[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1023650":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1023650,751,1,"单选题","某电厂新建两台135MW燃煤发电机组，电厂以220kV电压接入系统，出线2回,预留1回。两台机组均采用发电机一变压器组单元接线接入厂内220kV母线。发电机引出线及厂用分支线采用分相封闭母线。 厂用电接线如图7所示，高压电动机负荷引接见表4，已知高压厂用变压器引接点短路容量为2210MV A，髙厂变阻抗为Ud=1O.5%,电动机反馈电流倍数取5.5，试计算髙压厂用变压器供电时IA段6kV母线三相短路电流周期分量起始有效值为（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","24.10kA；",true,{"key":16,"text":17,"correct":18},"B","23.93kA；",false,{"key":20,"text":21,"correct":18},"C","27.27kA；",{"key":23,"text":24,"correct":18},"D","23.80kA。","根据《火力发电厂厂用电设计技术规定》（DL\u002FT5153—2002）附录M的有关公式。 1）计算高厂变引接点短路容量及系统电抗（标么值）",{"id":6,"name":27,"category":28,"favorite":29},"电气工程师发输变电专业","建筑工程",0]