[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1023486":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1023486,751,1,"单选题","某8X125MW燃煤机组设置有燃油系统，燃油系统及邻近区域电负荷如表1,所有电机的启动电流倍数均为7,功率因数均为0.8。 以上负荷均按II类负荷。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","本部分电负荷的短路保护拟采用施耐德NS型塑壳式断路器（动作时间5ms），则表中轻油卸油泵的供电回路中，断路器过电流脱扣器整定电流不小于（）。",true,{"key":16,"text":17,"correct":18},"B","714A；",false,{"key":20,"text":21,"correct":18},"C","542A； C567A；",{"key":23,"text":24,"correct":18},"D","60A。","解答过程： 根据《火力发电厂厂用电设计技术规定》（DL\u002FT5153—2002）附录Q计算， Iz≥KIQ=1.7X7X2X30=714（A） 断路器动作时间为5ms，故K取1.7-2,至少应取1.7。",{"id":6,"name":27,"category":28,"favorite":29},"电气工程师发输变电专业","建筑工程",0]