[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1023071":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1023071,751,1,"单选题","火力发电厂厂用高压母线接线中关于公用段母线的设置，正确的是（）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","新建大、中型火力发电厂均应设公用段；",false,{"key":16,"text":17,"correct":14},"B","公用段应由启动\u002F备用变压器供电；",{"key":19,"text":20,"correct":14},"C","电厂首台机组与扩建机组相隔时间长（计划不确定等）应设公用段母线；",{"key":22,"text":23,"correct":24},"D","是否设公用段应进行设计优化，经技术经济综合比较后，再确定。",true,"",{"id":6,"name":27,"category":28,"favorite":29},"电气工程师发输变电专业","建筑工程",0]