[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1023527":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1023527,751,1,"单选题","某电厂新建2X300MW国产亚临界燃煤机组，机组以发电机一变压器组单元接线接入220kV系统双母线，220kV配电装g采用双母线母联兼旁路母线接线方式，启动\u002F备用电源由老厂11OkV母线引接，主变压器中性点和启动\u002F备用变中性点经隔离开关接地，根据系统需要可直接接地或不接地运行，发电机中性点经二次侧接有电阻的单相变压器接地，髙厂变压器及启备变压器低压侧中性点经电阻接地，电阻为9.1Ω,400A,发电机次暂态电抗为16.01%。髙压启动\u002F备用变压器的中性点采用固定接地方式，主变压器中性点经隔离开关接地方式，髙压厂用变压器及启\u002F备变半穿越阻抗为21%，高压厂用变压器及髙压启动\u002F备用变压器均采用分裂绕组型变压器，髙压厂用电设两段公用段及脱硫段，分别由机组髙压厂用工作段供电。 对定子绕组过负荷保护的反时限部分的下限电流可选择（）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","3.12A；",false,{"key":16,"text":17,"correct":14},"B","3.84A；",{"key":19,"text":20,"correct":21},"C","4.41A；",true,{"key":23,"text":24,"correct":14},"D","6.24A,","根据《大型发电机变压器继电保护整定计算导则》（DL\u002FT684—1999）15页，反",{"id":6,"name":27,"category":28,"favorite":29},"电气工程师发输变电专业","建筑工程",0]