[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1023481":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1023481,751,1,"单选题","某燃煤发电厂，装机容量为4X125MW，以发电机一变压器组单元接线接入220kV及110kV配电装置。220kV送出线路共4回。110kV送出线路共8回，220kV及110kV断路器选用SF6柱式断路器， 发电机的额定功率因数均为0.85。 发电机出口电压为15.75kV。厂址内最热月平均最高温度为35℃。 本工程主变压器合理的选型是（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","四台三绕组（升至220kV及110kV）；",false,{"key":16,"text":17,"correct":18},"B","两台三绕组（升至220kV及110kV）,两台双绕组（升至220kV）；",true,{"key":20,"text":21,"correct":14},"C","四台双绕组（两台升至220kV，两台升至110kV）；",{"key":23,"text":24,"correct":14},"D","三台三绕组（升至220kV及110kV）,—台双绕組（升至110kV）。","根据《火力发电厂设计技术规程》（DL 5000—2000）13.1.7条，连接两种升高电压宜采用三绕组变压器，但三绕组变压器不宜超过两台。",{"id":6,"name":27,"category":28,"favorite":29},"电气工程师发输变电专业","建筑工程",0]