[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1023583":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1023583,751,1,"单选题","某新建2X300MW火力发电厂，每台机组设 A、B两段6kV工作段，全厂设01 A、O1B两段6kV公用段，公用段间设有联络断路器，正常运行时公用段分别由I A、IIA单元段供电。每台机组设一台分裂绕组髙压工作变压器，容量50\u002F27-27MV A，半穿越阻抗U’ dl-2=21%,额定变比20±2X2.5%\u002F6.3—6.3kV。每台机组设一台备用电动给水泵，接于单元B段。发电机出口短路容量为4330MV A，每段6kV母线计算负荷及所接电动机额定功率之和如表3所示。 经估算，6kV高压厂用电工作段所连设备的电缆总电容单相值最大为1.68μ F，该厂用电系统宜采用（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","高电阻接地；",true,{"key":16,"text":17,"correct":18},"B","低电阻接地；",false,{"key":20,"text":21,"correct":18},"C","不接地；",{"key":23,"text":24,"correct":18},"D","消弧线圈接地。","按《电力工程电气设计手册》（1） 80页中的计算公式（3-1）。 根据DL\u002FT5153—2002第4.2.1条要求，宜采用高电阻接地方式。",{"id":6,"name":27,"category":28,"favorite":29},"电气工程师发输变电专业","建筑工程",0]