[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1023488":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1023488,751,1,"单选题","某8X125MW燃煤机组设置有燃油系统，燃油系统及邻近区域电负荷如表1,所有电机的启动电流倍数均为7,功率因数均为0.8。 以上负荷均按II类负荷。 经计算，PC上向MCC供电的回路的工作电流为500 A，采用框架式断路器，断路器额定电流In=630 A，其短路短延时整定电流值可为In的2、3、4、6、8、10倍，MCC上引接的最大电机为55kW，MCC电源进线处短路时的短路电流为4k A，框架断路器的短路短延时整定值倍数选择（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","2、3、4倍均可；",false,{"key":16,"text":17,"correct":18},"B","3、4倍均可；",true,{"key":20,"text":21,"correct":14},"C","3、4、6倍均可；",{"key":23,"text":24,"correct":14},"D","3~10倍均可。","根据《火力发电厂厂用电设计技术规定》（DL\u002FT 5153—2002）附录Q计算。Iz≥1.35（IQ+ΣIqi=1.35（7X2X55+500-2X55）=1566（A）。 按短路灵敏性校验，IZ≤I\u002F1.5=4000\u002F1.5=2666（A）。 故3倍和4倍整定值满足条件。",{"id":6,"name":27,"category":28,"favorite":29},"电气工程师发输变电专业","建筑工程",0]