[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1022772":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1022772,751,1,"单选题","关于发电机转子表层负序过负荷保护，请回答下列问题。 对于反时限部分表述正确的是（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","反时限部分的上限电流按主变压器髙压侧两相短路电流整定；",true,{"key":16,"text":17,"correct":18},"B","反时限部分的上眼电流按主变压器高压侧三相短路电流整定；",false,{"key":20,"text":21,"correct":18},"C","反时张部分的动作时限需要与相邻元件保护配合；",{"key":23,"text":24,"correct":18},"D","保护动作于解列。","根据DL\u002FT684—19994.5.3条的要求选择，同时也应符合GB\u002FT14285—20064.2.9条的要求。",{"id":6,"name":27,"category":28,"favorite":29},"电气工程师发输变电专业","建筑工程",0]