[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1023761":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1023761,751,1,"单选题","35?110kV无人值班变电站的主接线。 若上述条件二回出线中有系统交换潮流，则宜采用（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","外桥接线；",true,{"key":16,"text":17,"correct":18},"B","扩大桥接线；",false,{"key":20,"text":21,"correct":18},"C","内桥接线；",{"key":23,"text":24,"correct":18},"D","单母线。","若上述采用桥形接线的条件下，在二回出线中有系统交换潮流，即流过桥的穿越功 率大，故宜采用外桥接线。",{"id":6,"name":27,"category":28,"favorite":29},"电气工程师发输变电专业","建筑工程",0]