[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1023009":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1023009,751,1,"单选题","水电厂厂用电最大负荷的分析统计，（）方式可以不考虑，",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","全部机组发电运行；",false,{"key":16,"text":17,"correct":14},"B","部分机组大修，其余机组发电运行；",{"key":19,"text":20,"correct":21},"C","部分机组小修，其余机组发电运行；",true,{"key":23,"text":24,"correct":14},"D","部分机组大修，一台机组调相，其余机组发电运行。","",{"id":6,"name":27,"category":28,"favorite":29},"电气工程师发输变电专业","建筑工程",0]