true,{"key":16,"text":17,"correct":18},"B","由开关站的施工电源引接；",false,{"key":20,"text":21,"correct":18},"C","从500kV高电压母线引取；",{"key":23,"text":24,"correct":18},"D","建立自备发电厂。","按照DL\u002FT 5218—2005 4.1.1规定和工程实际情况，此开关站的站用电源的方式，应为设置柴油发电机或由附近较低电压引取，并最终经比较论证确定为宜",{"id":6,"name":27,"category":28,"favorite":29},"电气工程师发输变电专业","建筑工程",0]