[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1023673":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1023673,751,1,"单选题","某220kV线路，双分裂LGJ—300\u002F40导线，悬垂绝缘子串长为3.Om,计算弧垂用，k值取7.75X10-5l\u002Fm，使用的铁塔如图10所示。 该线路气象台（站）记录的风速换算为线路设计重现风速为23m\u002Fs,按标准风压换算为22.5m,设计人员现场调查风速约24.5m\u002Fs,该线路设计最大风速应取（）m\u002Fs。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","23；",false,{"key":16,"text":17,"correct":14},"B","22.5；",{"key":19,"text":20,"correct":21},"C","25；",true,{"key":23,"text":24,"correct":14},"D","24.5。","分析过程： 根据DL\u002FT5092—19996.0.3“110~330kV送电线路最大设计风速不应低于25m\u002Fs”，可知C正确。",{"id":6,"name":27,"category":28,"favorite":29},"电气工程师发输变电专业","建筑工程",0]