[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1023378":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1023378,751,1,"单选题","某大区电力系统2010年规划有关数据如下： 最髙供电负荷（P G）：55500MW（控制月份12月，未计厂用电和线损） 各项备用率：取最高发电负荷的（％）值 负荷备用 2% 事故备用 10% 检修备用 8% 控制月份： 受阻容量（Psh）100MW 空闲容量（Pk）2000MW 厂用电、线损率（％）：7.5% 经过电力平衡计算，控制月份电力供需正好平衡。 该电力系统控制月份总备用容量（Pb）是（）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","11000MW；",false,{"key":16,"text":17,"correct":14},"B","14000MW；",{"key":19,"text":20,"correct":14},"C","13000MW；",{"key":22,"text":23,"correct":24},"D","12000MW。",true,"Pb=Pf（2+10+8）%=60000X20%=12000（MW）",{"id":6,"name":27,"category":28,"favorite":29},"电气工程师发输变电专业","建筑工程",0]