[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1023759":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1023759,751,1,"单选题","35?110kV无人值班变电站的主接线。 可不考虑的因素是（）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","电力系统中的地位；",false,{"key":16,"text":17,"correct":14},"B","出线回路数；",{"key":19,"text":20,"correct":21},"C","设备运输；",true,{"key":23,"text":24,"correct":14},"D","负荷性质。","根据《35kV?110kV无人值班变电所设计规程》(DL\u002FT 5103—1999) 6. 2节对110kV 无人值班变电所主接线设计需考虑的因素和接线方式的相关规定： 6. 2.1条变电站的主接线可不考虑的因素是设备运输；",{"id":6,"name":27,"category":28,"favorite":29},"电气工程师发输变电专业","建筑工程",0]