[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1023377":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1023377,751,1,"单选题","某大区电力系统2010年规划有关数据如下： 最髙供电负荷（P G）：55500MW（控制月份12月，未计厂用电和线损） 各项备用率：取最高发电负荷的（％）值 负荷备用 2% 事故备用 10% 检修备用 8% 控制月份： 受阻容量（Psh）100MW 空闲容量（Pk）2000MW 厂用电、线损率（％）：7.5% 经过电力平衡计算，控制月份电力供需正好平衡。 该电力系统2010年最高发电负荷（Pf）是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","60000MW,",true,{"key":16,"text":17,"correct":18},"B","65000MW；",false,{"key":20,"text":21,"correct":18},"C","55000MW；",{"key":23,"text":24,"correct":18},"D","70000MW.","PG=PF（1-%) 式中PG——供电负荷，55500MW； ‘ PF——发电负荷； %——厂用电线损率，7.5%。",{"id":6,"name":27,"category":28,"favorite":29},"电气工程师发输变电专业","建筑工程",0]