[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1022953":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1022953,751,1,"单选题","某特大型水电厂装机6台，单机容量550MW、发电机出口装设断路器，发电机引出线及分支线均采用离相封闭母线，发电机与变压器组合采用单元接线，试考虑该水电厂高压厂用电系统的设置。 外来电源宜从（）引接。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","地区35kV网络；",false,{"key":16,"text":17,"correct":14},"B","地方小水电；",{"key":19,"text":20,"correct":21},"C","施工变电所6kV母线；",true,{"key":23,"text":24,"correct":14},"D","550kV主母线。","根据DL\u002FT 5164-2002第5.1.3条并从节省投资考虑，外来电源宜从施工变电所6kV母线引接。",{"id":6,"name":27,"category":28,"favorite":29},"电气工程师发输变电专业","建筑工程",0]