[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1022976":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1022976,751,1,"单选题","某火电厂设有2X125MW机组，2台机以发电机变压器组接至220kV母线，220kV为双母线接线，出线2回，发电机电压为13.8kV，每台机厂用电负荷计算选择18000kVA,采用20kVA双绕组髙压厂用变压器向6kV工作母线供电（每台机组分2段），厂用高压工作变压器考虑由发电机出口引接。 由发电机出口引接的厂用分支线可（）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","装设不必满足动稳定要求的断路器；",false,{"key":16,"text":17,"correct":14},"B","装设断路器，若断路器开断电流不满足要求，但应采取措施仅允许在开断电流范围切除故障；",{"key":19,"text":20,"correct":21},"C","装设能满足动稳定要求的隔离开关或连接片；",true,{"key":23,"text":24,"correct":14},"D","B和C均可。","根据 DL\u002FT5153—2002第4.2条。",{"id":6,"name":27,"category":28,"favorite":29},"电气工程师发输变电专业","建筑工程",0]