[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1023631":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1023631,751,1,"单选题","某300MW机组火力发电工程，主厂房设两台工作变压器，容量互为备用，设一段电动机控制中心（MC C）,变压器中性点直接接地?选择柴油发电机组时，事故保安A段计算负荷为435kVA,B段计算负荷为430kV A，重复计算负荷300kVA。接于PC和MCC的电负荷资料及厂用电接线见图5。 已知接于保安段的最大电动机额定功率为55kW，其启动电流倍数为7，则柴油发电机的额定容量至少为（）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","565kVA；",false,{"key":16,"text":17,"correct":14},"B","581.5kVA；",{"key":19,"text":20,"correct":21},"C","668.2kVA；",true,{"key":23,"text":24,"correct":14},"D","868.2kVA?","解答过程： 根据DL\u002FT5153—2002附录D计算,Se=435+430-300=565（kVA），Se≥565+[（1-25X7-0.8）X55]\u002F2=668.2（kVA）。",{"id":6,"name":27,"category":28,"favorite":29},"电气工程师发输变电专业","建筑工程",0]