[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1023620":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1023620,751,1,"单选题","某500kV变电站的建设规模如55题所述。变电站为有人值班，设有主控制室、500kV51小室、500kV52小室、220kV小室、主变压器小室。全站设置一套计算机监控系统实现监视、控制、远动等功能，监控系统的站控层设备布置在主控制室内，间隔层设备布置在各个小室内。请确定： 计算机监控系统的站控层与间隔层的连接方式为（）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","不连接；",false,{"key":16,"text":17,"correct":14},"B","只能直接连接；",{"key":19,"text":20,"correct":21},"C","可直接连接，也可通过前置晨设备进行连接；",true,{"key":23,"text":24,"correct":14},"D","只能通过前置层设备进行连接。","解答过程： 根据《220~500kV变电所计算机监控系统设计技术规程》（DL\u002FT5149—2001）5.1、5.2条可判断C正确。",{"id":6,"name":27,"category":28,"favorite":29},"电气工程师发输变电专业","建筑工程",0]