[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1022767":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1022767,751,1,"单选题","对于转子绕组过负荷保护，请回答下列问题。 下列说法正确的是（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","转子绕组过负荷保护由定时限和反时限两部分组成；",true,{"key":16,"text":17,"correct":18},"B","定时限部分的延时为2s；",false,{"key":20,"text":21,"correct":18},"C","定时限保护动作于解列；",{"key":23,"text":24,"correct":18},"D","反时限保护动作于停机。","根据DL\u002FT684—19994.5.2条的要求选择，同时也应符合GB\u002FT14285—20064.2.10条的要求。",{"id":6,"name":27,"category":28,"favorite":29},"电气工程师发输变电专业","建筑工程",0]