[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1023480":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1023480,751,1,"单选题","某燃煤发电厂，装机容量为4X125MW，以发电机一变压器组单元接线接入220kV及110kV配电装置。220kV送出线路共4回。110kV送出线路共8回，220kV及110kV断路器选用SF6柱式断路器， 发电机的额定功率因数均为0.85。 发电机出口电压为15.75kV。厂址内最热月平均最高温度为35℃。 本工程11OkV及220kV比较合理的主接线方案是（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","220kV双母线接线，110kV双母线接线；",true,{"key":16,"text":17,"correct":18},"B","220kV双母线接线，110kV双母线带专用旁路断路器接线；",false,{"key":20,"text":21,"correct":18},"C","220kV单母线接线，110kV双母线单分段接线；",{"key":23,"text":24,"correct":18},"D","220kV双母线接线，110kV双母线接线带旁路设施。","根据《火力发电厂设计技术规程》（DL 5000-2000）第13.2.11条，《35~110kV变电所设计规范》（GB50059—1992）第3.2.3条以及《220kV~500kV变电所设计技术规程》（DL\u002FT5218—2005）第7.1.4条要求。",{"id":6,"name":27,"category":28,"favorite":29},"电气工程师发输变电专业","建筑工程",0]