[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1023735":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1023735,751,1,"单选题","容量200MW机组中性点可采用（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","不接地，经消弧线圈或高电阻接地方式；",true,{"key":16,"text":17,"correct":18},"B","不接地，经消弧线圈或低电阻接地方式；",false,{"key":20,"text":21,"correct":18},"C","经消弧线圈或高阻抗接地方式；",{"key":23,"text":24,"correct":18},"D","经高阻抗接地方式。","",{"id":6,"name":27,"category":28,"favorite":29},"电气工程师发输变电专业","建筑工程",0]