[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1023521":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1023521,751,1,"单选题","某发电厂高压厂用电电压采用1OkV,中性点经高阻接地，所有负荷在发生单相接地时均要求立即跳闸。热力系统中有电动给水泵1台，配套电机为3000kW。 如该电动给水泵回路的电缆采用YJV—8. 7\u002F10—3X185，根据图纸测量，电缆实际路径为120m，无中间接头，1OkV开关柜处的电缆引接端子距地高度可按低压配电盘考虑，则该电缆的订货长度宜取（）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","120m;",false,{"key":16,"text":17,"correct":14},"B","123m；",{"key":19,"text":20,"correct":14},"C","127m；",{"key":22,"text":23,"correct":24},"D","130m。",true,"解答过程： 根据《电力工程电缆设计规范》（GB50217-1994），第5.1.17条，电缆的计算长度，应包括实际路径长度与附加长度，查附录E，电缆头制作需附长2X0.5=1m（两端），开关柜处附长1m,电动机处附长lm。故计算长度为123m。 根据第5.1.18条，订货长度还要考虑5%~10%的裕量，至少为123X1.05=129.15（m）。 故答案D正确。",{"id":6,"name":27,"category":28,"favorite":29},"电气工程师发输变电专业","建筑工程",0]