[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1023676":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1023676,751,1,"单选题","某220kV线路，双分裂LGJ—300\u002F40导线，悬垂绝缘子串长为3.Om,计算弧垂用，k值取7.75X10-5l\u002Fm，使用的铁塔如图10所示。 该线路交叉跨越某11OkV线路，无冰无风时导线应力σ=5.6kg\u002Fmm2，其余参数如图12。 A、B分别为220kV线两塔的标髙（A=860m，B=820m）,C为跨越处110kV线的标髙（815m）,L1=200m,L2=350m，不考虑裕度，交叉点两线路间的净空距离为（）m。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","1.5；",false,{"key":16,"text":17,"correct":14},"B","3.5；",{"key":19,"text":20,"correct":21},"C","2.3；",true,{"key":23,"text":24,"correct":14},"D","4.0。","解答过程： 根据《电力工程高压送电线路设计手册》第二版（180页）表3-3-1的有关描述。",{"id":6,"name":27,"category":28,"favorite":29},"电气工程师发输变电专业","建筑工程",0]